Case Summary (BLD) | | | 4/7/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/6/2007 | | DONE |
|
|
|
|
Third Notice BLD | 7/23/2007 | 7/23/2007 | 10/4/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Fee Review-notes | 4/22/2005 | 4/22/2005 | 10/4/2007 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 1/3/2006 | | 10/4/2007 | | PASS |
|
|
|
Called PDQ for pick up
|
Routing - PLAN CHECK | 1/5/2006 | | 10/4/2007 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 2/10/2006 | | 10/4/2007 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 2/17/2006 | | 10/4/2007 | | PASS |
|
|
|
Sheets A2.1, A2.1.1, (rated corridor modification) A3.11 and fire pump tank modification plan FP1 routed to building for approval.
|
Routing - PLUMBING | 6/29/2006 | | 10/4/2007 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/19/2006 | | 10/4/2007 | | PASS |
|
|
|
|
Telephone call | | | 10/4/2007 | | DONE |
|
|
|
lft vm with jmeas woodbury ###-#### to verify no plum on permit but have values on the cofv 8:45 am
|
Telephone call | | | 8/2/2007 | | DONE |
|
|
|
lft vm with james woodbury ###-#### that plm fees are not on this permit need to find out where he got the amount
|
Second Notice BLD | 7/12/2007 | 7/12/2007 | 7/23/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 6/28/2007 | 7/12/2007 | | DONE |
|
|
|
|
Permanent Occupancy | | 6/28/2007 | 6/28/2007 | | DONE |
|
|
|
|
Permanent occupancy | | | 6/28/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11682 issued 6-28-07 to te Hampton Inns Htel.
|
Plan Reviewer's activity | | | 6/19/2007 | | PASS |
|
|
|
Reviewed submitted information for proposed ceiling insulation at the hotel lobby areas. I have approved the modified energy envelope information and routed the plans to George Slane to determine best course to inspect and verify compliance and issue permanent final. JCM
|
Plan resubmittals received | | | 5/14/2007 | | DONE |
|
|
|
received 1 letter of transmittal, report for building 8 (revised 1st floor hotel function /mid-retail) and 2 copys of sheet A6.1.1 taken to John M
|
Temporary occupancy | | | 5/7/2007 | | DONE |
|
|
|
Temporary Occupancy extended (4-23-2007) for 90 days beginning May 7, 2007. New expiration date is August 6, 2007. Only item remaining is fire protection issue related to potential freezing pipes in the lobby area. jlg.
|
BLD-Final | 5/3/2007 | 5/4/2007 | 5/4/2007 | A | PART |
Dave Hannah
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Victoria Beall everything ok but for zoning and code enforcment
|
FIRE-Final Inspection | 5/2/2007 | 5/3/2007 | 5/3/2007 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
FIRE-Final Inspection | 4/30/2007 | 5/2/2007 | 5/2/2007 | A | DEFR |
Forrest France
|
|
|
Inspection rescheduled per conversation with building engineer.
|
FIRE-Final Inspection | 4/30/2007 | 5/2/2007 | 4/30/2007 | A | CANC |
Forrest France
|
|
|
jim - fire life safety ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith Inspection cancelled from web by: Andrea Whiteman
|
FIRE-Final Inspection | 2/14/2007 | 2/14/2007 | 2/14/2007 | P | FAIL |
Troy Cobbley
|
|
|
All items on the correction notice have been taken care of. I signed the sign-off card. But befor I could make a computer entry I was contacted by Sam ROges about a sprinkler issue above the lobby ceiling. I told Dennis that there would be no sign off from me until the issue is resolved. He is going to take care of the issue and then contact me.
|
BLD-Final | 2/8/2007 | 2/8/2007 | 2/8/2007 | P | PART |
Dave Hannah
|
|
|
going over c/n items
|
BLD-Final | 2/2/2007 | 2/5/2007 | 2/5/2007 | A | PART |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok for temp occ c/n ada issuse
|
BLD-Final | 2/2/2007 | 2/2/2007 | 2/5/2007 | P | PART |
Dave Hannah
|
|
|
ok for temp occ c/n to follow needs other trafdes to go perm and ada issuse addressed
|
FIRE-Final Inspection | 2/2/2007 | 2/2/2007 | 2/2/2007 | P | PART |
Forrest France
|
|
|
Approved temporary occupancy, final approval pending the completion of all items on the correction notice left on site and discussed with general contractor.
|
Temporary occupancy | | | 2/2/2007 | | DONE |
|
|
|
Temp. Occ. Cert. # 5532 issued 2-2-07 to the Hampton Inn Hotel/Garage.
|
FIRE-Final Inspection | 1/30/2007 | 1/31/2007 | 2/1/2007 | P | FAIL |
Forrest France
|
|
|
Missing directional arrows at the 8th floor exit signs, repair the exit sign at the pool room, missing emergency lighting at the elevator lobby and adjacent hall on the first floor.
|
BLD-Final | 1/29/2007 | 1/30/2007 | 1/30/2007 | P | NR |
Dave Hannah
|
|
|
katie - swimming pool; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
FIRE-Final Inspection | 1/29/2007 | 1/30/2007 | 1/30/2007 | A | DEFR |
Forrest France
|
|
|
Rescheduled per conversation with contractor.
|
BLD-Framing/Rough-in | 1/11/2007 | 1/12/2007 | 1/12/2007 | A | PART |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to cover wall between garage and hotel
|
BLD-Conference | 1/9/2007 | 1/9/2007 | 1/10/2007 | P | DONE |
Dave Hannah
|
|
|
dennis - 2 hr wall enclosure ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Framing/Rough-in | 1/8/2007 | 1/8/2007 | 1/8/2007 | P | PART |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 1/5/2007 | 1/5/2007 | 1/8/2007 | P | DEFR |
Dave Hannah
|
|
|
|
Routing - FIRE | 1/8/2007 | | 1/8/2007 | | PASS |
|
|
|
Plan modification of fire pump & secondary water tank-Acceptable per final approved fire sprinkler plans under permit FIR05-00425.
|
BLD-Wall cover | 1/4/2007 | 1/4/2007 | 1/5/2007 | A | NR |
Dave Hannah
|
|
|
Dennis, ###-####
|
CHANGE STATUS TO (ISS) | | | 1/5/2007 | | DONE |
|
|
|
paid fee and picked up plan mod
|
(F) Reprint permit | | | 1/5/2007 | | DONE |
|
|
|
|
OVERRIDE | | | 1/4/2007 | | |
|
|
|
|
OVERRIDE | | | 1/4/2007 | | |
|
|
|
|
OVERRIDE | | | 1/4/2007 | | |
|
|
|
|
OVERRIDE | | | 1/4/2007 | | |
|
|
|
|
OVERRIDE | | | 1/4/2007 | | |
|
|
|
|
OVERRIDE | | | 1/4/2007 | | |
|
|
|
|
OVERRIDE | | | 1/4/2007 | | |
|
|
|
|
Override - Parcel Holds | | | 1/4/2007 | | |
|
|
|
|
Override - Parcel Holds | | | 1/4/2007 | | |
|
|
|
|
Override - People Holds | | | 1/4/2007 | | |
|
|
|
|
Telephone call | | | 1/4/2007 | | DONE |
|
|
|
lft vm with james woodbury ###-#### that permit and fees are ready to be picked up
|
Override - Parcel Holds | | | 1/4/2007 | | |
|
|
|
|
Override - Parcel Holds | | | 1/4/2007 | | |
|
|
|
|
Override - People Holds | | | 1/4/2007 | | |
|
|
|
|
Permit Ready to Issue | | | 1/4/2007 | | |
|
|
|
|
Telephone call | | | 12/29/2006 | | DONE |
|
|
|
lft vm with james woodbury ###-#### to verify the additional val added 9:50 am
|
BLD-Wall cover | 12/11/2006 | 12/12/2006 | 12/13/2006 | A | PART |
Dave Hannah
|
|
|
###-#### - dennis
|
Plan assigned to (JCM) | 11/13/2006 | 11/13/2006 | 12/13/2006 | | PASS |
|
|
|
12/13/2006 08:32:22 JCM - activity updated through activity BLDA022 from case BLD05-01077.
|
Routing - PLAN CHECK | 12/12/2006 | | 12/13/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/13/2006 | | DONE |
|
|
|
|
Routing - PLUMBING | 11/30/2006 | | 12/12/2006 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 12/11/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 12/11/2006 | | |
|
|
|
|
BLD-Other | 11/27/2006 | 11/28/2006 | 11/29/2006 | P | PART |
Dave Hannah
|
|
|
###-#### - dennis note: t-bar tile cover up on 4th floor ok to cover after fire oks
|
Plan resubmittals received | | | 11/29/2006 | | |
|
|
|
Received resubmittals for plan modification: Letter of transmittal and 2 copies of the following pages: P1.1, P2.1, P3.1, M1.1, M2.1, M4.1; taken to John Menard
|
Override - Parcel Holds | | | 11/27/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 11/27/2006 | | |
|
|
|
|
Routing - PLAN CHECK | 11/17/2006 | | 11/22/2006 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 11/22/2006 | | DONE |
|
|
|
E-mailed the applicant requesting revised plumbing and mechanical plans associated with the proposed plan modification. JCM
|
Plan resubmittals received | | | 11/17/2006 | | |
|
|
|
Received 1 cover transmittal, 2 copies of sheet A2.1.1 and taken to John Menard
|
Routing - FIRE | 11/15/2006 | | 11/17/2006 | | PASS |
|
|
|
Attached plan mod comments to plans.
|
Routing - PLAN CHECK | 11/14/2006 | | 11/15/2006 | | FAIL |
|
|
|
|
Plan Reviewer's activity | | | 11/15/2006 | | FAIL |
|
|
|
Reviewed plan modification to relocate the retail trash enclosure to the parking garage; relocate the business center to the west end of meeting room #104; to move the west wall of meeting room #104 approximately eight feet to the west; and to relocate the domestic, hydronic and geothermal water piping and equipment to the old retail trash and business center areas.
|
Plan resubmittals requested | | | 11/15/2006 | | DONE |
|
|
|
E-mailed the applicant requesting additional information. JCM
|
BLD-Final | 11/13/2006 | 11/14/2006 | 11/14/2006 | A | PART |
Dave Hannah
|
|
|
###-#### - dennis part elec rooms 5thru 11 ok
|
BLD-Final | 11/13/2006 | 11/13/2006 | 11/13/2006 | P | NR |
Dave Hannah
|
|
|
###-#### - dennis
|
BLD-Final | 11/9/2006 | 11/13/2006 | 11/13/2006 | A | NR |
Dave Hannah
|
|
|
###-#### - dennis
|
Override - Parcel Holds | | | 11/9/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 11/9/2006 | | |
|
|
|
|
Plan Modification Accepted | | | 11/9/2006 | | |
|
|
|
Plan modification accepeted due to the congestion in the mechanical room housing the fire tank, fire pump, domestic, hyronic & geothermal system it became apparent that additional space is required to adequately house & service the equipment. The proposal is to relocate the biz center next to the meeting room. Relocate the retail trash next to stair #2. Relocating the domestic, hydronic & geothermal to these spaces on pages A0.1, A2.1, A3.14, A6.1, AT4.2, AT4.33, AT4.43, D-1, D-2, D-3; routed to John Menard
|
Override - Parcel Holds | | | 11/9/2006 | | |
|
|
|
|
BLD-Final | 10/26/2006 | 11/3/2006 | 11/7/2006 | A | CANC |
Dave Hannah
|
|
|
Gene ###-####
|
BLD-Final | 10/26/2006 | 11/2/2006 | 11/2/2006 | A | DEFR |
Dave Hannah
|
|
|
Gene ###-####
|
BLD-Final | 10/26/2006 | 11/1/2006 | 11/2/2006 | A | DEFR |
Dave Hannah
|
|
|
Gene ###-####
|
BLD-Final | 10/26/2006 | 10/31/2006 | 11/1/2006 | A | DEFR |
Dave Hannah
|
|
|
Gene ###-####
|
BLD-Final | 10/26/2006 | 10/30/2006 | 10/30/2006 | A | NR |
Dave Hannah
|
|
|
Gene ###-####
|
Override - Parcel Holds | | | 10/26/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 10/26/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 10/26/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 10/26/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 10/26/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 10/26/2006 | | |
|
|
|
|
BLD-Other | 10/12/2006 | 10/13/2006 | 10/13/2006 | A | DONE |
Dave Hannah
|
|
|
dennis - ###-#### - wall cover up
|
Override - Parcel Holds | | | 10/12/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 10/12/2006 | | |
|
|
|
|
Plan assigned to (JCM) | 9/19/2006 | 9/19/2006 | 10/5/2006 | | PASS |
|
|
|
10/5/2006 09:41:13 JCM - activity updated through activity BLDA022 from case BLD05-01077.
|
Plan Reviewer's activity | | | 10/5/2006 | | PASS |
|
|
|
Reviewed and approved fire sprinkler secondary water tank modification. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/5/2006 | | |
|
|
|
|
BLD-Framing/Rough-in | 10/2/2006 | 10/4/2006 | 10/4/2006 | P | PART |
Dave Hannah
|
|
|
interior 5th thru 11th floor \\###-#### dennis x10 room fire proofing ok
|
Routing Off Site - STRUCTURAL | 9/21/2006 | | 10/4/2006 | | PASS |
|
|
|
per john menard call courier for pickup - Received letter from consulting structural engineer approving the secondary water tank modifications with caution on not filling the upper tank completely full. JCM
|
Override - Parcel Holds | | | 10/2/2006 | | |
|
|
|
|
Plan Modification Accepted | | | 9/19/2006 | | |
|
|
|
Plan modification accepted for Bld05-01077 to relocate fire pump from mechanical room to new fire pump room. Fire tank modification from two tanks to one tank on sheets A2.1.1, A3.11, A3.14, S6.5. Routed to John Menard.
|
BLD-Wall cover | 9/15/2006 | 9/15/2006 | 9/15/2006 | P | PART |
Dave Hannah
|
|
|
ok to cover elev lobbys 2 and 3rd floors
|
BLD-Conference | 9/13/2006 | 9/14/2006 | 9/14/2006 | A | PART |
Dave Hannah
|
|
|
Dave, need inspection on exterior? TMC will start brick tomorrow, so do we need a screw sign off on the dens gold? dennis part ok to start brick firs two floors
|
BLD-Wall cover | 9/9/2006 | 9/11/2006 | 9/11/2006 | A | PART |
Dave Hannah
|
|
|
Dave, our door labels are stamped into the frames and hard to read, could you check them out next time you are here. Dennis door frames are marked 1 and 1/2 hr
|
BLD-Wall cover | 9/7/2006 | 9/8/2006 | 9/8/2006 | A | FAIL |
Dave Hannah
|
|
|
Dave, need the 4th floor shaft wall, and 10th 11th floor ceilings, and check the stair handrailing for code. Thanks Dennis ; Phone #: ###-#### ned to rework shafts
|
BLD-Wall cover | 8/28/2006 | 8/28/2006 | 8/28/2006 | P | PART |
Dave Hannah
|
|
|
Dave, pool eq room and 11th elev lobby ok to cover
|
BLD-Wall cover | 8/26/2006 | 8/28/2006 | 8/28/2006 | A | NR |
Dave Hannah
|
|
|
Dave, pool eq room and 11th elev lobby
|
BLD-Wall cover | 8/21/2006 | 8/23/2006 | 8/23/2006 | A | NR |
Dave Hannah
|
|
|
Dave, Pool eq room 4th floor cover up. Dennis; Phone #: ###-####
|
BLD-Framing/Rough-in | 8/16/2006 | 8/17/2006 | 8/17/2006 | A | DONE |
Dave Hannah
|
|
|
Dave, t-bar ceiling areas. Dennis
|
BLD-Framing/Rough-in | 8/16/2006 | 8/17/2006 | 8/17/2006 | A | PART |
Dave Hannah
|
|
|
Dave, t-bar ceiling areas. Dennis ok to cover 9th floor
|
BLD-Wall cover | 8/16/2006 | 8/16/2006 | 8/17/2006 | P | PART |
Dave Hannah
|
|
|
Dave, t-bar ceiling areas. Dennis ok to cover 8th floor
|
FIRE-Sprinkler Rough-in | 8/15/2006 | 8/15/2006 | 8/15/2006 | P | PART |
Forrest France
|
|
|
Inspection requested for sprinkler cover at the guest rooms adjacent to the temp. elevator at the 10th floor is okay, the 11th floor guest room at this location is not ready for inspection.
|
FIRE-Conference | 8/10/2006 | 8/14/2006 | 8/14/2006 | A | DONE |
Forrest France
|
|
|
On site confrence to discuss occupancy requirements for the fourth floor parking area.
|
BLD-Wall cover | 8/9/2006 | 8/10/2006 | 8/10/2006 | P | PART |
Dave Hannah
|
|
|
walk through on 4th and x10 rooms, misc t-bar areas. ok to drop 7th floor ceiling tile and cover ceilings x10 restrooms 6th and 7th fl
|
BLD-Wall cover | 8/4/2006 | 8/4/2006 | 8/4/2006 | A | PART |
Dave Hannah
|
|
|
Dave, late am would be best. or early afternoon. 6th floor. thanks Dennis ok to cover hard lids
|
BLD-Wall cover | 8/2/2006 | 8/3/2006 | 8/3/2006 | A | PART |
Dave Hannah
|
|
|
ok to cover lobby ceiling
|
BLD-Wall cover | 7/26/2006 | 7/27/2006 | 7/27/2006 | A | PART |
Dave Hannah
|
|
|
Please view the 11th floor hallway framing for cover. Thannk you. hallway hard lids ok to cover
|
BLD-Wall cover | 7/25/2006 | 7/26/2006 | 7/26/2006 | P | PASS |
Dave Hannah
|
|
|
dave 7th and 8th floor corridor
|
BLD-Conference | 7/25/2006 | 7/26/2006 | 7/26/2006 | A | PASS |
Dave Hannah
|
|
|
Re-inpection at 7th & 9th floor plumbing pipe fire caulking for wall cover.
|
BLD-Wall cover | 7/24/2006 | 7/25/2006 | 7/25/2006 | A | PART |
Dave Hannah
|
|
|
Framing inspection for levels 8, 9, 10 & 11 room # x10. Please call Ray to view.; Phone #: ###-#### ok to cover walls
|
BLD-Conference | 7/21/2006 | 7/24/2006 | 7/24/2006 | A | PART |
Dave Hannah
|
|
|
Fire Caulking room x10 6th and 7th floor ok to cover walls
|
BLD-Final | 7/20/2006 | 7/21/2006 | 7/21/2006 | A | FAIL |
Dave Hannah
|
|
|
Dave, thought you might want to walk the job. Dennis
|
BLD-Wall cover | 7/12/2006 | 7/13/2006 | 7/13/2006 | P | PART |
Dave Hannah
|
|
|
5th floor drop ceilings in rooms ok to cover
|
BLD-Other | 7/11/2006 | 7/12/2006 | 7/13/2006 | P | FAIL |
Dave Hannah
|
|
|
dennis Note: cover up on the 5th floor; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles room ceilings
|
Plan Reviewer's activity | | | 7/13/2006 | | DONE |
|
|
|
IFC question: Sent the following email answer to Linda Shinshiro's (Devcon's HVAC Consulting Engineer) email request for clarification on IFC 509.1 items 5 and 6.
"Linda, thank you for following up on this, as I somehow overlooked your letter. Instead of sending your letter back with your question/answer sections filled in, I will send my answers by this email to expedite them to you.
In my opinion, the short answers to your two questions are: 1) Item 5 refers to all building air handling systems; and 2) No, the stairwell pressurization fans are not the air-handling equipment referred to in Item 5.
However, I need to elaborate further, because you may have been confused by our parenthetical review comment on Item 6.
IFC 509.1 Item 5 refers to all building air handling systems.
IFC 509.1 Item 6 refers to the fire fighters control panel required by IFC 909.16 for building smoke control systems. Our parenthetical comment on this section “Not applicable” only referred to the fact that there is not a building smoke control system; I apologize that this is misleading. The pressurized stair option is addressed under “smoke proof exit enclosures” in the IBC 909.20, which specifies design requirements which are different than the criteria for building smoke control systems which are addressed in preceding sections of IBC 909 and IFC 909. So technically a stair pressurization system is different than a building smoke control system, but nonetheless it is a type of smoke control system. Refer to IFC 909.16.2 which states “The fire-fighter’s smoke control panel shall provide control capability over the complete smoke-control system equipment within the building as follows…” and then sub-Item 1 states “This includes stairway pressurization fans…”.
So my interpretation is that a fire-fighter’s control panel is required in the FD Command Center per 509.1 item 6 and it will have to include control capability over the stairway pressurization fans per IFC 900.16.2. Again, I apologize if our parenthetical review comment was the source of any confusion.
I will be out of the office tomorrow and next week. I'll be back on 7/24 if you need to discuss this further.
Regards,
Sam
|
Telephone call | | | 7/13/2006 | | DONE |
|
|
|
Conf call with James Woodbury and Gary Filizetti, Devcon, Keith Dilworth, BeDest, D. Hanneman, and others. Agreed: they will submit revised hydraulic calculations for the standpipes based on 750 gpm total demand and use of the tank/pump supply; they will recirculate the PRV discharge back into the fire tank; they will have a Calif. firm design a quality leak detection system (it will not be a low-bid design/build); fire pump and jockey pressure settings will be shown on the final pump/tank test documents given to the fire inspector at the final inspection; the 250 gpm hose demand will remain as specified; the fire tank capacity will remain as shown on the most recently approved plans.
|
Override - Condition Holds | 1/1/1900 | 1/1/1900 | 7/11/2006 | | |
|
|
|
cover up only
|
BLD-Framing/Rough-in | 7/6/2006 | 7/7/2006 | 7/7/2006 | A | PART |
Dave Hannah
|
|
|
south half 11th floor heaters ok to cover
|
BLD-Wall cover | 7/6/2006 | 7/6/2006 | 7/6/2006 | P | PART |
Dave Hannah
|
|
|
ok to cover canopy
|
BLD-Wall cover | 6/30/2006 | 7/5/2006 | 7/5/2006 | A | PART |
Dave Hannah
|
|
|
inspection 11th floor heater closets north half ok to cover
|
Plan resubmittals received | | | 6/29/2006 | | |
|
|
|
Recieved letter to Jennifer Gilliland, and letter to Lee Rice from Engineering Inc., duct system codes attachement #1 & #2, 3pg. specifications for Fire Smoke Dampers, pg. M5.0 & M5.1; taken to Lee Rice
|
BLD-Wall cover | 6/27/2006 | 6/28/2006 | 6/28/2006 | A | PART |
Dave Hannah
|
|
|
Dave please see Paul for lobby Ceiling re-inspection. ok to cover hard lids in lobby and lobby restrooms after other trades have signed off
|
BLD-Wall cover | 6/23/2006 | 6/27/2006 | 6/28/2006 | P | PART |
Dave Hannah
|
|
|
5th floor walls and 11th floor ceilings in rooms ok to cover
|
BLD-Wall cover | 6/23/2006 | 6/26/2006 | 6/27/2006 | P | NR |
Dave Hannah
|
|
|
|
BLD-Conference | 6/15/2006 | 6/15/2006 | 6/15/2006 | P | PART |
Dave Hannah
|
|
|
early afternoon 10 floor south half room ceilings ok to cover
|
BLD-Wall cover | 6/9/2006 | 6/13/2006 | 6/14/2006 | P | PART |
Dave Hannah
|
|
|
ext walls 5th fl ok to cover drop ceiling north half 10th floor ok to cover in rooms
|
BLD-Wall cover | 6/9/2006 | 6/12/2006 | 6/12/2006 | A | PART |
Dave Hannah
|
|
|
7th and 8th floor hallway harde lid areas ok to cover
|
BLD-Wall cover | 6/7/2006 | 6/8/2006 | 6/8/2006 | A | PART |
Dave Hannah
|
|
|
ground floor lobby ok to cover
|
BLD-Wall cover | 6/5/2006 | 6/6/2006 | 6/7/2006 | P | PART |
Dave Hannah
|
|
|
fire proofing at floor levels in stair towers ok to start walls
|
Additional plans submitted | | | 6/6/2006 | | FAIL |
|
|
|
A single plan sheet was submitted to Lee Rice, Mechanical Insp Mgr by the Fire alarm vendor, Protex, showing a duct detector at the top of each of the shafts in lieu of the required detector at each on the three smoke dampered air duct openings on each floor into the shafts. No alternative design request or explanation of equivalency was included. Plan forwarded to Fire. The proposed design is not acceptable to Fire. Plan returned to Lee Rice.
|
BLD-Wall cover | 5/30/2006 | 5/31/2006 | 5/31/2006 | P | NR |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Conference | 5/24/2006 | 5/31/2006 | 5/31/2006 | P | NR |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Conference | 5/24/2006 | 5/30/2006 | 5/30/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-####ext wall 11th floor ok to cover
|
BLD-Wall cover | 5/25/2006 | 5/26/2006 | 5/26/2006 | A | PART |
Dave Hannah
|
|
|
Fire proofing inspection at 9th floor ceiling. Please call Ray when you arrive to inspect. 9th floor room drop ceilings ok to cover
|
BLD-Conference | 5/24/2006 | 5/25/2006 | 5/25/2006 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### south half of 10th floor ok to cover walls
|
BLD-Wall cover | 5/23/2006 | 5/23/2006 | 5/23/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### north half of 10th floor ok to cover int walls
|
BLD-Wall cover | 5/17/2006 | 5/22/2006 | 5/22/2006 | A | NR |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 5/17/2006 | 5/19/2006 | 5/19/2006 | A | FAIL |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 5/16/2006 | 5/17/2006 | 5/17/2006 | A | PART |
Dave Hannah
|
|
|
walked 10th floor int walls not ready but ext wall ok to cover
|
BLD-Wall cover | 5/9/2006 | 5/16/2006 | 5/17/2006 | P | DEFR |
Dave Hannah
|
|
|
|
BLD-Wall cover | 5/9/2006 | 5/15/2006 | 5/15/2006 | P | PART |
Dave Hannah
|
|
|
ceilings on south half 8th floor rooms ok to cover
|
BLD-Wall cover | 5/9/2006 | 5/12/2006 | 5/15/2006 | P | PART |
Dave Hannah
|
|
|
ext walls 10th floor ok to insulate
|
BLD-Wall cover | 5/9/2006 | 5/11/2006 | 5/11/2006 | P | PART |
Dave Hannah
|
|
|
ceiling for rooms north half 8th floor ok to cover
|
BLD-Wall cover | 5/9/2006 | 5/10/2006 | 5/10/2006 | P | PART |
Dave Hannah
|
|
|
ok to cover walls on south half of 9th floor
|
BLD-Wall cover | 5/9/2006 | 5/9/2006 | 5/9/2006 | P | PART |
Dave Hannah
|
|
|
ok to insulate south half of 9th floor
|
BLD-Wall cover | 5/2/2006 | 5/5/2006 | 5/8/2006 | P | DEFR |
Dave Hannah
|
|
|
Please call Dennis or Ray when you arrive.
|
BLD-Conference | 5/4/2006 | 5/5/2006 | 5/5/2006 | A | PASS |
Dave Hannah
|
|
|
dave, YMC and Devcon would like to go over the elevator shaft fire rating one more time. this would be at the roof level. give me a call to set a time. thanks Dennis; Phone #: ###-####
|
BLD-Wall cover | 5/2/2006 | 5/4/2006 | 5/4/2006 | P | PART |
Dave Hannah
|
|
|
Please call dennis or Ray when you arrive. furcaces the rest of 8th floor and walls north half of 9th ok to cover
|
BLD-Wall cover | 5/2/2006 | 5/3/2006 | 5/4/2006 | P | DEFR |
Dave Hannah
|
|
|
Please contact Dennis or Ray when you arrive. out of time for the day
|
BLD-Wall cover | 5/2/2006 | 5/2/2006 | 5/3/2006 | P | PART |
Dave Hannah
|
|
|
Please call Dennis or Ray when you arrive.
|
BLD-Wall cover | 4/27/2006 | 4/28/2006 | 4/28/2006 | A | PASS |
Tom Arcoraci
|
|
|
8th floor floor holes ok 7th floor drops in rooms ok
|
BLD-Wall cover | 4/21/2006 | 4/27/2006 | 4/27/2006 | P | PART |
Tom Arcoraci
|
|
|
Phone #: ###-#### wip
|
BLD-Wall cover | 4/21/2006 | 4/26/2006 | 4/26/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### ok to insulste 9th floor ext walls ok to cover 6th floor heater units
|
BLD-Wall cover | 4/21/2006 | 4/25/2006 | 4/25/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### north half of 8th floor ok to cover walls
|
BLD-Wall cover | 4/24/2006 | 4/24/2006 | 4/24/2006 | P | FAIL |
Dave Hannah
|
|
|
Dave, could we get you first thing monday, say by 9am. for the heater closets at the 6th floor. Thanks Dennis; Phone #: ###-####
|
BLD-Wall cover | 4/21/2006 | 4/24/2006 | 4/24/2006 | A | CANC |
Dave Hannah
|
|
|
Dave, could we get you first thing monday, say by 9am. for the heater closets at the 6th floor. Thanks Dennis; Phone #: ###-####
|
BLD-Wall cover | 4/14/2006 | 4/21/2006 | 4/21/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### wip
|
BLD-Wall cover | 4/20/2006 | 4/21/2006 | 4/21/2006 | A | PART |
Dave Hannah
|
|
|
Dave, RAy say we are ready. south side 6th floor hard lids ok to cover
|
BLD-Wall cover | 4/14/2006 | 4/20/2006 | 4/20/2006 | P | NR |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 4/14/2006 | 4/19/2006 | 4/20/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### wip
|
BLD-Wall cover | 4/14/2006 | 4/18/2006 | 4/19/2006 | P | CANC |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 4/14/2006 | 4/17/2006 | 4/17/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 4/8/2006 | 4/14/2006 | 4/14/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### ok to install hard lids on north half of 6th floor
|
BLD-Wall cover | 4/8/2006 | 4/13/2006 | 4/14/2006 | P | NR |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 4/8/2006 | 4/12/2006 | 4/13/2006 | P | DONE |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 4/8/2006 | 4/11/2006 | 4/11/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 4/8/2006 | 4/10/2006 | 4/10/2006 | P | NR |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 4/3/2006 | 4/10/2006 | 4/10/2006 | A | DONE |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 4/3/2006 | 4/7/2006 | 4/7/2006 | A | DONE |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 4/7/2006 | 4/7/2006 | 4/7/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### pent house ok to cover
|
BLD-Wall cover | 4/3/2006 | 4/6/2006 | 4/6/2006 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 4/3/2006 | 4/5/2006 | 4/5/2006 | A | NR |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 4/3/2006 | 4/4/2006 | 4/4/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### ext walls on 8th floor
|
BLD-Wall cover | 4/3/2006 | 4/3/2006 | 4/3/2006 | A | DONE |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 3/28/2006 | 3/31/2006 | 4/3/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### north half int walls ok to cover on 7th floor
|
BLD-Wall cover | 3/28/2006 | 3/30/2006 | 3/30/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### 8th floor ext wall fire proofing ok
|
BLD-Wall cover | 3/28/2006 | 3/29/2006 | 3/30/2006 | P | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### out of time rescheduled
|
BLD-Wall cover | 3/22/2006 | 3/28/2006 | 3/29/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### south half of 6th floor mins 3 rooms ok to cover
|
BLD-Wall cover | 3/27/2006 | 3/27/2006 | 3/28/2006 | P | FAIL |
Dave Hannah
|
|
|
call me, Dennis; Phone #: ###-#### floor and ceiling fire proofing not completed on south half of 6th floor
|
BLD-Wall cover | 3/20/2006 | 3/27/2006 | 3/27/2006 | A | FAIL |
Dave Hannah
|
|
|
call me, Dennis; Phone #: ###-#### south half of 6th floor
|
BLD-Wall cover | 3/20/2006 | 3/24/2006 | 3/27/2006 | A | NR |
Dave Hannah
|
|
|
call me, Dennis; Phone #: ###-####
|
BLD-Framing/Rough-in | 3/24/2006 | 3/24/2006 | 3/24/2006 | P | NR |
Dave Hannah
|
|
|
call me, Dennis; Phone #: ###-####
|
BLD-Conference | 3/23/2006 | 3/23/2006 | 3/24/2006 | P | PART |
Dave Hannah
|
|
|
dave; Phone #: ###-#### 6th floor ok to cover int walls on north half of floor
|
BLD-Wall cover | 3/20/2006 | 3/23/2006 | 3/24/2006 | P | PART |
Dave Hannah
|
|
|
call me to see if you need to come by. Dennis; Phone #: ###-#### 7th floor ok to insulate ext walls
|
BLD-Wall cover | 3/22/2006 | 3/23/2006 | 3/23/2006 | A | PART |
Dave Hannah
|
|
|
dave some time in am like 9:30, thanks Dennis; Phone #: ###-#### 5th floor plumbing fire caulking ok
|
BLD-Wall cover | 3/20/2006 | 3/22/2006 | 3/22/2006 | P | PART |
Dave Hannah
|
|
|
Dave, cover up walls, ; Phone #: ###-#### ok to insulate ext walls on 7th floor
|
BLD-Wall cover | 3/20/2006 | 3/21/2006 | 3/21/2006 | A | PART |
Dave Hannah
|
|
|
Dave, cover up walls, i have 10 am meeting so eairler will be better. ; Phone #: ###-#### north half of 6th floor ok to cover ext wall
|
BLD-Wall cover | 3/10/2006 | 3/17/2006 | 3/17/2006 | A | FAIL |
Dave Hannah
|
|
|
Dave, cover up of walls; Phone #: ###-#### wrong kind if vapor bar on 6th flr
|
BLD-Wall cover | 3/10/2006 | 3/16/2006 | 3/16/2006 | A | PART |
Dave Hannah
|
|
|
Dave, fire proofing inspections give me a call, Dennis; Phone #: ###-#### work in progress oh 5th and 6th floors
|
BLD-Conference | 3/10/2006 | 3/16/2006 | 3/16/2006 | A | PART |
Dave Hannah
|
|
|
Dave, cover up of walls; Phone #: ###-#### ok to open 1st,second and third floors of parking garage
|
FIRE-Final Inspection | 3/15/2006 | 3/16/2006 | 3/16/2006 | A | PART |
Forrest France
|
|
|
Correction notice items related to the parking garage ground level, 2nd and 3rd levels have been verified for completion, fire alarm and sprinkler associated with the garage 1st,2nd and 3rd levels for temporary occupancy in this limited area ONLY are completed.
|
BLD-Wall cover | 3/10/2006 | 3/15/2006 | 3/16/2006 | A | PART |
Dave Hannah
|
|
|
Dave, fire proofing inspections give me a call, Dennis; Phone #: ###-#### work in progress on 5th and 6th floors
|
BLD-Final | 3/14/2006 | 3/15/2006 | 3/16/2006 | A | NR |
Dave Hannah
|
|
|
Dave please contact me on time, Forest has to look at the e-lights one more time, like to get the sign off tomorrow am. thanks Dennis; Phone #: ###-#### still needs fire F/L/S sign off
|
BLD-Wall cover | 3/10/2006 | 3/14/2006 | 3/15/2006 | P | PART |
Dave Hannah
|
|
|
Dave, fire proofing inspections give me a call, Dennis; Phone #: ###-####
|
FIRE-Final Inspection | 3/14/2006 | 3/15/2006 | 3/15/2006 | A | FAIL |
Forrest France
|
|
|
Provide keys in knox box, relocate temporary fence at alley to allow access to fire dept. WPI and FDC, provide signage at the door to the riser/pump room, provide lockout for air compressor circut switches, provide emergency egress illumination for the exit corridor from the fire command center, install work table for the fire command center.
|
BLD-Wall cover | 3/7/2006 | 3/14/2006 | 3/14/2006 | A | CANC |
Dave Hannah
|
|
|
Call Dennis Harter for time.; Phone #: ###-####
|
BLD-Final | 3/13/2006 | 3/14/2006 | 3/14/2006 | A | NR |
Dave Hannah
|
|
|
Dave, Forest will walk tomorrow at 8:30 for the life safety, if you could be down here shortly after that say 9:30 to walk. thanks Dennis; Phone #: ###-####
|
FIRE-Final Inspection | 3/13/2006 | 3/14/2006 | 3/14/2006 | A | FAIL |
Forrest France
|
|
|
Life safety Inspection for the parking structure ground level, 2nd, and 3rd floors for temp. occupancy failed due to non-functional emergency lights at the 2nd and 3rd levels, fire extinguishers at two locations are mounted too high, minor fire sprinkler issues,emergency lighting at stair #3 not tested, fire apparatus access roads must meet requirements of IFC 2003 503.2.1 and 503.4.
|
BLD-Final | 3/7/2006 | 3/10/2006 | 3/14/2006 | P | NR |
Dave Hannah
|
|
|
Call Dennis Harter for time.; Phone #: ###-####
|
FIRE-Final Inspection | 3/10/2006 | 3/13/2006 | 3/13/2006 | P | NR |
Forrest France
|
|
|
The project related alarm and sprinkler must be approved prior to life safety final.
|
BLD-Wall cover | 3/7/2006 | 3/13/2006 | 3/13/2006 | A | PART |
Dave Hannah
|
|
|
Call Dennis Harter for time.; Phone #: ###-####
|
BLD-Wall cover | 3/7/2006 | 3/10/2006 | 3/10/2006 | A | FAIL |
Dave Hannah
|
|
|
Call Dennis Harter for time.; Phone #: ###-#### still working on fire proofing
|
BLD-Final | 3/7/2006 | 3/9/2006 | 3/9/2006 | A | PART |
Dave Hannah
|
|
|
Call Dennis Harter for time.; Phone #: ###-####
|
BLD-Wall cover | 3/7/2006 | 3/9/2006 | 3/9/2006 | A | PART |
Dave Hannah
|
|
|
Call Dennis Harter for time.; Phone #: ###-####
|
BLD-Wall cover | 3/7/2006 | 3/8/2006 | 3/8/2006 | A | DONE |
Dave Hannah
|
|
|
Call Dennis Harter for time.; Phone #: ###-####
|
BLD-Wall cover | 2/28/2006 | 3/7/2006 | 3/8/2006 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 3/1/2006 | 3/6/2006 | 3/6/2006 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### fite protection 6th floor
|
BLD-Framing/Rough-in | 3/3/2006 | 3/3/2006 | 3/6/2006 | P | PART |
Dave Hannah
|
|
|
Dave, Hanna, AM inspection ; Phone #: ###-#### 5th and 6th floor fire proofing
|
BLD-Wall cover | 2/28/2006 | 3/3/2006 | 3/6/2006 | A | PART |
Dave Hannah
|
|
|
Dave, Hanna, AM inspection ; Phone #: ###-#### 5th and 6th floor
|
BLD-Wall cover | 3/2/2006 | 3/2/2006 | 3/3/2006 | P | PART |
Dave Hannah
|
|
|
fire protection floor and columns 5th flr
|
Print Occupancy Form | | | 3/3/2006 | | DONE |
|
|
|
|
BLD-Wall cover | 3/1/2006 | 3/2/2006 | 3/2/2006 | A | CANC |
Tom Arcoraci
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 2/28/2006 | 3/1/2006 | 3/1/2006 | A | PART |
Dave Hannah
|
|
|
Dave, Hanna, AM inspection ; Phone #: ###-#### ext beam fire proofing ok6th fl
|
BLD-Framing/Rough-in | 2/23/2006 | 2/24/2006 | 2/24/2006 | A | NR |
Dave Hannah
|
|
|
Inspection---please call Dennis Harter at ###-#### Internet Inspection Request from: Alex Monge
|
Routing - FIRE | 2/17/2006 | | 2/24/2006 | | FAIL |
Bill Alexander
|
|
|
FIR05-00425 Secondary Water Supply
1. This re-modified secondary water supply system for the new 235,965-ft/2, eleven story high rise structure is currently not a standard secondary water storage holding system. Under IFC 104.7.2, this reviewing authority shall require the following minimum requirements:
A. Obtain and submit approval incorporating (wet) stamped plan/s and reviewing comment letter from an approved, current, registered certified Fire Protection Engineer, of a design meeting the minimum requirements in regard to the associated current adopted NFPA 13, 20, 22 and 72 pamphlets, with approval of the secondary water supply "tank" that includes, (but may not be limited to) associated sizing's, locations, fire pump connection/s, fill line/s, overflow and associated (listed) manufacturer's controls, sensing and related devices and appurtenances being incorporated in the required automatic secondary water supply system in this facility.
February 10, 2006 - Provided revised tank and piping plans. Several issues found under this submittal which need addressed, verified and corrected:
i) Possible pump cavitation problem relating to the upper tank draw down level equal to the "0" head level of the lower tank allowing suction (entrance) of air being drawn into the pump suction line. Provide a design which will verify and prevent possible pump cavitation and failure.
February 24, 2006 - Designers revised plan include a "P" trap on the suction line for the 2nd (upper) tank. There is no design verification data provided to address the draft characteristics of each tank, but it would appear the combined tank draw down would draft air since the "P" trap is still above the level of the tank floor (where the level of the required draw down is designed for). This would still enable the suction (entrance) of air in the suction piping and thus create fire booster pump cavitation. Revise and resubmit corrected drawings.
|
Telephone call | | | 2/17/2006 | | DONE |
|
|
|
Telcon from Keith at DeBest. He can't get "stamped" plans from the FPE until Thursday, will submit to us on Friday. He wants to bring over revised fire tank plans now for us to start review to expedite things. I agreed to do that but would not show it as official submittal of plans or release "approved" plans until they submitted the stamped plans. He will bring them in tomorrow morning.
|
Routing - FIRE | 2/7/2006 | | 2/10/2006 | | FAIL |
Bill Alexander
|
|
|
FIR05-00425 - February 10, 2006 - Received revised tank and piping plans submitted by Devcon. Several issues found under this submittal which need addressed, verified and corrected:
i) Possible pump cavitation problem relating to the upper tank draw down level equal to the "0" head level of the lower tank, allowing suction (entrance) of air being drawn into the pump suction line. Provide a design which will verify and prevent possible pump cavitation and failure. Called FPE, Mike Madden and explained. He will re-design and have DeBest submit revised plans with his "review" stamp on them.
ii) The tank fill lines have butterfly separation valves located on the discharge sides of the "Cla-Val" valves? It would be wise to relocate these "butterfly" valves to the supply sides of these valves for separate isolation of the same. This will accommodate individual instead of double deactivation if either requires repair. Review comments sent to DeBest.
February 10, 2006 - The wall extensions, tank load of one over the other, pipe penetrations, modification of tank floor, etc., will require written approval verification by an approved structural engineer by prior to IFC final tank approval.
Resubmittal also included sheets A2.1 and A2.1.1 modified to show rated corridor wall from exterior to Fire Command center. Proposed corridor design and rating acceptable from fire standpoint. Plans routed to JCM for Building approval and distribution of modified plans.
|
Plan resubmittals received | | | 2/7/2006 | | |
|
|
|
5 copies of each of the following; A3.11, A2.1, A2.1.1, cover sheet, classic schedule layout, Hughes Associates response letter. Taken to John M.
|
Routing - FIRE | 12/28/2006 | | 1/5/2006 | | FAIL |
Bill Alexander
|
|
|
1. This re-modified secondary water supply system for the new 235,965-ft/2, eleven story high rise structure is currently not a standard secondary water storage holding system. Under IFC 104.7.2, this reviewing authority shall require the following minimum requirements:
Obtain and submit approval incorporating (wet) stamped plan/s and reviewing comment letter from an approved, current, registered certified Fire Protection Engineer, of a design meeting the minimum requirements in regard to the associated current adopted NFPA 13, 20, 22 and 72 pamphlets, with approval of the secondary water supply "tank" that includes, (but may not be limited to) associated sizings, locations, fire pump connection/s, fill line/s, overflow and associated (listed) manufacturer's controls, sensing and related devices and appurtenances being incorporated in the required automatic secondary water supply system in this facility.
Any structural related issues possibly affected by the F.P.E.'s reviewing design (which have not been incorporated in these resubmitted structural tank plans/documents), shall be fully coordinated and under the full responsibility of DEVCON and it's Architect for the same.
|
Plan resubmittals received | | | 12/28/2005 | | DONE |
|
|
|
Received cover transmittal from Sylvester Ramirez, 3 copies of revised structural calcs and 3 copies of plan sheets A3.11and S6.5 which are structural revisions for the fire tank. Forwarded all items to John M.
|
Permit Ready to Issue | | | 12/22/2005 | | |
|
|
|
|
(F) Reprint permit | | | 12/22/2005 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/22/2005 | | DONE |
|
|
|
re-issued
|
Routing - PLAN CHECK | 12/9/2005 | | 12/21/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/21/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/21/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/21/2005 | | DONE |
|
|
|
|
CHANGE STATUS TO (PND) | | | 12/21/2005 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 4/26/2005 | | 12/21/2005 | | PASS |
|
|
|
12/21/2005 13:52:31 JCM - activity updated through activity BLDA022 from case BLD05-01077.
|
Routing Off Site - STRUCTURAL | 11/28/2005 | | 12/16/2005 | | PASS |
|
|
|
Called P D Q for pick up
|
Routing Off Site - STRUCTURAL | 12/5/2005 | | 12/16/2005 | | PASS |
|
|
|
E-mailed a copy of the additional structural calculations for the secondary water tank. JCM
|
Routing Off Site - STRUCTURAL | 12/12/2005 | | 12/15/2005 | | PASS |
|
|
|
Called P D Q for pick up - Received an e-mailed letter from the consulting structural engineer approving the last submittals on the secondary water tank. JCM
|
Plan resubmittals received | | | 12/12/2005 | | DONE |
|
|
|
Received 1 transmittal , 3 plan check response books , & 3 copy of sheet S6.5 Taken to John M.
|
Routing - FIRE | 11/23/2005 | | 12/9/2005 | | PASS |
|
|
|
Resub acceptable subject to Fire Command center functions being provided as indicated and annotated on sheet A0.1. Phoned architect to advise; review faxed to architect.
|
Plan resubmittals received | | | 12/5/2005 | | |
|
|
|
Received copies of additional structural calculations for the secondary water tank. JCM
|
Plan resubmittals requested | | | 12/2/2005 | | DONE |
|
|
|
E-mailed Sylvester with a copy of the comment list for the secondary water tank requesting revisions. JCM
|
Plan Reviewer's activity | | | 12/1/2005 | | PASS |
|
|
|
Reviewed and approved last resubmitted plan sheets. JCM
|
Routing Off Site - STRUCTURAL | 11/18/2005 | | 12/1/2005 | | FAIL |
|
|
|
Called PDQ for pick up - received an e-mailed comment list from the consultng structural engineer for the secondary water tank requesting revisions. JCM
|
Plan resubmittals received | | | 11/30/2005 | | |
|
|
|
Received (2) copies of sheet A2.1, A3.8 and A8.3. Routed to John M.
|
Plan resubmittals received | | | 11/25/2005 | | |
|
|
|
Received (3) copies of sheet S1.1, S1.2, S2.1, S6.5 and (3) sets of structural calcs for water tank. Routed to John M.
|
Routing - PLAN CHECK | 10/31/2005 | | 11/24/2005 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 11/23/2005 | | DONE |
|
|
|
E-mailed Sylvester Ramirez with a request for additional revisions.
|
Plan resubmittals received | | | 11/18/2005 | | |
|
|
|
Received (1) copy of S6.5 and (3) copies of structural calcs. Routed to John M.
|
Plan resubmittals received | | | 11/18/2005 | | DONE |
|
|
|
Received 1 (Copy of Structural Calcs) & 1 copy of sheets S6.5,A2.1, A2.2,A2.11 Taken to John M.
|
Plan resubmittals received | | | 11/17/2005 | | |
|
|
|
Received (2) copies of sheet A2.1, A2.1.1, A2.2, A2.2.1, kA2.3, A2.3.1, A2.4, A2.4.1, A2.5.1, A2.6.1, A2.7.1, A2.8.1, A2.9.1, A2.10.1, A2.11.1, A3.8, A3.9, A3.11, A5.3.1, A5.4, A7.3, A8.1, A8.2, A8.4, A8.10, AT4.2, S6.5, M1.1, M2.4, P1.4, P1.5, P1.6, P2.3, P2.4 and P2.5. Routed to John M.
|
Plan resubmittals received | | | 11/17/2005 | | |
|
|
|
Received (3) copies of Polyurea tank lining details and product data. Routed to John M.
|
Plan resubmittals requested | | | 11/10/2005 | | DONE |
|
|
|
E-mailed the architect with a copy of the second plan review comment list requesting additional revisions. JCM
|
Routing - FIRE | 10/14/2005 | | 10/31/2005 | | FAIL |
|
|
|
Revised review comments faxed to architect and discussed by phone today; he will bring revised plans in on Wed and discuss with us.
|
Plan resubmittals received | | | 10/27/2005 | | DONE |
|
|
|
Received 1 Building code review, & 2 copys of sheets A2.1,A2.2,A2.3,A2.4,A2.5,A2.6,A2.6.1,A2.7,A2.7.1,A2.8,A2.8.1,A2.9,A2.9.1,A2.10,A2.10.0,A2.11,A2.11.1,A3.7,A3.9,A4.2,A4.3,A4.5,A4.6,A4.7,A5.3.1,A5.3.2,A5.3.3,A5.3.4,A5.3.5,A5.3.6,A5.3.7,A5.3.8,A5.3.9,A7.1,A7.2,A7.3,A8.1,A8.2,A8.4,A8.10,AT4.0,AT4.2,AT4.14,AT4.22,AT4.24AT4.29,AT4.31,AT4.45,M2.2,M2.3,M2.4,M4.2,E-2.1,E-2.5 taken to John M.
|
Plan resubmittals requested | | | 10/14/2005 | | DONE |
|
|
|
E-mailed Sylvester a copy of the second plan review letter requesting additional revisions. JCM
|
Routing - PLAN CHECK | 6/22/2005 | | 10/14/2005 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 9/23/2005 | | |
|
|
|
Received (4) copies of sheet M1.0, M1.1, M1.2, M1.3, M1.4, M1.5, M1.6, M1.7, M2.1, M2.2, M2.3, M2.4, M3.1, M4.1, M4.2 and (4) sets of LM100A Fire Alarm System Wiring Drawings. Two of these sets are included with full plans submittal listed below. Received (2) copies of sheet A0.1, EN.1, A1.1, A1.2, A1.3, A1.4, A1.5, A2.1, A2.1.1, A2.2, A2.2.1, A2.3, A2.3.1, A2.4, A2.4.1, A2.5, A2.5.1, A2.3, A2.6.1, A2.7, A2.7.1, A2.8, A2.8.1, A2.9, A2.9.1, A2.10, A2.10.1, A2.11, A2.11.1, A2.12, A3.1, A3.2, A3.3, A3.4, A3.5, A3.6, A3.7, A3.8, A3.9, A3.10, A4.1, A4.2, A4.3, A4.4, A4.5, A4.6, A4.7, A5.1, A5.2, A5.3, A5.3.1, A5.3.2, A5.3.3, A5.3.4, A5.3.5, A5.3.6, A5.3.7, A5.3.8, A5.3.9, A5.4, A6.1, A6.2, A6.3, A6.4, A6.5, A6.5, A6.6, A6.7, A6.8, A6.9, A6.10, A6.11, A7.1, A7.2, A7.3, A7.4, A7.5, A8.1, A8.2, A8.3, A8.4, A8.5, A8.6, A8.7, A8.8, A8.9, A8.10, AT2.1, AT2.5, AT2.6, AT2.7, AT2.8, AT2.9, AT2.10, AT2.11, AT4.0, AT4.1, AT4.2, AT4.4, AT4.4.1, AT4.4.2, AT4.4.3, AT4.5, AT4.6, AT4.7, AT4.8, AT4.9, AT4.10, AT4.11, AT4.12, AT4.13, AT4.14, AT4.15, AT4.16, AT4.17, AT4.18, AT4.19, AT4.20, AT4.21, AT4.22, AT4.23, AT4.24, AT4.25, AT4.26, AT4.27, AT4.28, AT4.29, AT4.30, AT4.31, AT4.32, AT4.33, AT4.34, AT4.35, AT4.36, AT4.37, AT4.38, AT4.39, AT4.40, AT4.41, AT4.42, AT4.43, AT4.44, AT4.45, AT4.46, AT4.47, AT4.48, AT4.49, AT4.50, AT5.0, AT5.1, AT5.2, AT5.3, AT5.4, AT5.5, AT5.6, AT5.7, AT5.8, AT5.9, AT5.10, PL1.1, PL1.2, Pl1.3, PL1.4, PL1.5, E-001, E-1.0, E-1.2, E-1.4, E-1.5, E-1.6, E-1.7, E-1.8, E-1.9, E-1.10, E-1.11, E-1.12, E-2.1, E-2.2, E-2.3, E-2.4, E-2.5, E-2.6, E-2.7, E-2.8, E-2.9, E-2.10, E-2.11, E-2.12, E-3.1, E-3.2, E-3.3, E-3.4, E-3.5, E-3.6, E-3.7, E-3.8, E-3.9, E-3.10, E-3.11, E-3.12, E-4.01, E-4.02, E-4.03, E-4.04, E-4.05, E-4.06, E-4.07, E-5.01, E-8.01, E-8.02, E-8.03, E-8.04, E-8.05, SE-1, P1.1, P1.2, P1.3, P1.4, P1.5, P1.6, P2.1, P2.2, P2.3, P2.4, P2.5, P2.6, P2.7, P3.1, P4.1 and P4.2. Routed to John M.
|
Meeting | | | 7/14/2005 | | |
|
|
|
Met with Sylvester Ramerez and two representatives from the project mechanical engineering firm to discuss some building design options and several items on the plan review comment list.
|
1st review completed | | | 6/22/2005 | | FAIL |
|
|
|
failed plan check and fire.
|
Routing - FIRE | 6/16/2005 | | 6/22/2005 | | FAIL |
|
|
|
review comments faxed to architect.
|
Plan resubmittals requested | | | 6/16/2005 | | DONE |
|
|
|
E-mailed a copy of the plan review cover letter and comment list to Sylvester Ramirez. JCM
|
Routing - PLAN CHECK | 5/17/2005 | | 6/16/2005 | | FAIL |
|
|
|
|
Routing - PLUMBING | 5/4/2005 | | 5/17/2005 | | PASS |
|
|
|
per plans(P1.1 submitted 5/16) and 2003 upc.
|
Plan resubmittals received | | | 5/16/2005 | | DONE |
|
|
|
Received Transmittal , & 2 Copys of sheet P1.1 Taken to John M.
|
Routing - PLANNING | 5/2/2005 | | 5/4/2005 | | PASS |
|
|
|
Approved per DRH03-00187.
|
Routing - PUBLIC WORKS | 4/26/2005 | | 5/2/2005 | | PASS |
|
|
|
|
Voucher Form | | | 4/28/2005 | | DONE |
Dave Hannah
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/26/2005 | | |
|
|
|
|
Application received | | | 4/22/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/22/2005 | | DONE |
|
|
|
|