Case Summary (BLD) | | | 4/21/2016 | | DONE |
|
|
|
|
BLD-Energy code compliance | 1/23/2006 | 1/26/2006 | 1/26/2006 | A | PASS |
Tony Young
|
|
|
Ward -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Framing/Rough-in | 12/19/2005 | 12/19/2005 | 12/19/2005 | P | PART |
Tom Arcoraci
|
|
|
ward///lives at 1720 for access; Phone #: ###-#### Internet Inspection Request from: Barbara Moore needes elec rough in inspection then it wil be ok to insulate
|
BLD-Foundation | 8/17/2005 | 8/17/2005 | 8/17/2005 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/17/2005 at 9:16:12 AM. Contact: ###-####. ok for footing, 2.6x2.6 footings added. connecting issue to home must still be resolved.
|
BLD-Foundation | 8/15/2005 | 8/15/2005 | 8/15/2005 | P | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/15/2005 at 8:51:52 AM. Contact: ###-####. permit states that this add. is self suporting structure, contractor was planning to connect to existing structure. noted that engineer review and resubmittal to plan reveiw(pep) would be required.
|
BLD-Foundation | 5/13/2005 | 5/16/2005 | 5/16/2005 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/13/2005 at 12:08:00 PM. Contact: ###-####.
garage ftgs, wip 5/16/2005 11:44:06 AM
|
Application received | | | 4/25/2005 | | |
|
|
|
|
Plan assigned to (PEP) | 4/25/2005 | | 4/25/2005 | | PASS |
|
|
|
4/25/2005 10:12:57 PEP - activity updated through activity BLDA022 from case BLD05-01091.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/25/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/25/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 4/25/2005 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/25/2005 | | DONE |
|
|
|
|