Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD05-01114
StatusFinaled
Name CACHE VALLEY ELECTRIC
Site Address 1161 W RIVER ST Unit: 210
Project NameFOREST RIVER IX-2ND FLR
Customer Number 
ePlanReviewNo
Description
(VERIZON WIRELESS)(FOREST RIVER IX-SUITE 210) To remodel an existing 471 sq.ft. tenant space on the 2nd floor for a wireless communication room and install associated rooftop equipment per approved plans and CZC05-00051. Work to include, construction of interior paritions within room to house equipment, installation of two condensers on roof, installation of wireless antenas on each corner of roof, any wood used within the building must be Fire retardant treated per section 603.1, this building is fully fire sprinklered for one-hour substitution any alterations to the sprinkler system shall be per NFPA #13 as regulated by the fire department. Rmh
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes4/27/20054/27/20051/26/2007 DONE
Third Notice BLD1/8/20071/8/20071/16/2007 DONE
Second Notice has not been responded to.
Second Notice BLD9/25/20069/25/20061/8/2007 DONE
First Notice has not been responded to.
First Notice7/26/20067/26/20069/25/2006 DONE
DetailsDave Hannah
BLD-Final7/26/20067/26/20067/26/2006APASS
DetailsDave Hannah
Please call before inspector arrives so that I may meet them and let them into the site. Contact name Donovan; Phone #: ###-#### Internet Inspection Request from: Donovan Waldenmyer
DOC - Permit Finaled7/26/20067/26/20067/26/2006PPASS
DetailsDave Hannah
BLD-Final6/30/20066/30/20066/30/2006PDONE
DetailsDave Hannah
Call prior to inspector arriving at the site, so we are able to let him/her into the site. As a side note: I also scheduled a final Mechanical Inspection today w/ Dixie Fellows. Let me know if there might be a scheduling conflict to get her inspection finaled before I get the building inspection finaled. Thanks; Phone #: 208-###-#### James Internet Inspection Request from: Donovan Waldenmyer
BLD-Final6/30/20066/30/20066/30/2006AFAIL
DetailsDave Hannah
Call prior to inspector arriving at the site, so we are able to let him/her into the site. As a side note: I also scheduled a final Mechanical Inspection today w/ Dixie Fellows. Let me know if there might be a scheduling conflict to get her inspection finaled before I get the building inspection finaled. Thanks; Phone #: 208-###-#### James Internet Inspection Request from: Donovan Waldenmyer duct work pentrating third floor not to code
BLD-Framing/Rough-in4/17/20064/17/20064/17/2006PPASS
DetailsDave Hannah
Jay -- sheetrock, nailing reinspection; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD-Other4/12/20064/14/20064/14/2006PPART
DetailsDave Hannah
Jay -- sheetrock; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong sheetrock ok
BLD-Framing/Rough-in4/12/20064/13/20064/13/2006PPART
DetailsDave Hannah
Jay; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong // for plywood 4-12-06 eus fr rated ply wood ok ok to cover
BLD-Framing/Rough-in4/12/20064/14/20064/12/2006PCANC
DetailsDave Hannah
jay Note: plywood was fire rated; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles /// Cancel per Jay (Cache Valley Electric) 4-12-06 eus
BLD-Framing/Rough-in3/22/20063/23/20063/23/2006APASS
DetailsDave Hannah
Jay; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
Issue PAID IN FULL permit  2/27/2006 DONE
CHANGE STATUS TO (REV)  2/24/2006  
Verizon has decided to do this job, ok to put back into review per Ron H. ( he did not need to see them again ) . ///DLD
Print Occupancy Form  2/24/2006 DONE
Permit Ready to Issue  2/24/2006 DONE
Telephone call  2/24/2006 DONE
lft vm with richard miler ###-#### that permit and fees are ready to be picked up
VOIDED CHANGE STATUS  1/4/2006 DONE
voided permit per shane tanner which is the manager for verizon. still wants plans will put in drawer for pickup
Telephone call  1/3/2006 DONE
talked to mark kimber at ###-#### that permit has expired and my apply for an extension. will let me know
Inspection Record Card- Bld  9/13/2005 DONE
Print Occupancy Form  9/13/2005 DONE
Permit Ready to Issue  9/13/2005 DONE
Telephone call  9/13/2005 DONE
called ###-#### and told Mark permit is ready and fees
Plan assigned to (R_H)5/3/2005 9/12/2005 PASS
9/12/2005 14:03:04 RMH - activity updated through activity BLDA022 from case BLD05-01114.
Routing - PLAN CHECK9/10/2005 9/12/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/12/2005 DONE
Routing - FIRE8/29/2005 9/10/2005 PASS
Resubmittal acceptable; revised comments faxed to architect.
Plan resubmittals received  8/29/2005  
Received plan correction letter in resonse to fire review comments. Routed to Ron H.
Routing - PLAN CHECK5/20/2005 8/29/2005 PEND
Received information for fire department, Routed plans back to fire on 8/29/05, Permit pending fire departments review and approval.
1st review completed  5/20/2005 FAIL
failed plan tech and fire.
Routing - FIRE5/13/2005 5/20/2005 FAIL
Review faxed to architect.
Routing - PLAN CHECK5/6/2005 5/13/2005 PEND
No corrections required by building department review, routed plans to the fire department on 5/13/05, permit pending fire departments review.
Routing - PLANNING5/5/2005 5/6/2005 PASS
Sarah Schafer CZC05-00051-Approved per CZC05-00051.
Routing - PUBLIC WORKS5/3/2005 5/5/2005 PASS
CHANGE STATUS TO (REV)  5/2/2005 DONE
Plans ACCEPTED BY PLAN TECH  5/2/2005  
Plans ACCEPTED BY PLAN TECH  4/28/2005 FAIL
Need Architict stamped plans.. Called Jerry left message to have him call me back 4-28-05 8:49 ///DLD
5/2/05-Discussed the space with Chad Taylor from Verizon. Verified that space is a remainder room less than 1,500 sq.ft. therefore does not require an architect. Okay to begin routing.--Marlene
CHANGE STATUS TO (PND)  4/28/2005  
Need Architict stamped plans.. Called Jerry left message to have him call me back 4-28-05 8:49 ///DLD 5-2-05 Per Marlene ok to put back to rev as they do not need an Architect.. ///DLD
Application received  4/27/2005  
Recd Pcfee & Taken To Pln CK  4/27/2005