CHANGE STATUS TO (FNL) | | | 8/4/2006 | | |
|
|
|
|
BLD-Aging Inspection | 8/1/2006 | 8/1/2006 | 8/1/2006 | | CANC |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 5/10/2006 | 5/10/2006 | 5/10/2006 | | CANC |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 5/10/2006 | 5/10/2006 | 5/10/2006 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 1/26/2006 | 1/27/2006 | 1/27/2006 | P | PASS |
Mike Jordan
|
|
|
Paul; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. ok for perm occ.
|
BLD-Final | 11/28/2005 | 11/28/2005 | 11/28/2005 | P | PEND |
Mike Jordan
|
|
|
paul ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Still needs final on mech. Temp occ given. Still need to inspect glass in doors when they arrive, additional boots required under lavatory sinks for ADA and some additinal door hardware needs to be removed.
|
FIRE-Final Inspection | 11/23/2005 | 11/28/2005 | 11/28/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety issues are satisfactory, c/n items have been completed, inspection passed.
|
BLD-Final | 11/21/2005 | 11/22/2005 | 11/22/2005 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/21/2005 at 1:28:45 PM. Contact: ###-####. Needs life/safety.
|
FIRE-Final Inspection | 11/21/2005 | 11/22/2005 | 11/22/2005 | A | CANC |
Troy Cobbley
|
|
|
No time for inspection
|
FIRE-Final Inspection | 11/17/2005 | 11/18/2005 | 11/18/2005 | A | FAIL |
Troy Cobbley
|
|
|
Provide exit signs and emergency lights as marked on sheet E2.1L, provide approved door hardware on both the interior and exterior keyed/deadbolted doors, provide occupandt load sign, provide braille exit signs per plans, provide the correct remote annunciators and test the duct smoke detectors
|
BLD-Final | 11/17/2005 | 11/18/2005 | 11/18/2005 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/17/2005 at 12:01:30 PM. Contact: ###-####. Elec. final failed.
|
BLD-Other | 11/15/2005 | 11/15/2005 | 11/15/2005 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/15/2005 at 8:26:17 AM. Contact: ###-####. Ceiling grid insp. ok need elec and mech insp before placing tile.
|
BLD-Framing/Rough-in | 10/26/2005 | 10/26/2005 | 10/26/2005 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 10/25/2005 | 10/26/2005 | 10/26/2005 | A | CANC |
Tom Arcoraci
|
|
|
PAUL; Phone #: ###-#### nOTE: Please call 1/2 hr prior to inspection Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 9/14/2005 | 9/15/2005 | 9/15/2005 | P | PART |
Tom Arcoraci
|
|
|
ceiling cover inspection please////rick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 8/30/2005 | 8/31/2005 | 8/31/2005 | P | PART |
Tom Arcoraci
|
|
|
partial framing///rick; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa 2 hr wall ok
|
BLD-Framing/Rough-in | 8/15/2005 | 8/16/2005 | 8/16/2005 | P | PART |
Tom Arcoraci
|
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa partial cover ok rear and freeway side
|
Issue PAID IN FULL permit | | | 7/5/2005 | | |
|
|
|
|
Telephone call | | | 7/1/2005 | | DONE |
|
|
|
lft ms with lou starita ###-####
|
Routing - PLAN CHECK | 6/24/2005 | | 6/27/2005 | | PASS |
|
|
|
Plans and permit approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2005 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 6/27/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/27/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/27/2005 | | DONE |
|
|
|
|
Plan assigned to (JCB) | 5/3/2005 | | 6/27/2005 | | PASS |
|
|
|
6/27/2005 08:25:16 JCB - activity updated through activity BLDA022 from case BLD05-01119.
|
Routing - FIRE | 6/17/2005 | | 6/24/2005 | | FAIL |
|
|
|
Inconsistency between mechanical and electrical for code requirements on the dampers that penetrate the 2 hour fire barrier wall.
|
Additional plans submitted | | | 6/24/2005 | | DONE |
|
|
|
Received sketch (SK-1) from electrical engineer for clarification of penetration protection through the 2 hour fire barrier wall.
|
Routing - FIRE | 6/24/2005 | | 6/24/2005 | | PASS |
|
|
|
E-mailed IFC review comments to Julie Comstock at BRS.
|
Plan resubmittals received | | | 6/17/2005 | | DONE |
|
|
|
Small resubmittal addendum sheets received via e-mail in pdf format. Printed and attached to plans. Also red-lined on plan sheets.
|
Routing - PLAN CHECK | 6/8/2005 | | 6/17/2005 | | PEND |
|
|
|
When approved by Fire Department permit can be issued. Resubmittal plans to route to Fire Department for review.
|
Telephone call | | | 6/16/2005 | | DONE |
|
|
|
Called Julie Comstock of BRS Architects to discuss a few issues. Some issues will be clarified/red-lined on plans and others will need to be addressed/clarified on small addendum sheets.
|
Plan resubmittals received | | | 6/9/2005 | | |
|
|
|
Received (2) copies of sheet G01.1, SD1.1, A1.1, A1.2, A2.1, A6.0, A6.1, A8.1, A8.2, A9.1, A9.2, M1.0, M2.1, M2.2, M2.3, M3.1, M3.2, M3.3, M4.0, E0.0, E2.0D, E2.1F, E2.1L, E2.1P, E2.1MP, E2.1S, E3.0, E3.1, E3.2, E3.4, E3.5 and E3.6. Routed to Jason B.
|
1st review completed | | | 6/8/2005 | | FAIL |
|
|
|
failed plan check and fire.
|
Routing - FIRE | 6/1/2005 | | 6/8/2005 | | FAIL |
|
|
|
review faxed to architect.
|
Routing - PLUMBING | 5/31/2005 | | 6/1/2005 | | PASS |
|
|
|
Approved as noted for equipment and fixture connection verification with plumbing inspector and united water verification at final plumbing inspection, and plan and 2003 UPC.
|
Plan resubmittals requested | | | 5/31/2005 | | DONE |
|
|
|
Plan resubmittals and written response required for further review.
|
Routing - PLAN CHECK | 5/5/2005 | | 5/31/2005 | | FAIL |
|
|
|
Plan review e-mailed and faxed to architect. Plan resubmittals and written response required for further review. Plans to route to Plumbing and Fire Departments.
|
Routing - PLANNING | 5/3/2005 | | 5/5/2005 | | PASS |
|
|
|
Use approved per CUP97-63 and site-building improvements per DRH97-00135.
|
Routing - PUBLIC WORKS | 5/3/2005 | | 5/3/2005 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 5/3/2005 | | 5/3/2005 | | PASS |
|
|
|
ESC waiver request approved with attached conditions.
|
Plans ACCEPTED BY PLAN TECH | | | 4/28/2005 | | |
|
|
|
|
Application received | | | 4/27/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/27/2005 | | |
|
|
|
|
Fee Review-notes | 4/27/2005 | 4/27/2005 | | | |
|
|
|
|