Permit Information
Permit NumberBLD05-01150
StatusFinaled
Name K2 CONSTRUCTION
Site Address 8489 W OVERLAND RD
Project NameRGJ PHASE 2
Customer Number 
ePlanReviewNo
Description
RGJ Investments - Phase 2 (New Shell Building) - To construct a new 6,100 square foot, one story wood framed, restaurant and retail shell building and related site improvements. This is a shell permit only, no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Code Occupancy Approval4/3/20064/3/20064/3/2006PPASS
DetailsScott M.Brown
FINAL OK ALSO OK TO RELASE BOND.
Letter of compliance  4/3/2006 DONE
Letter of Compliance issued 4-3-06.
BLD-Final11/28/200511/29/200511/29/2005APEND
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/28/2005 at 3:17:41 PM. Contact: ###-####. Will be ok for temp. occ once code enforcement has been finaled.
BLD-Final11/28/200511/28/200511/28/2005PFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/28/2005 at 8:23:25 AM. Contact: ###-####. Still needs to post bond.
FIRE-Final Inspection11/23/200511/25/200511/25/2005APASS
DetailsTroy Cobbley
Life safety finaled
Code Occupancy Approval Temp11/23/200511/23/200511/23/2005PFAIL
DetailsScott M.Brown
need to bond $51,000 for landscape, curbing, paint, parking lot stripping.
FIRE-Final Inspection11/22/200511/23/200511/23/2005PCANC
DetailsTroy Cobbley
No time for inspection
BLD-Final11/23/200511/23/200511/23/2005PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/23/2005 at 9:23:09 AM. Contact: ###-####.
Need Code enforce, Fire and...........finals
FIRE-Final Inspection11/21/200511/21/200511/21/2005PCANC
DetailsTroy Cobbley
No time for inspection but I talked to Bob with Lea Electric about the correct remote annunciators for the duct smoke detectors. What they had was wrong per Bob.
BLD-Framing/Rough-in11/10/200511/14/200511/14/2005APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/10/2005 at 4:08:20 PM. Contact: ###-####. Hangars were nailed off. Reviewed RFI From engineer detailing welded connection at column to beam connection.
BLD-Framing/Rough-in10/18/200510/18/200510/18/2005ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/18/2005 at 7:04:32 AM. Contact: ###-####.nail hip hangers/weld colm. to post.
BLD-Energy code compliance10/14/200510/14/200510/14/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/14/2005 at 7:26:55 AM. Contact: ###-####.ok to cover walls / pending hip ridge hanger nailling and vapor barrior at overbuilds can check no ceilling .
Case Summary (BLD)  10/11/2005  
BLD-Framing/Rough-in10/10/200510/10/200510/10/2005PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/10/2005 at 8:00:45 AM. Contact: ###-####.c/n posted/ok to insulate.
BLD-Framing/Rough-in9/30/20059/30/20059/30/2005PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/30/2005 at 7:38:09 AM. Contact: ###-####. roof and wall sheer nailling ok.
BLD-Other9/28/20059/28/20059/29/2005PNR
DetailsJim Storey
steve Note: shear and/or roof; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Aging Inspection9/27/20059/27/20059/27/2005 PASS
DetailsJim Storey
wip
BLD-Foundation7/26/20057/27/20057/27/2005PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/26/2005 at 11:05:20 AM.
BLD-Footing7/20/20057/22/20057/22/2005APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/20/2005 at 2:59:20 PM.
(F) Reprint permit  6/28/2005  
Issue PAID IN FULL permit  6/27/2005 DONE
Inspection Record Card- Bld  6/27/2005 DONE
Inspector's copy Bld permit  6/21/2005 DONE
Permit Ready to Issue  6/21/2005 DONE
Telephone call  6/21/2005 DONE
tlk to billy that permit and fees are ready to be picked up
Plan assigned to (JCM)4/29/20054/29/20056/20/2005 PASS
6/20/2005 14:06:10 JCM - activity updated through activity BLDA022 from case BLD05-01150.
Routing - PLAN CHECK6/17/2005 6/20/2005  
Routing - PUBLIC WORKS6/20/2005 6/20/2005 PASS
Routing - PLAN CHECK6/20/2005 6/20/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/20/2005 DONE
Routing - PLANNING6/16/2005 6/17/2005 PASS
Approved.
Routing - PLAN CHECK6/8/2005 6/16/2005  
Plan Reviewer's activity  6/9/2005 PASS
Reviewed and approved resubmitted plan sheets with plan review red lined corrections. This includes review and approval of the revised shear wall calculations justifying deletion of additional holddowns. JCM
Routing - PLUMBING6/6/2005 6/8/2005 PASS
per plans and 2003 upc
Routing - PLAN CHECK6/3/2005 6/6/2005  
1st review completed  6/3/2005 FAIL
failed planning, plumbing, public works, ESC, structural and plan check.
Routing - FIRE5/25/2005 6/3/2005 PASS
review faxed to architect.
Plan resubmittals received  6/1/2005  
Received (2) copies of sheet A1.1 and A6.3. Routed to John M.
Plan resubmittals received  6/1/2005 DONE
Received Transmittal Letter, & 2 Copys of sheets C1.4,P1.0 Taken to John M.
Routing - PLANNING5/23/2005 5/25/2005 FAIL
Rezone not finalized.
Routing - PLAN CHECK5/25/2005 5/25/2005  
Plan resubmittals requested  5/25/2005 DONE
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  5/23/2005 DONE
Mailed the architect a copy of the comment list requesting revisions. JCM
Routing - Erosion and Sediment5/23/2005 5/23/2005 PASS
ESC plan approved with attached conditions.
Routing - PLAN CHECK5/23/2005 5/23/2005 FAIL
Routing - PLANNING5/16/2005 5/23/2005 FAIL
Rezone not completed.
Routing - PLUMBING  5/16/2005 FAIL
use boise city approved grease interceptor detail, attached. per note 10 page P1.0- provide a civil plan showing the locations of the grease interceptors and sewer connections to the building.
Plan resubmittals received  5/12/2005 DONE
Resubmittals received and forwarded to John M: 2 copies of plan sheet C1.5 and 2 copies of ESC narratives.
Routing - Erosion and Sediment5/10/2005 5/10/2005 FAIL
ESC does not meet conditions set forth in BMC 8-17. Prepared checklist and faxed to PD. RP needed prior to issuance.
Routing - PUBLIC WORKS5/5/2005 5/10/2005 FAIL
Nees proof of private sanitary sewer easement. Contact Jim Pardy at ###-####
Routing Off Site - STRUCTURAL5/2/2005 5/10/2005 FAIL
Called PDQ for pick up.. Received a comment list from the consulting structural engineer requesting revisions. JCM
Routing - PLANNING Land Div4/29/2005 5/4/2005 PASS
Approved as one-time split of original lot.
Plan routing begun/NEW & ADDTN  4/29/2005  
Application received  4/28/2005  
Recd Pcfee & Taken To Pln CK  4/28/2005 DONE
Fee Review-notes4/28/20054/28/2005