BLD-Final | 3/29/2007 | 3/30/2007 | 3/30/2007 | P | PASS |
Jim Storey
|
|
|
dean; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
DOC - Permit Finaled | 3/30/2007 | 3/30/2007 | 3/30/2007 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 3/28/2007 | 3/29/2007 | 3/29/2007 | A | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/28/2007 at 12:19:36 PM. Contact: ###-####.
|
BLD-Energy code compliance | 12/26/2006 | 12/26/2006 | 12/26/2006 | P | PASS |
Jim Storey
|
|
|
framing and ec ok
|
BLD-Energy code compliance | 12/19/2006 | 12/20/2006 | 12/20/2006 | A | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 12/19/2006 at 3:29:37 PM. Contact: ###-####. Remove nonrated box from seperation wall. fireblock furdowns. c/n posted. not ok to cover.
|
BLD-Energy code compliance | 12/19/2006 | 12/19/2006 | 12/19/2006 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/19/2006 at 7:47:17 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/7/2006 | 12/8/2006 | 12/8/2006 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/7/2006 at 2:21:38 PM. Contact: ###-####.need to finsh 2hr wall ok to insulate
|
CHANGE STATUS TO (ISS) | | | 11/9/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 10/31/2006 | | |
|
|
|
|
Case Summary (BLD) | | | 10/31/2006 | | |
|
|
|
|
Telephone call | | | 10/3/2006 | | DONE |
|
|
|
I called Tod with Borup Construction and requested him to fill out his own Alternate design request. (R104.11 Alternate materials, design and methods of construction and equipment.) I also requested he hire his own independent code expert to review his design and formulate a written opinion on his projects specifics. The directive given is that he has his own paperwork for approval. (SRZ)
|
BLD-Framing/Rough-in | 9/15/2006 | 9/18/2006 | 9/19/2006 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/15/2006 at 10:48:07 AM. Contact: ###-####.
|
Case Summary (BLD) | | | 9/18/2006 | | |
|
|
|
|
BLD-Framing/Rough-in | 9/15/2006 | 9/15/2006 | 9/15/2006 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/15/2006 at 10:38:26 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Sep 15 2006 10:53AM.
|
BLD-Foundation | 5/25/2006 | 5/25/2006 | 5/25/2006 | P | FAIL |
Jim Storey
|
|
|
ben ; Phone #: ###-#### - Note:wall need engineering to justify over height wall all per plan
|
BLD-Footing | 5/25/2006 | 5/25/2006 | 5/25/2006 | P | CANC |
Jim Storey
|
|
|
ben ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles per ben
|
Issue PAID IN FULL permit | | | 5/8/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/5/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/5/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/5/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/5/2006 | | DONE |
|
|
|
Spoke with Trevor and told her that permit is ready & fees///5/5/06 @10:25am BAS
|
Permit Ready to Issue | | | 5/5/2006 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 4/13/2006 | | DONE |
|
|
|
9:35 I called and left a message for Lee H. to call me. I need information on the cantilever with no backspan and location of all beams. Plans are on hold.
|
CHANGE STATUS TO (PND) | | | 3/31/2006 | | |
|
|
|
Per Steve Munroe change status to pending & he took plans.
Builder brought in plan mod. New plan review required.
|
Telephone call | | | 1/5/2006 | | DONE |
|
|
|
left mess for derick o'neill that permits are ready
|
Permit Ready to Issue | | | 11/30/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/30/2005 | | |
|
|
|
|
Plan assigned to (SAM) | 5/2/2005 | 6/7/2005 | 6/24/2005 | | PASS |
|
|
|
6/24/2005 09:35:52 SAM - activity updated through activity BLDA022 from case BLD05-01178.
|
Routing - PLAN CHECK | 5/17/2005 | | 6/24/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/24/2005 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 6/8/2005 | | DONE |
|
|
|
08:45 I called and talked to Rob Powell. He said he will get me a new sheet A5.0. I will issue the permits once I get the new sheet.
|
Case Summary (BLD) | | | 6/8/2005 | | |
|
|
|
|
Routing - Erosion and Sediment | 5/16/2005 | | 5/17/2005 | | PASS |
|
|
|
ESC approved under "masterplan" with attached conditions.
|
Routing - PUBLIC WORKS | 5/11/2005 | | 5/12/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 5/2/2005 | | 5/9/2005 | | PEND |
|
|
|
Routed to Susan Riggs per CUP04-00032.
Ok for CUP passed onto Sara dor DR review
Approved per DRH04-00103 Mod. #1
|
Application received | | | 5/2/2005 | | |
|
|
|
|