Case Summary (BLD) | | | 1/22/2018 | | DONE |
|
|
|
|
Third Notice BLD | 12/6/2005 | 12/6/2005 | 3/15/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 9/20/2005 | 9/20/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 9/9/2005 | 9/9/2005 | 9/20/2005 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 9/8/2005 | 9/9/2005 | 9/9/2005 | P | PASS |
Dave Hannah
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Final Inspection | 9/8/2005 | 9/9/2005 | 9/9/2005 | A | PASS |
Forrest France
|
|
|
One exit sign without battery backup was repaired while on site. Fire life safety finaled.
|
DOC - Permit Finaled | 9/9/2005 | 9/9/2005 | 9/9/2005 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 8/10/2005 | 8/10/2005 | 8/11/2005 | P | PASS |
Dave Hannah
|
|
|
bob cafferty; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa int walls ok to cover
|
Issue PAID IN FULL permit | | | 5/27/2005 | | DONE |
|
|
|
|
1st review completed | | | 5/25/2005 | | FAIL |
|
|
|
failed ESC
|
Routing - PLAN CHECK | 5/25/2005 | | 5/25/2005 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/25/2005 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 5/25/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 5/25/2005 | | |
|
|
|
|
Telephone call | | | 5/25/2005 | | DONE |
|
|
|
left mess for david rudeen at ###-#### is ready
|
Plan assigned to (JCB) | 5/3/2005 | | 5/25/2005 | | PASS |
|
|
|
5/25/2005 11:01:42 JCB - activity updated through activity BLDA022 from case BLD05-01181.
|
Routing - FIRE | 5/19/2005 | | 5/25/2005 | | PASS |
|
|
|
review faxed to architect
|
Routing - Erosion and Sediment | 5/23/2005 | | 5/23/2005 | | PASS |
|
|
|
ESC plan waiver approved with attached conditions.
|
Telephone call | | | 5/19/2005 | | DONE |
|
|
|
Talked with Mike of Elkhorn Engineers and he said there is existing adequate make-up air in both the cafeteria area and in the new residential type test kitchen area where new Type II hoods are being installed. He also indicated that the existing Type I hood in the kitchen/cafeteria was intact and that only the suppression system needed upgrading.
|
Routing - PLAN CHECK | 5/17/2005 | | 5/19/2005 | | PEND |
|
|
|
Plan review e-mailed and faxed to architect. No response required. When approved by Fire Department and Erosion/Sediment Control permit can be issued. Plans to route to the Fire Dept.
|
Routing - Erosion and Sediment | 5/18/2005 | | 5/18/2005 | | FAIL |
|
|
|
Received esc plan waiver request letter and application. No rp identified and a contractor has been called out. Informed applicant that this is needed.
|
Routing - PLUMBING | 5/17/2005 | | 5/17/2005 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - Erosion and Sediment | 5/5/2005 | | 5/17/2005 | | FAIL |
|
|
|
No esc application, plan or waiver request letter. Informed applicant that a permit is needed so an application and waiver request letter will be needed.
|
Routing - PUBLIC WORKS | 5/3/2005 | | 5/5/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/3/2005 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/2/2005 | | |
|
|
|
|
Fee Review-notes | 5/2/2005 | 5/2/2005 | | | |
|
|
|
|