Permit Information
Permit NumberBLD05-01199
StatusFinaled
Name AVISION LLC
Site Address 482 N STRATA VIA WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a four bedroom, three and one quarter bathroom 2603 sq. ft. two story single family dwelling (2094 sq. ft. first floor/509 sq. ft. second floor) with a attached 1078 sq. ft. four car tandem garage, a 176 sq. ft. covered back porch and a 94 sq. ft. covered front porch. This lot is within a hillside area and is subject to the hillside ordinances. A class "A" roof system and defensible area will be maintained. Per approved plans, engineering and requirement list. CFH05-00014 per Angela Wood with Planning and Zoning. (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/10/20065/12/20065/12/2006APASS
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Titus Gilliam
DOC - Permit Finaled5/12/20065/12/20065/12/2006PPASS
DetailsDave Hannah
BLD-Final5/9/20065/10/20065/10/2006PFAIL
DetailsDave Hannah
please call titus for garage access ###-#### Internet Inspection Request from: Titus Gilliam needs hand rail on top flight of stairs
PubWorks Occupancy Approval5/10/20065/10/20065/10/2006 DONE
Final Grading Inspection of retaining wall drainage swale done by Public Works. Public Works / Final Occupancy permit issues have been resolved based upon Contractor activities.
BLD-Grading Inspection5/3/20065/3/20065/3/2006 BOND
The rough grading and drainage have been completed at the above mentioned address. However, the placement of the retaining walls was not done according to plan which will require that a drainage swale be constructed between the two walls. For this incomplete work the engineer has recommended a $500.00 bond. Upon receipt of this bond the grading and drainage is conditionally approved.
BLD-Final5/2/20065/2/20065/2/2006PCANC
DetailsDave Hannah
please call titus for access ###-####; Phone #: ###-#### Internet Inspection Request from: Titus Gilliam
BLD-Final4/28/20064/28/20064/28/2006PFAIL
DetailsJim Sly
Please call Titus at ###-#### in advance to get access to home or meet at site.; Phone #: ###-#### Internet Inspection Request from: Titus Gilliam
Need final sign off from Terry Records
BLD-Final4/27/20064/28/20064/28/2006ACANC
DetailsTony Young
titus; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Inspection cancelled from web by: Titus Gilliam
BLD-Energy code compliance9/9/20059/15/20059/15/2005APASS
DetailsDave Hannah
call dave w/ problems ###-####; Phone #: ###-#### Internet Inspection Request from: Titus Gilliam ok to cover framing
BLD-Framing/Rough-in9/12/20059/12/20059/12/2005PPASS
DetailsDave Hannah
call Joel w/ problems ###-#### Internet Inspection Request from: Titus Gilliam
BLD-Framing/Rough-in9/9/20059/12/20059/12/2005ANR
DetailsDave Hannah
call Joel w/ problems ###-#### Internet Inspection Request from: Titus Gilliam needs seal package installed
BLD-Energy code compliance9/8/20059/14/20059/9/2005ACANC
DetailsDave Hannah
also please call titus at ###-#### if you have problems; Phone #: ###-#### Internet Inspection Request from: Titus Gilliam Inspection cancelled from web by: Titus Gilliam
BLD-Framing/Rough-in9/8/20059/9/20059/9/2005PCANC
DetailsDave Hannah
also please call titus at ###-#### if you have any problems; Phone #: ###-#### Internet Inspection Request from: Titus Gilliam Inspection cancelled from web by: Titus Gilliam
BLD-Foundation7/13/20057/13/20057/13/2005PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/13/2005 at 6:53:47 AM. Contact: ###-####.
BLD-Footing7/11/20057/12/20057/12/2005PPASS
DetailsMike Jordan
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
PubWorks Subgrade Approval5/10/20055/10/20056/30/2005 PASS
Footing subgrade approved by the geotechnical engineer. 6/30/05

A letter from the applicant's geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####.
Override - Activity Holds  6/10/2005  
Issue PAID IN FULL permit  6/10/2005 DONE
Routing - PLAN CHECK5/20/2005 6/9/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/9/2005 DONE
Override - Activity Holds  6/9/2005  
Inspection Record Card- Bld  6/9/2005 DONE
Print Occupancy Form  6/9/2005 DONE
Override - Activity Holds  6/9/2005  
Permit Ready to Issue  6/9/2005  
Telephone call  6/9/2005 DONE
lft vm with avision lc ###-#### that permit and fees are ready to be picked up
Plan assigned to (SAM)6/8/2005 6/9/2005 PASS
6/9/2005 08:22:55 SAM - activity updated through activity BLDA022 from case BLD05-01199.
Plan Reviewer's activity  6/8/2005 DONE
12:05 & 14:00 I called and left a message for Titus to send me the engineering calculations so I can finish the plan review. Plans are on hold.
Case Summary (BLD)  6/8/2005  
Routing - Erosion and Sediment5/20/2005 5/20/2005 PASS
ESC plan approved with attached conditions.
Routing - FIRE5/20/2005 5/20/2005 PASS
No fire sprinklers required (Nativa Terra Block 4)
Routing - PLANNING5/10/2005 5/20/2005 PASS
Per CFH05-14 / appeal ended May 16, 2005.
Routing - PUBLIC WORKS GRADING5/5/2005 5/10/2005 PASS
Approved as category 1
Routing - PUBLIC WORKS5/10/2005 5/10/2005 PASS
Application received  5/5/2005