Fee Review-notes | 5/5/2005 | 5/5/2005 | 2/13/2007 | | DONE |
|
|
|
|
Second Notice BLD | 3/1/2006 | 3/1/2006 | 3/15/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 2/8/2006 | 2/8/2006 | 3/1/2006 | | DONE |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 2/8/2006 | 2/8/2006 | 2/8/2006 | | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 2/8/2006 | 2/8/2006 | 2/8/2006 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 12/8/2005 | 12/8/2005 | 12/8/2005 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/8/2005 at 7:55:33 AM. Contact: ###-####.fianal ok
|
FIRE-Final Inspection | 12/7/2005 | 12/8/2005 | 12/8/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety is acceptable, defficient items corrected while on site, dumpster pad to be resized to afford complete access to FDC as discussed.
|
Permanent Occupancy | | 12/8/2005 | 12/8/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 12/6/2005 | 12/7/2005 | 12/7/2005 | P | NR |
Forrest France
|
|
|
The fire alarm permit must be finaled prior to fire life safety approval, no life safety items reviewed at this time.
|
BLD-Final | 12/6/2005 | 12/7/2005 | 12/7/2005 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/6/2005 at 10:39:21 AM. Contact: ###-####.
|
Code Occupancy Approval | 12/2/2005 | 12/2/2005 | 12/2/2005 | P | PASS |
Wm. Michael Meloy
|
|
|
compliance met.
|
FIRE-Alarm Testing | 11/30/2005 | 12/1/2005 | 12/1/2005 | A | PART |
Forrest France
|
|
|
Verified sprinkler system monitoring per Sam Rogers instructions to enable store merchandising pre permit finals.
|
PubWorks Occupancy Approval | 11/29/2005 | 11/29/2005 | 11/29/2005 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 11/29/05. D.Erskine
|
BLD-Other | 11/18/2005 | 11/21/2005 | 11/21/2005 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/18/2005 at 10:59:00 AM. Contact: ###-####.
|
Plan resubmittals received | | | 11/18/2005 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 10/26/2005 | 10/27/2005 | 10/27/2005 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/26/2005 at 2:01:47 PM. Contact: ###-####. hard ceillings restarooms ok roof paripet ok
|
BLD-Framing/Rough-in | 10/21/2005 | 10/21/2005 | 10/21/2005 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/21/2005 at 7:15:15 AM. Contact: ###-####. front fram ok for cover pending bracing.
|
BLD-Footing | 10/14/2005 | 10/17/2005 | 10/17/2005 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/14/2005 at 1:28:32 PM. Contact: ###-####.back dock aera ok pending si
|
BLD-Framing/Rough-in | 10/12/2005 | 10/13/2005 | 10/13/2005 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/12/2005 at 2:41:52 PM. Contact: ###-####.header at floor sys. above stairs/pending trade sign offs.
|
BLD-Framing/Rough-in | 9/26/2005 | 9/27/2005 | 9/27/2005 | A | PASS |
Jim Storey
|
|
|
joist repair complet.
|
BLD-Framing/Rough-in | 9/23/2005 | 9/26/2005 | 9/26/2005 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/23/2005 at 2:34:49 PM. weld points north east wall recheck
|
BLD-Footing | 7/25/2005 | 7/26/2005 | 7/26/2005 | A | PASS |
Jim Storey
|
|
|
rebar//wes; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa center pad ft ok.
|
BLD-Footing | 7/19/2005 | 7/20/2005 | 7/20/2005 | A | PASS |
Jim Storey
|
|
|
re-bar//wes; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 7/13/2005 | 7/14/2005 | 7/14/2005 | A | PART |
Jim Storey
|
|
|
wes Note: rebar footing; Phone #: ###-#### Internet Inspection Request from: Cathy Chilesbar ok si
|
(F) Reprint permit | | | 6/29/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/28/2005 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 5/6/2005 | | 6/23/2005 | | PASS |
|
|
|
6/23/2005 10:42:58 JCM - activity updated through activity BLDA022 from case BLD05-01209.
|
Routing - PLAN CHECK | 6/14/2005 | | 6/23/2005 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 6/20/2005 | | 6/23/2005 | | PASS |
|
|
|
Called PDQ for pick up...
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/23/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/23/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/23/2005 | | |
|
|
|
|
Print Occupancy Form | | | 6/23/2005 | | DONE |
|
|
|
|
Telephone call | | | 6/23/2005 | | DONE |
|
|
|
left mess for craig ames at ###-#### that permit is ready
|
Plan resubmittals received | | | 6/20/2005 | | |
|
|
|
Received (3) copies of sheet S202 and (2) copies of additional structural calcs. Routed to John M.
|
Routing - FIRE | 6/9/2005 | | 6/14/2005 | | PASS |
|
|
|
resubmittal acceptable with conditions per revised review; review faxed to architect.
|
Plan resubmittals requested | | | 6/14/2005 | | DONE |
|
|
|
E-mailed the architect a copy of the comment list from the consulting structural engineer requesting additional structural revisions. JCM
|
Plan resubmittals received | | | 6/13/2005 | | DONE |
|
|
|
Received 1Transmittal Letter , 3 Memos & 3 Copys of sheets S202,S701 Taken to John M.
|
Routing Off Site - STRUCTURAL | 6/6/2005 | | 6/13/2005 | | FAIL |
|
|
|
Called PDQ for pick up -- Received e-mailed comment list from the consulting structural engineer requesting additional structural revisions. JCM
|
Routing - PLAN CHECK | 6/1/2005 | | 6/9/2005 | | PASS |
|
|
|
|
Plan resubmittals received | | | 6/9/2005 | | DONE |
|
|
|
United Water info received by fax. Put in plan roll at John M.'s desk, awaiting remainder of resubmittal information.
|
Plan Reviewer's activity | | | 6/9/2005 | | PASS |
|
|
|
Reviewed and approved resubmitted plan sheets with plan review red lined corrections. JCM
|
Plan resubmittals received | | | 6/8/2005 | | DONE |
|
|
|
Received Fax Transmittal requesting that fax sheet & United Water Flow sheet be sent to Mary F. in fire... Fax Taken to Mary F. in fire.. ///DLD
|
Plan resubmittals received | | | 6/7/2005 | | DONE |
|
|
|
Received 2 Mechanical Calcs, 2- 8 1/2 x 11 site plans, 2 Techanical information sheets,2 Response sheets for JohnM. , 1 Response sheet for Mary F. & 2 Copys of sheets A2.1,A2.2,A2.4 Taken to John M.
|
Plan resubmittals received | | | 6/6/2005 | | DONE |
|
|
|
Received 3 Memos, 2 letters, & 3 Copys of sheets S202,S701 Taken to John M.
|
1st review completed | | | 6/1/2005 | | FAIL |
|
|
|
Failed structural, plan check and fire.
|
Routing - FIRE | 5/31/2005 | | 6/1/2005 | | FAIL |
|
|
|
faxed the architect a copy of the plan review comment list requesting revisions. MJF
|
Routing - PLAN CHECK | 5/13/2005 | | 5/31/2005 | | FAIL |
|
|
|
John M.
|
Plan resubmittals requested | | | 5/26/2005 | | |
|
|
|
e-mailed the architect a copy of the plan review comment list requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 5/6/2005 | | 5/19/2005 | | FAIL |
|
|
|
Called PDQ for pick up. - Received e-mailed comment list from the consulting structural engineer requesting revisions. JCM
|
Plan resubmittals requested | | | 5/19/2005 | | DONE |
|
|
|
E-mailed the architect a copy of the plan review comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PLANNING | 5/11/2005 | | 5/13/2005 | | PASS |
|
|
|
Approved per DRH05-00032 and as noted on sheet C1.3.
|
Routing - PLUMBING | 5/10/2005 | | 5/11/2005 | | PASS |
|
|
|
dcva on water service required
|
Routing - Erosion and Sediment | 5/10/2005 | | 5/10/2005 | | PASS |
|
|
|
ESC approved with attached conditions.
|
Routing - PUBLIC WORKS | 5/6/2005 | | 5/10/2005 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 5/6/2005 | | 5/6/2005 | | PASS |
|
|
|
Approved by Record of Survey.
|
Plans ACCEPTED BY PLAN TECH | | | 5/6/2005 | | |
|
|
|
Brian M. has master plan for grading & drainage on file.
|
Plan routing begun/NEW & ADDTN | | | 5/6/2005 | | |
|
|
|
|
Application received | | | 5/5/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/5/2005 | | DONE |
|
|
|
|
Third Notice BLD | 3/15/2006 | 3/15/2006 | | | |
|
|
|
Second Notice has not been responded to.
|