Third Notice BLD | 12/7/2005 | 12/7/2005 | 3/15/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice | | 9/15/2005 | 12/7/2005 | | DONE |
|
|
|
|
First Notice | | 8/17/2005 | 9/14/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 8/16/2005 | 8/17/2005 | 8/17/2005 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
Permanent occupancy UNPAID FEE | | | 8/17/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10694 issued 8-17-05 to Binyon's in the Boise Towne Square.
|
BLD-Final | 8/15/2005 | 8/16/2005 | 8/16/2005 | A | PART |
Tom Arcoraci
|
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for perm pending fire sign off
|
Permanent Occupancy | | 8/16/2005 | 8/16/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 8/10/2005 | 8/11/2005 | 8/11/2005 | A | PART |
Troy Cobbley
|
|
|
robert; Phone #: ###-#### Inspection was for the smoke evac system. It operated correctly from the two spot type smoke detectors located at the two front exit/entrance. I also inspected the exit signs and emergency lights. They passed as well. I notified the general contractor that the door to the lab with the keyed deadbolt is not approved type of hardware.
|
BLD-Framing/Rough-in | 8/8/2005 | 8/8/2005 | 8/9/2005 | P | PASS |
Jim Storey
|
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa need to verify at final fire stopping .
|
BLD-Framing/Rough-in | 7/11/2005 | 7/11/2005 | 7/11/2005 | P | PART |
Jim Sly
|
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 80% framed and OK to cover. Advised Contractor to call for insp so we can verify that all holes and penitrations through tenant demising walls are fixed (patched)..... B 4 celing tile install.
|
Issue PAID IN FULL permit | | | 6/27/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/27/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/21/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/21/2005 | | DONE |
|
|
|
|
Telephone call | | | 6/21/2005 | | DONE |
|
|
|
lft ms with manuel espinoza ###-#### that permit and fees are ready to be picked up
|
Routing - FIRE | 6/14/2005 | | 6/20/2005 | | PASS |
|
|
|
passed with conditions; review faxed to architect.
|
1st review completed | | | 6/20/2005 | | FAIL |
|
|
|
failed Plan Tech.
|
Routing - PLAN CHECK | 6/20/2005 | | 6/20/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2005 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 6/3/2005 | | 6/20/2005 | | PASS |
|
|
|
6/20/2005 11:12:03 RMH - activity updated through activity BLDA022 from case BLD05-01220.
|
Routing - PLAN CHECK | 6/6/2005 | | 6/14/2005 | | PEND |
|
|
|
No corrections required by building department review. Permit pending fire departments review, routed to fire on 6/14/04
|
Case Summary (BLD) | | | 6/14/2005 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 6/3/2005 | | 6/6/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/2/2005 | | PASS |
|
|
|
Plans revisions received and routing can begin.
|
Meeting | | | 5/12/2005 | | DONE |
|
|
|
Ron met with John Kirby (contractor) on this date. The contractor noted that plans did not reflect actual work to be done and would require revisions from architect. Ron advised him to contact architect directly to have plans corrected and resubmitted. Ron to prepare interior demo permit.
|
Plans ACCEPTED BY PLAN TECH | | | 5/6/2005 | | FAIL |
|
|
|
Plans cannot be routed until revisions made to reflect energy compliance (lighting & mechanical), and sheet MEP1.01 is changed to reflect the correct design codes. Plans on hold at plan review front desk.
|
Application received | | | 5/6/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/6/2005 | | |
|
|
|
|
Fee Review-notes | 5/6/2005 | 5/6/2005 | | | |
|
|
|
|