Second Notice | | 12/4/2009 | 12/29/2009 | | DONE |
|
|
|
|
First Notice | 11/12/2009 | 11/12/2009 | 11/25/2009 | | DONE |
Jim Sly
|
|
|
|
BLD-Conference | 11/10/2009 | 11/12/2009 | 11/12/2009 | A | PASS |
Jim Sly
|
|
|
Ron ###-####
|
DOC - Permit Finaled | 11/12/2009 | 11/12/2009 | 11/12/2009 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 11/10/2009 | 11/10/2009 | 11/10/2009 | P | CANC |
Jim Sly
|
|
|
Ron Phone #: ###-####
|
BLD-Aging Inspection | 7/27/2009 | 7/27/2009 | 7/27/2009 | | NR |
Tom Arcoraci
|
|
|
|
Case Summary (BLD) | | | 2/15/2008 | | DONE |
|
|
|
|
BLD-Final | 2/13/2008 | 2/14/2008 | 2/14/2008 | A | NR |
Jim Sly
|
|
|
Call alan at ###-#### Need P/W, Zoning, then Bldg final.
|
BLD-Aging Inspection | 2/8/2008 | 2/8/2008 | 2/13/2008 | | CANC |
Jim Sly
|
|
|
Scheduled for 2/14/08
|
(F) Reprint permit | | | 3/8/2007 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/5/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/26/2007 | 1/26/2007 | 1/26/2007 | P | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
Inspection Record Card- Bld | | | 7/17/2006 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 4/20/2006 | 4/20/2006 | 4/20/2006 | P | PART |
Jim Sly
|
|
|
vern; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles All OK exept Need to make sure that lateral bracing installed on bottom chord at 5'6" Min. (All trusses)
|
BLD-Conference | 3/27/2006 | 3/27/2006 | 3/27/2006 | A | DONE |
Mike Jordan
|
|
|
Due to phone call from a concerned citizen, on site to view damage of steel stud wall and roofing due to severe storms. majority of steel stud wall has been removed. Contractor has scheduled his structural engineer for site observation.
|
BLD-Footing | 7/18/2005 | 7/18/2005 | 7/18/2005 | P | PASS |
Mike Jordan
|
|
|
donny; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Also noted special inspector on site.
|
(F) Reprint permit | | | 7/6/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/5/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/28/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/28/2005 | | DONE |
|
|
|
|
Telephone call | | | 6/28/2005 | | DONE |
|
|
|
called told elizabeth permit is ready and fees
|
Routing - FIRE | 6/20/2005 | | 6/27/2005 | | PASS |
|
|
|
passed per revised plans showing building is to be sprinklered. Revised comments faxed to architect.
|
Routing - PLAN CHECK | 6/27/2005 | | 6/27/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2005 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 5/13/2005 | | 6/27/2005 | | PASS |
|
|
|
6/27/2005 15:55:44 JCM - activity updated through activity BLDA022 from case BLD05-01261.
|
Routing - PLAN CHECK | 6/15/2005 | | 6/20/2005 | | |
|
|
|
|
Plan resubmittals received | | | 6/20/2005 | | DONE |
|
|
|
Received 1 Faxed Review Response for John M. & Sam R. Taken to John M.
|
Plan Reviewer's activity | | | 6/20/2005 | | DONE |
|
|
|
Revised permit to indicate that this building will be fully fire sprinklered. This was done after receiving a fax from the project architect indicating that all building would be fully fire sprinklered.
|
Routing - PLANNING | 6/14/2005 | | 6/15/2005 | | PASS |
|
|
|
Approved per DRH04-230 and as noted.
|
Routing - PLAN CHECK | 6/9/2005 | | 6/14/2005 | | PASS |
|
|
|
Reviewed and approved final resubmittals including final structural resubmittals. JCM
|
Plan resubmittals received | | | 6/13/2005 | | DONE |
|
|
|
Received Transmittal ,1 Review sheet, & 2 Copys of sheets S4.0,L1.0,A1.0 Taken to John M.
|
Routing - PLAN CHECK | 6/7/2005 | | 6/9/2005 | | |
|
|
|
|
Routing - PUBLIC WORKS | 6/9/2005 | | 6/9/2005 | | |
|
|
|
Plans routed to P.W. for additional addressing.
|
Plan resubmittals requested | | | 6/8/2005 | | DONE |
|
|
|
Faxed the architect a copy of the structural engineers second comment list. JCM
|
Routing - FIRE | 5/31/2005 | | 6/7/2005 | | FAIL |
|
|
|
review faxed to architect.
|
Routing Off Site - STRUCTURAL | 6/3/2005 | | 6/7/2005 | | FAIL |
|
|
|
Called PDQ for pick up. - Received a faxed comment list from the consulting structural engineer, for the second review, requesting additional revisions. JCM
|
1st review completed | | | 6/7/2005 | | FAIL |
|
|
|
failed planning, ESC, structural, plan check and fire.
|
Plan resubmittals received | | | 6/3/2005 | | |
|
|
|
Received (3) copies of sheet A0.2, A2.1, A2.0, S2.0, S4.0 and S5.0. Also received (3) copies of structural calculations. Routed to John M.
|
Routing - PLAN CHECK | 5/26/2005 | | 5/31/2005 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 5/31/2005 | | DONE |
|
|
|
Mailed the architect a copy of the plan review comment list requesting revisions. JCM
|
Routing - Erosion and Sediment | 5/26/2005 | | 5/26/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLAN CHECK | 5/25/2005 | | 5/26/2005 | | |
|
|
|
|
Routing - PLANNING | 5/18/2005 | | 5/24/2005 | | FAIL |
|
|
|
Landscape plan and site plan not coordinated. Plant material shown along east wall of proposed building on site plan not indicated-noted on landscape plan; this would relate to the Design Review condition requiring base planting along the building perimeter.
50% of trees along the west yard have not been changed to an evergreen variety.
Street trees need to be indicated in the parkway along Wildwood.
Cistena Plums located at curbcut are in conflict with clear vision triangle; a variety of shrubs needs to be provided at the curbcut area.
Cistena Plums not changed per Design Review conditions.
Bike parking not indicated.
Trash enclosure materials do not match proposed building.
Specs. for exterior materials not indicated.
|
Routing Off Site - STRUCTURAL | 5/16/2005 | | 5/24/2005 | | FAIL |
|
|
|
Called PDQ for pick up - Received a faxed comment list from the consulting structural engineer requesting revisions. JCM
|
Plan resubmittals requested | | | 5/24/2005 | | |
|
|
|
FAxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PUBLIC WORKS | 5/13/2005 | | 5/18/2005 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 5/18/2005 | | 5/18/2005 | | FAIL |
|
|
|
ESC narrative submitted for the subdivison esc not buildings. Informed applicant and pd.
|
Routing - PLANNING Land Div | 5/13/2005 | | 5/13/2005 | | PASS |
|
|
|
Approved. Site is over 5 acres in size. Unit location to match Steelwood Condominium Plat.
|
Plans ACCEPTED BY PLAN TECH | | | 5/13/2005 | | DONE |
|
|
|
Plans could not begin routing until all civil sheets were resubmitted and changes made on plans by architect. As of this date plans have include all reflected changes and can begin routing.
|
Plan resubmittals received | | | 5/11/2005 | | DONE |
|
|
|
Received all new civil sheets to insert in plans.
|
Application received | | | 5/11/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/11/2005 | | DONE |
|
|
|
|
Fee Review-notes | 5/11/2005 | 5/11/2005 | | | |
|
|
|
|