Third Notice BLD | 1/8/2007 | 1/8/2007 | 5/4/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Fee Review-notes | 5/11/2005 | 5/11/2005 | 5/4/2007 | | DONE |
|
|
|
|
Telephone call | | | 4/17/2007 | | DONE |
|
|
|
spoke w/ celinda, with winters elec. she will check fv and call back
|
(F) Reprint permit | | | 3/8/2007 | | |
|
|
|
|
Second Notice BLD | 9/25/2006 | 9/25/2006 | 1/8/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 7/27/2006 | 7/27/2006 | 9/25/2006 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 7/26/2006 | 7/27/2006 | 7/27/2006 | P | PASS |
Jim Sly
|
|
|
vern ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley C/C issued
|
DOC - Permit Finaled | 7/27/2006 | 7/27/2006 | 7/27/2006 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 7/26/2006 | 7/27/2006 | 7/27/2006 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the south tenant is complete
|
BLD-Final | 7/25/2006 | 7/25/2006 | 7/25/2006 | P | CANC |
Jim Sly
|
|
|
vern; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Final | 7/24/2006 | 7/25/2006 | 7/25/2006 | A | CANC |
Jim Sly
|
|
|
Vern : ); Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
FIRE-Final Inspection | 7/24/2006 | 7/25/2006 | 7/25/2006 | A | FAIL |
Troy Cobbley
|
|
|
Fire alarm inspection failed
|
FIRE-Final Inspection | 7/21/2006 | 7/21/2006 | 7/21/2006 | P | FAIL |
Troy Cobbley
|
|
|
Still need the fire alarm permit finaled. Life safety for the shell and Sign Company tenant is ok for a temporary occupancy once the fire alarm is a go. The south tenant work is ongoing at this time.
|
BLD-Final | 7/21/2006 | 7/21/2006 | 7/21/2006 | P | CANC |
Jim Sly
|
|
|
vern; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
FIRE-Final Inspection | 7/19/2006 | 7/20/2006 | 7/20/2006 | A | FAIL |
Troy Cobbley
|
|
|
The fire alarm and fire spirnkler permits need t be finaled, exit signs and emergency lights need repaored and approved hardware installed on the second floor restroom doors.
|
Inspection Record Card- Bld | | | 7/17/2006 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 7/14/2006 | 7/14/2006 | 7/14/2006 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 11/2/2005 | 11/3/2005 | 11/3/2005 | A | PART |
Mike Jordan
|
|
|
late am please//vern nielson; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Needs to L brace gable ends.
|
BLD-Foundation | 7/19/2005 | 7/19/2005 | 7/19/2005 | P | NR |
Mike Jordan
|
|
|
donny; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Work was complete but no approved plans on site. Placement is for tomorrow at 7:00 am. Work is being inspected by special inspector.
|
BLD-Foundation | 7/14/2005 | 7/14/2005 | 7/14/2005 | P | PEND |
Jim Sly
|
|
|
donny; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 7/12/2005 | 7/13/2005 | 7/13/2005 | A | PART |
Mike Jordan
|
|
|
late as possible///donny; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
(F) Reprint permit | | | 7/6/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/5/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/28/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/28/2005 | | DONE |
|
|
|
|
Telephone call | | | 6/28/2005 | | DONE |
|
|
|
called told elizabeth permit is ready and fees
|
Routing - PLAN CHECK | 6/27/2005 | | 6/27/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2005 | | DONE |
|
|
|
|
Routing - FIRE | 6/20/2005 | | 6/27/2005 | | PASS |
|
|
|
approved based on revised plans showing building to be sprinklered. Revised review faxed to architect.
|
Plan assigned to (JCM) | 5/13/2005 | | 6/27/2005 | | PASS |
|
|
|
6/27/2005 15:56:23 JCM - activity updated through activity BLDA022 from case BLD05-01262.
|
Routing - PLAN CHECK | 6/15/2005 | | 6/20/2005 | | |
|
|
|
|
Plan Reviewer's activity | | | 6/20/2005 | | DONE |
|
|
|
Revised permit to indicate that this building will be fully fire sprinklered. This was done after receiving a fax from the project architect indicating that all building would be fully fire sprinklered.
|
Routing - PLANNING | 6/14/2005 | | 6/15/2005 | | PASS |
|
|
|
Approved per DRH04-230 and as noted.
|
Routing - PLAN CHECK | 6/9/2005 | | 6/14/2005 | | PASS |
|
|
|
Plans resubmittals approved including final structural resubmittal. JCM
|
Plan resubmittals received | | | 6/13/2005 | | DONE |
|
|
|
Received Transmittal ,1 Review sheet, & 2 Copys of sheets S4.0,L1.0,A1.0 Taken to John M.
|
Routing - PLAN CHECK | 6/7/2005 | | 6/9/2005 | | |
|
|
|
|
Routing - PUBLIC WORKS | 6/9/2005 | | 6/9/2005 | | |
|
|
|
Plans routed back to P.W. for additional addressing.
|
Plan resubmittals requested | | | 6/8/2005 | | DONE |
|
|
|
Faxed the architect a copy of the structural engineers second comment list. JCM
|
Routing Off Site - STRUCTURAL | 6/3/2005 | | 6/7/2005 | | FAIL |
|
|
|
|
Routing - FIRE | 5/31/2005 | | 6/7/2005 | | FAIL |
|
|
|
review faxed to architect
|
1st review completed | | | 6/7/2005 | | FAIL |
|
|
|
failed planning, structural, ESC, plan check and fire.
|
Plan resubmittals received | | | 6/3/2005 | | |
|
|
|
Received (3) copies of sheet A0.2, A2.1, A2.0, S2.0, S4.0 and S5.0. Also received (3) copies of structural calculations. Routed to John M.
|
Routing - PLAN CHECK | 5/26/2005 | | 5/31/2005 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 5/31/2005 | | DONE |
|
|
|
Mailed the architect a copy of the comment list requesting revisions. JCM
|
Routing - Erosion and Sediment | 5/26/2005 | | 5/26/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLAN CHECK | 5/25/2005 | | 5/26/2005 | | |
|
|
|
|
Routing - PLANNING | 5/18/2005 | | 5/24/2005 | | FAIL |
|
|
|
Base planting along the building perimeter not indicated.
Street trees need to be indicated in the parkway along Wildwood.
Cistena Plum located at curbcut are in conflict with clear vision triangle; a variety of shrubs needs to be provided at the curbcut area.
Cistena Plum not changed per Design Review conditions.
Bike parking not indicated.
Trash enclosure materials do not match proposed building.
Specs. for exterior materials not indicated.
|
Routing Off Site - STRUCTURAL | 5/16/2005 | | 5/24/2005 | | FAIL |
|
|
|
Called PDQ for pick up
|
Routing - PUBLIC WORKS | 5/13/2005 | | 5/18/2005 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 5/18/2005 | | 5/18/2005 | | FAIL |
|
|
|
ESC plan and narrative submitted is addressing the overall sub not the structures, informed applicant and PD.
|
Plan resubmittals received | | | 5/17/2005 | | DONE |
|
|
|
Received 2 Erosion & Sediment Control Narratives & 1 Application Taken to John M.
|
Plans ACCEPTED BY PLAN TECH | | | 5/13/2005 | | DONE |
|
|
|
Plans could not begin routing until all civil sheets were resubmitted and changes made on plans by architect. As of this date plans have include all reflected changes and can begin routing.
|
Routing - PLANNING Land Div | 5/13/2005 | | 5/13/2005 | | PASS |
|
|
|
Approved, site is over 5 acres in size.
|
Plan resubmittals received | | | 5/11/2005 | | DONE |
|
|
|
Received all new sets of civil plans to be inserted in plans.
|
Application received | | | 5/11/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/11/2005 | | DONE |
|
|
|
|