Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD05-01279
StatusFinaled
Name ATWATER CONSTRUCTION
Site Address 1212 W BANNOCK ST
Project NameGREYHOUND
Customer Number 
ePlanReviewNo
Description
*(Greyhound Bus Terminal)* To remodel the ticket counter area at the bus terminal. Work to include, removal of existing counter & installation of new accessible ticket counter, remove and replace suspended ceiling, remove and replace selective doors, remove and replace drinking fountain with new accessible Hi-Low drinking fountain all per approved plans. RmH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  12/19/2005 DONE
Letter of Compliance issued 12-19-05.
BLD-Final12/13/200512/15/200512/15/2005APASS
DetailsTony Young
aaron-- call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
ok for cof c-o
FIRE-Final Inspection12/13/200512/14/200512/14/2005APASS
DetailsForrest France
c/n items have been completed as requested, inspection passed.
FIRE-Conference11/1/200511/2/200511/2/2005ADONE
DetailsForrest France
On site discussion with the general contractor regarding door hardware requirements for exiting the express room, driver and dispatcher rooms.
BLD-Final10/31/200511/1/200511/1/2005AFAIL
DetailsMike Jordan
aaron; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Has not rescheduled life/safety inspection. Contractor was contacted, none of the door hardware or signage has been fixed. Contractor to conact fire insp.
FIRE-Final Inspection10/19/200510/20/200510/20/2005PFAIL
DetailsForrest France
Provide approved door hardware at driver and dispatcher room doors--must be opened in a single motion without the use of a key or special knowledge or effort, provide signage at express room door if keyed locking hardware is to remain or remove deadbolt, see plan review note #1 for door hardware requirements.
BLD-Final10/18/200510/19/200510/19/2005PFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/18/2005 at 3:28:25 PM. Contact: ###-####.
Need Fire final and Plumb final (installed drinking fountain)
BLD-Framing/Rough-in7/5/20057/5/20057/5/2005PPART
DetailsTony Young
ceiling grid///aaron; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
ok pending electrical rough
1st review completed  5/17/2005 PASS
Issue PAID IN FULL permit  5/17/2005  
Plan assigned to (R_H)5/13/20055/13/20055/16/2005 PASS
5/16/2005 08:04:33 RMH - activity updated through activity BLDA022 from case BLD05-01279.
Case Summary (BLD)  5/16/2005 DONE
Routing - PLAN CHECK5/16/2005 5/16/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  5/16/2005 DONE
Inspection Record Card- Bld  5/16/2005 DONE
Permit Ready to Issue  5/16/2005 DONE
Telephone call  5/16/2005  
tlk to pat mckeegan - ###-#### that permit
Plans ACCEPTED BY PLAN TECH  5/13/2005  
Application received  5/13/2005  
Recd Pcfee & Taken To Pln CK  5/13/2005 DONE
Fee Review-notes5/13/20055/13/2005