DOC - Permit Finaled | | | 3/10/2017 | | DONE |
Rita DeYoung
|
|
|
|
Print Occupancy Form | | | 3/10/2017 | | DONE |
|
|
|
|
Permanent Occupancy | | | 3/10/2017 | | DONE |
|
|
|
|
Telephone call | | | 3/10/2017 | | DONE |
|
|
|
emailed C of O To parcel owner
|
BLD-Final | 3/3/2017 | 3/3/2017 | 3/3/2017 | P | PASS |
Mike Jordan
|
|
|
Ok for perm occ.
|
FIRE-Final Inspection | 3/18/2016 | 3/18/2016 | 3/18/2016 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Conference | 10/22/2015 | 10/28/2015 | 10/28/2015 | A | DONE |
Troy Cobbley
|
|
|
I received a phone call from Brian with Local Alarm inquiring about what is needed. I set up another conference for next week to follow up.
|
FIRE-Conference | 10/21/2015 | 10/22/2015 | 10/22/2015 | A | DONE |
Troy Cobbley
|
|
|
I spoke to Jayne and left another correction notice. I was later contacted by Brian with Local Fire about details. A follow up inspection has been scheduled.
|
BLD-Aging Inspection | 10/21/2015 | 10/21/2015 | 10/21/2015 | | PEND |
Mike Jordan
|
|
|
Spoke to troy about the fire alarm issue needing to be extended into the new portion of building. Tenant has made no effort in correcting this item since 2005. Troy noted that he would talk to scott Arellano about the issue and possibily scheduling a building conferance.
|
BLD-Aging Inspection | 12/29/2014 | 12/29/2014 | 12/30/2014 | | PEND |
Mike Jordan
|
|
|
Pending fire.
|
BLD-Aging Inspection | 8/13/2014 | 8/13/2014 | 8/14/2014 | | PEND |
Mike Jordan
|
|
|
Still pending fire.
|
BLD-Aging Inspection | 4/16/2014 | 4/16/2014 | 4/16/2014 | | PEND |
Mike Jordan
|
|
|
Pending fire.
|
FIRE-Final Inspection | 12/27/2012 | 12/28/2012 | 12/28/2012 | P | FAIL |
Troy Cobbley
|
|
|
The existing fire alarm system needs to be extended into the new area as per review comment #17.
|
FIRE-Final Inspection | 12/27/2012 | 12/27/2012 | 12/27/2012 | P | FAIL |
Troy Cobbley
|
|
|
No approved plans on site. I helped Jayne with the process of getting replacement plans.
|
Fees Due Hold | 12/13/2012 | | 12/20/2012 | | DONE |
Christina Prado
|
|
|
|
Reopen Permit (ISS) | | | 12/20/2012 | | DONE |
Christina Prado
|
|
|
|
(F) Reprint permit | | | 12/20/2012 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 12/12/2012 | | DONE |
Christina Prado
|
|
|
Per Bob A & Doug P - ok to pay 1hr admin fee to reopen permit for final inspection. New ELE permit is required to be pulled with new contractor and finaled prior to BLD final. ELE permit fee is to be $46.31
|
BLD-Aging Inspection | 1/25/2012 | 1/25/2012 | 1/25/2012 | | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Expired | 1/25/2012 | 1/25/2012 | 1/25/2012 | A | PASS |
Mike Jordan
|
|
|
No effort has been made on tenants part to schedule any required inspections within the 180 days of permit being reopened.
|
BLD-Final | 5/23/2011 | 5/26/2011 | 5/26/2011 | P | CANC |
Mike Jordan
|
|
|
Jane Phone #: ###-####--Canceled by Jane on 5-26-11 @ 11:36am
|
Reopen Permit (ISS) | | | 5/23/2011 | | DONE |
Barbara Stitt
|
|
|
Re-open for final per Bob Archibald 5-23-11
|
Conference | 5/20/2011 | 5/20/2011 | 5/20/2011 | | PEND |
Bob Archibald
|
|
|
Ok to reactivate permit for final inspection pending receipt of 1 hour admin fee. Bob A.
|
Case Summary (BLD) | | | 5/19/2011 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/19/2011 | | DONE |
|
|
|
|
BLD-Aging Inspection | 6/23/2010 | 6/23/2010 | 6/29/2010 | | CANC |
Mike Jordan
|
|
|
|
DOC - Permit Expired | 6/29/2010 | 6/29/2010 | 6/29/2010 | P | PASS |
Mike Jordan
|
|
|
Permit is expired. No action from contractor to reslove permit.
|
(F) Reprint permit | | | 7/8/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
PRINT Activities | | | 7/8/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
BLD-Aging Inspection | 8/11/2006 | 8/11/2006 | 8/11/2006 | | NR |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 4/4/2006 | 4/4/2006 | 4/4/2006 | P | FAIL |
Troy Cobbley
|
|
|
No approved plans on site for inspection
|
BLD-Final | 3/30/2006 | 3/31/2006 | 3/31/2006 | A | NR |
Mike Jordan
|
|
|
Clint; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Still needs elec. final and needs to pull mech. permit. No ceiling grid insp. done yet.
|
BLD-Framing/Rough-in | 12/9/2005 | 12/9/2005 | 12/9/2005 | P | PART |
Mike Jordan
|
|
|
clint ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Wall bracing added as per plan. All screws were removed from suspended ceiling.
|
BLD-Framing/Rough-in | 12/7/2005 | 12/8/2005 | 12/8/2005 | A | FAIL |
Mike Jordan
|
|
|
clint -- call 1st for access for insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. needs ti install wall bracing as per lan and remove all screws connecting wall to suspended ceiling system.
|
Issue PAID IN FULL permit | | | 11/14/2005 | | DONE |
|
|
|
|
Telephone call | | | 10/10/2005 | | DONE |
|
|
|
talked to matt rhees at ###-#### that permit is ready & will expire on 11/13/05/mls
|
Telephone call | | | 6/30/2005 | | DONE |
|
|
|
left mess to matt rhees at ###-#### is ready
|
Permit Ready to Issue | | | 6/3/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/3/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/3/2005 | | DONE |
|
|
|
|
Telephone call | | | 6/3/2005 | | DONE |
|
|
|
talked to matt rhees at ###-#### is ready
|
Routing - PLAN CHECK | 5/26/2005 | | 6/2/2005 | | PASS |
|
|
|
Approved after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/2/2005 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 5/18/2005 | | 6/2/2005 | | PASS |
|
|
|
6/2/2005 13:05:15 CJW - activity updated through activity BLDA022 from case BLD05-01282.
|
Plan resubmittals received | | | 5/27/2005 | | |
|
|
|
Received (2) copies of sheet A1.0, A2.0 and A3.0. Routed to Carl W.
|
Routing - FIRE | 5/24/2005 | | 5/26/2005 | | PASS |
|
|
|
review faxed to architect.
|
1st review completed | | | 5/26/2005 | | FAIL |
|
|
|
failed plan check.
|
Routing - PLAN CHECK | 5/20/2005 | | 5/24/2005 | | FAIL |
|
|
|
The IBC plan review was started on May 20, 2005 and was finished on May 24, 2005. Revised drawings were required. See the plan review report.
|
Routing - PUBLIC WORKS | 5/18/2005 | | 5/20/2005 | | PASS |
|
|
|
|
Routing - PLUMBING | 5/20/2005 | | 5/20/2005 | | PASS |
|
|
|
increase water sizing to min. per upc 610. per plans and 2003 upc.
|
Recd Pcfee & Taken To Pln CK | | | 5/17/2005 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/17/2005 | | |
|
|
|
|
Application received | | | 5/13/2005 | | |
|
|
|
|
First Notice | | 3/20/2017 | | | |
|
|
|
|
FIRE-Conference | 10/28/2015 | 11/4/2015 | | A | |
Troy Cobbley
|
|
|
follow up
|
Fee Review-notes | 5/17/2005 | 5/17/2005 | | | |
|
|
|
|