Case Summary (BLD) | | | 10/23/2012 | | DONE |
|
|
|
|
Fee Review-notes | 5/16/2005 | 5/16/2005 | 5/4/2007 | | DONE |
|
|
|
|
Third Notice BLD | 4/2/2007 | 4/2/2007 | 4/9/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Telephone call | | | 4/9/2007 | | DONE |
|
|
|
spoke w/ Ed Gilmore, he will send copies of paid invoices to the subs on this job next week as soon as their books close and the checks have been cut.
|
Second Notice BLD | 3/21/2007 | 3/21/2007 | 4/2/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 2/28/2007 | 3/21/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/28/2007 | | DONE |
|
|
|
|
Permanent occupancy | | | 2/28/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11454 issued 2-28-07 to the Idaho Education Association.
|
BLD-Final | 2/26/2007 | 2/27/2007 | 2/27/2007 | P | PASS |
Dave Hannah
|
|
|
JERRY ; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok for perm occ
|
Permanent Occupancy | | 2/27/2007 | 2/27/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 2/22/2007 | 2/23/2007 | 2/23/2007 | A | PASS |
Forrest France
|
|
|
Corrections noted at previous inspections have been completed, fire life safety is acceptable. Noted permanent signage at the doors to the FACP and fire riser rooms to be posted prior to structural final as agreed.
|
FIRE-Final Inspection | 2/5/2007 | 2/6/2007 | 2/6/2007 | A | FAIL |
Troy Cobbley
|
|
|
It does not appear that any notes were read as requested on the previous inspection. Exit signs are missing at the main exits. Existing exit lights are inoperative. Closures have not been installed. Occupant load sign has not been provided. Knox box is not provided and so on.
|
BLD-Final | 2/5/2007 | 2/5/2007 | 2/5/2007 | P | NR |
Dave Hannah
|
|
|
john - call 30 min piror to inspection; Phone #: ###-#### Internet Inspection Request from: Victoria Beall needs fire spk final
|
FIRE-Final Inspection | 10/31/2006 | 11/1/2006 | 11/1/2006 | P | FAIL |
Forrest France
|
|
|
Need fire sprinkler and alarm finals prior to BLD life safety final, also noted extinguishers are overdue certification, missing max occupant load sign for the assembly area, missing door closure at mech. room, some items related to fire code review notes are not addressed, instructed contractor to review notes before next inspection.
|
BLD-Conference | 6/28/2006 | 6/30/2006 | 6/30/2006 | A | PASS |
Dave Hannah
|
|
|
pat ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley work in progress
|
Plan resubmittals received | | | 9/14/2005 | | DONE |
|
|
|
Fax addendum received concerning some changes at the assembly room/rooms. Appropriate occupant loads to be posted for each applicable configuration over 50 persons. One operable partition will be removed. Other proposed walls/doors will be removed. An additional double sided exit sign will be provided. A copy of addendum will be provided to the Inspector in the field and a copy will be provided to the Records Department.
|
BLD-Framing/Rough-in | 9/6/2005 | 9/7/2005 | 9/7/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/6/2005 at 10:43:27 AM. Contact: ###-####. second floor office area and rest rooms ok to cover
|
Issue PAID IN FULL permit | | | 8/17/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/15/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/15/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/15/2005 | | DONE |
|
|
|
|
Telephone call | | | 7/15/2005 | | DONE |
|
|
|
called left message on voicemail for Bruce Poe permit is ready and fees
|
Routing - PLAN CHECK | 6/17/2005 | | 7/14/2005 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
Telephone call | | | 7/14/2005 | | DONE |
|
|
|
Called and left message with Eric Peterson that the submitted architectural sheets are not signed. Need to have sheets signed.
|
Plan resubmittals received | | | 7/14/2005 | | DONE |
|
|
|
Signed plan resubmittal sheets A0.0, A2.0, A3.0, and A5.0 received.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/14/2005 | | PASS |
|
|
|
|
Plan assigned to (JCB) | 5/23/2005 | | 7/14/2005 | | PASS |
|
|
|
7/14/2005 17:20:00 JCB - activity updated through activity BLDA022 from case BLD05-01295.
|
Plan resubmittals received | | | 7/11/2005 | | |
|
|
|
Received (2) copies of sheet A0.0, A2.0, A3.0, A5.0, M2.0 and E1.1. Routed to Jason B.
|
Routing - FIRE | 6/13/2005 | | 6/17/2005 | | PASS |
|
|
|
Approved with conditions; review faxed to architect.
|
1st review completed | | | 6/17/2005 | | FAIL |
|
|
|
failed plan check
|
Routing - PLAN CHECK | 5/24/2005 | | 6/13/2005 | | FAIL |
|
|
|
Plan review e-mailed and faxed to architect. Plan resubmittals and written response required for further review. Plans to route to Fire Dept. for review.
|
Routing - PUBLIC WORKS | 5/23/2005 | | 5/24/2005 | | PASS |
|
|
|
|
Routing - PLUMBING | 5/24/2005 | | 5/24/2005 | | PASS |
|
|
|
per plans and 2003 upc
|
Application received | | | 5/16/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/16/2005 | | |
|
|
|
|