Permit NumberBLD05-01302
StatusFinaled
Name MARK L HIXSON
Site Address 11443 W MCMILLAN RD
Project NameLDS CHURCH PICNIC SHELTER
Customer Number 
ePlanReviewNo
Description
LDS Church Picnic Shelter - to construct a new 1,800 sq. ft., wood framed, open roof, covered picnic shelter over a new concrete slab. All new construction per approved plan. CZC05-00077/JSM.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/10/200511/14/200511/14/2005PPASS
DetailsJim Sly
ron//please call when done with inspection; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
C/C issued.
FIRE-Final Inspection11/10/200511/14/200511/14/2005APASS
DetailsTroy Cobbley
Life safety finaled
Code Occupancy Approval  11/7/2005 PASS
Meets compliance with CZC05-00077. Also talked to Mark Hixson about removing the small pile of dirt (now mud) and chunck of concrete at the west side of the trash enclosure. He will get this done.
BLD-Final11/3/200511/3/200511/3/2005PNR
DetailsJim Sly
ron; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
NR Need fire and zoning to final. Leave C/C at jobsite
BLD-Framing/Rough-in10/5/200510/6/200510/6/2005PPASS
DetailsJim Sly
randy greer; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Footing9/23/20059/23/20059/23/2005PPASS
DetailsJim Sly
rick; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
Issue PAID IN FULL permit  8/15/2005 DONE
Inspection Record Card- Bld  8/9/2005 DONE
Print Occupancy Form  8/9/2005 DONE
Permit Ready to Issue  8/9/2005 DONE
Telephone call  8/9/2005 DONE
called ###-#### (mark hixson design) told Patty permit is ready and fees
Routing - PLAN CHECK8/4/2005 8/5/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/5/2005 DONE
Plans taken to permit desk on behalf of John Menard.
Plan assigned to (JCM)5/18/2005 8/5/2005 PASS
8/5/2005 08:58:01 MYS - activity updated through activity BLDA022 from case BLD05-01302.
Plan resubmittals received  8/4/2005 DONE
received misrouted resubmittal letter and revised SD1.3 from architect dated 6/6/2005 which was not properly submitted to the plans review customer counter.
Routing - FIRE8/4/2005 8/4/2005 PASS
Resubmitted revisions to SD1.3 are acceptable. Revised review comments faxed to architect.
Routing - Erosion and Sediment8/4/2005 8/4/2005 PASS
ESC plan waiver request approved with attached conditions.
Plan resubmittals received  5/31/2005 FAIL
received revised plans but FD turning radius not modified to meet requirements. I called United Water and got hydrant info by phone as a courtesy. Called architect to discuss; not available, left message. Faxed review to architect.
Telephone call  5/27/2005 DONE
I called architect. Spoke with Nick. Expalined problem. he thinks the site plan should be at 1:30. I requested he verify that the turning radius in parking lot has 28'/28' turning radius. If it does, call me and I'll get plans and process them. If it doesn't, they need to revise plans so we do have the required clearance for FD access.
1st review completed  5/26/2005 FAIL
failed fire and ESC
Routing - PLAN CHECK5/26/2005 5/26/2005 PEND
Hold waiting for resubmittals for Fire and ESC.
8/4/2005-Rerouted to Fire then to ESC. Once both have approved permit can be issued. (MSouthard)
Routing - FIRE5/24/2005 5/26/2005 FAIL
Plan scale does not match dimensions shown for new shelter. FD access is not adequate if dimensions of the new shelter are applicable to the site layout. Called architect; left mesage for archtiect to advise correct scale.
Routing - PLANNING5/23/2005 5/24/2005 PASS
Cody R.
Routing - PLAN CHECK5/24/2005 5/24/2005 PASS
John M.
Routing - Erosion and Sediment5/23/2005 5/23/2005 FAIL
ESC waiver request denied. Contacted PD. ESC plan must be submitted.
Routing - PUBLIC WORKS5/19/2005 5/23/2005 PASS
Routing - PLANNING Land Div5/18/2005 5/18/2005 PASS
Approved. Site is over 5 acres in size.
Recd Pcfee & Taken To Pln CK  5/18/2005 DONE
Plans ACCEPTED BY PLAN TECH  5/18/2005 DONE
Ok to take in per Marlene.
Plans ACCEPTED BY PLAN TECH  5/18/2005  
Plan routing begun/NEW & ADDTN  5/18/2005  
Application received  5/17/2005  
Fee Review-notes5/18/20055/18/2005