BLD-Final | 12/9/2005 | 12/9/2005 | 12/9/2005 | P | PASS |
Jim Sly
|
|
|
Jim, I was able to find the certificate. We did finish the handrail, the crawl is insulated and the numbers are posted. Thank you; Phone #: ###-#### Internet Inspection Request from: Justin Stevens C/C issued
|
DOC - Permit Finaled | 12/9/2005 | 12/9/2005 | 12/9/2005 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 12/5/2005 | 12/6/2005 | 12/8/2005 | P | NR |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Justin Stevens
|
BLD-Grading Inspection | 12/5/2005 | 12/6/2005 | 12/6/2005 | P | CANC |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Justin Stevens
|
BLD-Final | 12/2/2005 | 12/2/2005 | 12/2/2005 | P | CANC |
Jim Sly
|
|
|
spencer Note: late as possible please; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles wrong permit ele
|
BLD-Framing/Rough-in | 9/26/2005 | 9/27/2005 | 9/27/2005 | A | PASS |
Mike Jordan
|
|
|
Please Call me to meet you at the job to discuss the correction for footings and foundation walls. The concrete sub has verified the rebar that is required. What do you want me to provide exactly for verification. The Concrete sub did call the inspection and said he did meet the inspector at the job site. Please let me know. Thank you. Justin; Phone #: ###-#### Internet Inspection Request from: Justin Stevens. Found out that a partial foundation insp had been complete. confusoion due to early start permit. Performed energy code insp. while on site. ok to cover.
|
BLD-Energy code compliance | 9/22/2005 | 9/22/2005 | 9/22/2005 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/22/2005 at 8:38:59 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/22/2005 | 9/22/2005 | 9/22/2005 | P | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/22/2005 at 8:38:23 AM. Contact: ###-####. Noted no previous inspections on foundation system. Must provide engineer sign off or verification that all reinforcement has been installed. Also see posted c/n for all framing issues. ok to insulate, can not give ok to cover until foundations issues have been resolved as per George Slane.
|
Plan assigned to (SRZ) | 7/1/2005 | 7/1/2005 | 7/18/2005 | | PASS |
|
|
|
7/18/2005 08:54:48 SRZ - activity updated through activity BLDA022 from case BLD05-01333.
|
Routing - PLAN CHECK | 6/8/2005 | | 7/18/2005 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 7/18/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/18/2005 | | DONE |
|
|
|
ONE SET RED-LINED
|
Permit Ready to Issue | | | 7/18/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/18/2005 | | |
|
|
|
|
Telephone call | | | 7/18/2005 | | DONE |
|
|
|
tlk to stetson homes ###-#### that permit and fees are ready to be picked up
|
Issue PAID IN FULL permit | | | 7/18/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/8/2005 | | |
|
|
|
Received (1) copy of sheet 1-9 and (1) copy of garage header specs. Routed to Sam Z.
|
Plan assigned to (SAM) | 5/19/2005 | 5/19/2005 | 7/1/2005 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 7/1/2005 | | PASS |
|
|
|
Pending plan corrections, Tall wall Engineering, and re-submittal. I faxed a list of requirements to Justin with Stetson homes on 07/01/05.
|
BLD-Footing | 6/30/2005 | 6/30/2005 | 6/30/2005 | P | PART |
Mike Jordan
|
|
|
###-#### - justin. early start.
|
Early Start Permit | | | 6/28/2005 | | |
|
|
|
|
Routing - PUBLIC WORKS | 6/8/2005 | | 6/8/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 6/8/2005 | | 6/8/2005 | | PASS |
|
|
|
revised site plan with applicant. Site plan approved as noted. eeg
|
Routing - PLANNING | 5/20/2005 | | 5/26/2005 | | FAIL |
|
|
|
driveway and site plan corrections.
|
Application received | | | 5/19/2005 | | |
|
|
|
|