Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-01335
StatusFinaled
Name PIONEER HOMES
Site Address 11097 W GREYLING DR
Project Name 
Customer Number 
ePlanReviewNo
Description
"THE PERMIT HOLDER is responsible to comply with current wall bracing requirements as adopted by Boise City." To construct a 3247 sq. ft. two story single family dwelling (1568 sq. ft. first floor / 1679 sq. ft. second floor) with a attached 933 sq. ft. three car garage, a 500 sq. ft. DETACHED two car garage, a 173 sq. ft. covered back porch and a 171 sq. ft. covered front porch. Per approved plans and requirement list. (SAM)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/27/20061/30/20061/30/2006APASS
DetailsMike Jordan
Ben -- call 1st for access; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
DOC - Permit Finaled1/30/20061/30/20061/30/2006PPASS
DetailsMike Jordan
BLD-Framing/Rough-in11/23/200511/23/200511/23/2005PPASS
DetailsMike Jordan
mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. All items on c/n have been repaired. ok to cover.
BLD-Framing/Rough-in11/22/200511/22/200511/22/2005PFAIL
DetailsMike Jordan
mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. All hangars not nailed off (downstairs)
BLD-Energy code compliance11/17/200511/18/200511/18/2005AFAIL
DetailsMike Jordan
mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Items on previous c/n not repaired. Not ok to cover.
BLD-Framing/Rough-in11/14/200511/15/200511/15/2005PFAIL
DetailsMike Jordan
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Needs to complete lateral bracing on attic trusses. see c/n.
BLD-Foundation9/19/20059/20/20059/20/2005ANR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 9/19/2005 at 10:23:05 AM. Contact: ###-####.
BLD-Foundation9/19/20059/20/20059/20/2005ANR
DetailsTom Arcoraci
BLD-Footing9/19/20059/19/20059/19/2005PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 9/19/2005 at 10:22:46 AM. Contact: ###-####.
CHANGE STATUS TO (ISS)  9/16/2005 DONE
(F) Reprint permit  9/16/2005 DONE
Case Summary (BLD)  9/13/2005  
PLANS/APPL TAKEN TO FRONT DESK  9/13/2005 DONE
Override - Parcel Holds  9/13/2005  
Permit Ready to Issue  9/13/2005 DONE
Override - Parcel Holds  9/13/2005  
Inspection Record Card- Bld  9/13/2005 DONE
Telephone call  9/13/2005 DONE
called ###-#### and told Rebecca permit is ready and fees
Routing - PLAN CHECK8/29/2005 9/13/2005 PASS
CHANGE STATUS TO (PND)  9/12/2005 PEND
Builder resubmitted new plans to meet minimum square footage for architectural design community.
Routing - PUBLIC WORKS8/26/2005 8/29/2005 PASS
Routing - PLANNING8/26/2005 8/26/2005 PASS
Revised plans meet setback requirements. Plans were not received by Planning Staff until 8/26/05. EG posessed plans prior to this date. CER
Plan resubmittals received  8/24/2005  
Plan Resubmittals received. Original plan approved for this lot did not meet 1st floor minimum square footage for the architectural design committee. Construction stopped. Modified plan submitted.
BLD-Foundation7/28/20057/29/20057/29/2005PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/28/2005 at 7:24:40 AM. Contact: ###-####.
BLD-Footing7/28/20057/28/20057/28/2005APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/28/2005 at 7:24:22 AM. Contact: ###-####. wip ok
Issue PAID IN FULL permit  7/22/2005 DONE
Plan assigned to (SRZ)7/18/20057/18/20057/19/2005 PASS
7/19/2005 10:41:57 SRZ - activity updated through activity BLDA022 from case BLD05-01335.
Case Summary (BLD)  7/19/2005  
PLANS/APPL TAKEN TO FRONT DESK  7/19/2005 DONE
ONE SET RED-LINED
Inspection Record Card- Bld  7/19/2005 DONE
Permit Ready to Issue  7/19/2005 DONE
Telephone call  7/19/2005 DONE
tlk to secretary ###-#### that permit and fees are ready to be picked up
Routing - PLAN CHECK6/28/2005 7/19/2005 PASS
Plan assigned to (SAM)5/19/20055/19/20057/18/2005 DONE
Routing - PUBLIC WORKS6/28/2005 6/28/2005 PASS
Routing - PLANNING6/27/2005 6/27/2005 PASS
received revised site plan and discussed with Mike Toft - approved as noted. eeg.
Application received  5/19/2005  
Routing - PLANNING5/20/2005   FAIL
driveway width greater than 33' before adding the side drive to the detached garage. called applicant 2nd time 5/26/05