BLD-Final | 3/30/2006 | 3/31/2006 | 3/31/2006 | A | PASS |
Tony Young
|
|
|
re-inspection; Phone #: ###-####
|
DOC - Permit Finaled | 3/31/2006 | 3/31/2006 | 3/31/2006 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 3/29/2006 | 3/30/2006 | 3/30/2006 | P | PART |
Tony Young
|
|
|
Eric; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ok on inside but,, need to finish exterior stair handrail and guard rail,, also on upper bedroom door egress
|
BLD-Grading Inspection | 3/30/2006 | 3/30/2006 | 3/30/2006 | | BOND |
|
|
|
Grading and drainage have not been completed at the above mentioned address. To finish the incomplete items listed below the engineer has recommended a bond of $6,000.00. The items yet to be completed include:
1. The retaining wall behind the house.
2. Final grading.
3. Roof drainage system.
4. Providing an easement for the roof drain that ties into the adjacent lot to the west.
Upon submission of the $6,000.00 bond the grading and drainage is conditionally approved
|
BLD-Final | 3/29/2006 | 3/29/2006 | 3/29/2006 | P | NR |
Jim Sly
|
|
|
Eric; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Foundation | 3/20/2006 | 3/20/2006 | 3/20/2006 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/20/2006 at 8:04:19 AM. Contact: ###-####. wip on front and side retaining walls and stair walls
|
PubWorks Subgrade Approval | 3/17/2006 | 3/17/2006 | 3/17/2006 | | DONE |
|
|
|
FOOTING SUBGRADE FOR RETAINING WALLS HAS BEEN APPROVED BY THE GEOTECHNICAL ENGINEER
|
BLD-Footing | 3/14/2006 | 3/15/2006 | 3/15/2006 | A | PASS |
Tom Arcoraci
|
|
|
Brandon; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Footing | 3/9/2006 | 3/10/2006 | 3/9/2006 | P | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/9/2006 at 3:12:17 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Mar 9 2006 3:43PM.
|
BLD-Energy code compliance | 1/4/2006 | 1/5/2006 | 1/5/2006 | A | PASS |
Tony Young
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 1/3/2006 | 1/4/2006 | 1/4/2006 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 1/3/2006 at 11:24:03 PM. Contact: ###-####. wip,, Ingo Stroup coming out also (via contractor) to get energy star?
|
BLD-Wall cover | 1/2/2006 | 1/3/2006 | 1/3/2006 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 1/2/2006 at 10:26:06 PM. not ready,, and c/n not complete
|
BLD-Framing/Rough-in | 12/29/2005 | 12/29/2005 | 12/29/2005 | P | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 12/29/2005 at 8:02:24 AM. Contact: ###-####. Needs to install floor to floor straps, finish nailing all simpson hangars, provide solid blocking at the 3 11 7/8 ml down to basement.
|
BLD-Framing/Rough-in | 12/27/2005 | 12/27/2005 | 12/27/2005 | P | NR |
Tony Young
|
|
|
Phone #: ###-#### need trades and seal pack 1st
|
BLD-Framing/Rough-in | 12/23/2005 | 12/27/2005 | 12/27/2005 | A | NR |
Tony Young
|
|
|
erick ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 12/21/2005 | 12/22/2005 | 12/22/2005 | P | NR |
Tony Young
|
|
|
eric; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa need trades 1st,, seal pack,, walk through conf.,, shear no complete on upper areas
|
BLD-Foundation | 9/30/2005 | 9/30/2005 | 10/3/2005 | P | PASS |
Dave Hannah
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 9/9/2005 | 9/9/2005 | 9/15/2005 | P | PART |
Mike Jordan
|
|
|
michael; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
PubWorks Subgrade Approval | 5/23/2005 | 5/23/2005 | 7/15/2005 | | DONE |
|
|
|
footing subgrade for house foundation approved by the geotechnical engineer.7/15/05
A letter from the applicant's geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####.
|
Override - Activity Holds | | | 7/6/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/6/2005 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 6/16/2005 | 6/16/2005 | 6/20/2005 | | PASS |
|
|
|
6/20/2005 13:21:33 SRZ - activity updated through activity BLDA022 from case BLD05-01336.
|
Plan assigned to (SAM) | 5/19/2005 | 5/19/2005 | 6/20/2005 | | PASS |
|
|
|
6/20/2005 13:21:33 SRZ - activity updated through activity BLDA022 from case BLD05-01336.
|
Routing - PLAN CHECK | 5/31/2005 | | 6/20/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2005 | | DONE |
|
|
|
ONE SET RED-LINED
|
Override - Activity Holds | | | 6/20/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/20/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/20/2005 | | DONE |
|
|
|
|
Override - Activity Holds | | | 6/20/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 6/20/2005 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 6/16/2005 | | PASS |
|
|
|
Pending info form Structural Engineer. I called and left message with Tim on Thursday 06/16/05. (SRZ)
|
Routing - FIRE | 5/27/2005 | | 5/31/2005 | | PASS |
|
|
|
No fire sprinklers required (Afton Street sub)
|
Routing - Erosion and Sediment | 5/27/2005 | | 5/27/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING | 5/24/2005 | | 5/26/2005 | | PASS |
|
|
|
Routed to Angela Wood per CUP. (Actually Signed on May 19, 2005 b/c/ plans came to p&z first)
|
Routing - PUBLIC WORKS | 5/24/2005 | | 5/24/2005 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 5/20/2005 | | 5/23/2005 | | PASS |
|
|
|
Approved as Category 1 by CFH05-00006.
Angela Wood Delivered to me 5/20/05 late morning.
|
Application received | | | 5/19/2005 | | |
|
|
|
|