Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD05-01345
StatusFinaled
Name DAVE EVANS CONSTRUCTION
Site Address 1017 E PARK BLVD
Project NamePark Blvd Office Park-Bldg D
Customer Number 
ePlanReviewNo
Description
(ARROWROCK CLASSICAL SCHOOL) This building is NOT fire sprinklered. To create a private school for kindergarten through 6th grade within an existing 2,214 square foot, one story building. The school will occupy the entire building. Work is to include 2 restrooms accessible to the disabled, 4 exterior doors, interior nonbearing walls, millwork, and finishes. All work shall comply with the approved drawings, the plan review report, and all applicable codes. CUP05-00022 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD6/14/20066/14/20069/14/2006 DONE
Second Notice has not been responded to.
Telephone call  9/14/2006 DONE
tlk to ashley heating to verify if a permit was issued or not 12:15 pm - he wil call me back concerning this mech permit
Telephone call  9/14/2006  
tlk to steffin ashley heating - did not issue permit for mech 12:20 9/14/06
Second Notice BLD4/14/20064/14/20066/14/2006 DONE
First Notice has not been responded to.
First Notice 4/4/20064/14/2006 DONE
Permanent occupancy  4/4/2006 DONE
Perm. Occ. Cert. # 10963 issued 4-4-06 to Arrowrock Classical School.
BLD-Final11/21/200511/22/200511/22/2005PPASS
DetailsDave Hannah
robie ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for prem occ
FIRE-Final Inspection11/21/200511/22/200511/22/2005APASS
DetailsForrest France
The related fire alarm permit has been finaled. Fire life safety is acceptable for permanent occupancy.
Permanent Occupancy 11/22/200511/22/2005 DONE
Details
Temporary occupancy  10/5/2005 DONE
Temp. Occ. Cert. # 5284 issued 10-5-05 to the Arrowrock Classical School.
FIRE-Conference9/15/20059/15/20059/15/2005PDONE
DetailsForrest France
On site discussion with contractor regarding the proper location for duct smoke detectors.
BLD-Final9/2/20059/6/20059/8/2005PDONE
DetailsDave Hannah
robbie; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Final9/1/20059/2/20059/8/2005PPART
DetailsDave Hannah
robbie; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for temp occ ok for perm occ after fire alm gos perm
FIRE-Final Inspection9/7/20059/7/20059/7/2005PPART
DetailsForrest France
A temporary occupancy was granted with Sam Rogers permission pending final of the fire alarm permit, all other life safety issues are acceptable.
PRINT Activities  9/6/2005 DONE
Case Summary (BLD)  9/6/2005 DONE
FIRE-Final Inspection9/1/20059/2/20059/2/2005APART
DetailsForrest France
Fire alarm permit must be finaled prior to BLD fire/life safety final. All other life safety issues have been inspected and are satisfactory.
FIRE-Alarm Testing8/31/20059/1/20059/1/2005PFAIL
DetailsForrest France
This inspection was for the fire alarm which was not completed yet.
FIRE-Final Inspection8/31/20059/1/20059/1/2005PFAIL
DetailsForrest France
Provide signage for fire lane, provide directional arrows on exit signs in hall, test and final fire alarm prior to life safety sign off.
FIRE-Final Inspection8/31/20058/31/20058/31/2005PFAIL
DetailsForrest France
Fire alarm must be completed and inspected prior to fire life safety sign off.
BLD-Energy code compliance7/6/20057/7/20057/8/2005APASS
DetailsDave Hannah
glen; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa plumbing has been inspected ok to cover
BLD-Framing/Rough-in7/1/20057/5/20057/5/2005PPASS
DetailsTom Arcoraci
###-#### ok to insulate pending plumbing ok ( no sticker)
BLD-Concrete6/14/20056/15/20056/15/2005APART
DetailsDave Hannah
GLEN; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Issue PAID IN FULL permit  6/9/2005  
Routing - PLAN CHECK6/7/2005 6/8/2005 PASS
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  6/8/2005 DONE
Inspection Record Card- Bld  6/8/2005 DONE
Print Occupancy Form  6/8/2005 DONE
Telephone call  6/8/2005 DONE
lft mes for traves burrows ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  6/8/2005 DONE
Plan assigned to (CJW)5/25/2005 6/8/2005 PASS
6/8/2005 12:45:21 CJW - activity updated through activity BLDA022 from case BLD05-01345.
Routing - FIRE6/1/2005 6/7/2005 PASS
review faxed to architect.
1st review completed  6/7/2005 FAIL
failed planning and plan check.
Plan resubmittals received  6/3/2005  
Received (2) copies of sheet 2, 3 and SN. Routed to Carl W.
Routing - PLAN CHECK5/27/2005 6/1/2005 FAIL
The IBC plan review was started on May 31, 2005 and was finished the next day. Revised drawings were required. See the plan review report.
Routing - PLUMBING5/26/2005 5/27/2005 PASS
per plans and 2003 upc.
Routing - PLANNING5/26/2005 5/26/2005 PASS
PASS for conditional use: Angela Wood CUP05-00022

Appeal period has not lapsed for Design Review. Appeal period ends May 27, 2005 at 5:00 p.m. Should be able to sign off on plans by May 31. Routed to Plumbing.

No appeals rcvd. 6/ 8/ 2005
Routing - PUBLIC WORKS5/26/2005 5/26/2005 PASS
Plans ACCEPTED BY PLAN TECH  5/26/2005  
Travis returned plans with CDH approval. Routed back to Marlene.
Routing Off Site - C.D.H5/26/2005 5/26/2005 PASS
Travis Burrows (contractor) hand carried plans to CDH for review an approval on this date. Beth Norberg, CDH approved them.
Telephone call  5/25/2005 DONE
5:30 p.m. - Talked to Wes Steele (architect) via phone and left a message for Travis (contractor) that the plans needed to be reviewed by Central District Health. Wes said he or Travis would be in to hand carry the plans to CDH for review and return them to the PDS Dept. to continue processing.
Plans ACCEPTED BY PLAN TECH  5/23/2005  
Application received  5/20/2005  
Override - Parcel Holds  5/20/2005  
Override - Parcel Holds  5/20/2005  
Recd Pcfee & Taken To Pln CK  5/20/2005 DONE
Fee Review-notes5/20/20055/20/2005