Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-01347
StatusFinaled
Name BENCHMARK CONSTRUCTION
Site Address 10062 W FAIRVIEW AVE Unit: 110
Project NameFAIRVIEW OFFICE PARK BLDG #1
Customer Number 
ePlanReviewNo
Description
(DOWNEY CHIROPRACTIC) This building is NOT fire sprinklered. To create a 1,485 square foot chiropractic tenant space within an existing 4,140 square foot, one story building. Work is to include interior nonbearing walls, a restroom accessible to the disabled, interior doors, suspended ceilings, millwork, and finishes. The work shall comply with the approved drawings, the plan review report, and all applicable codes. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/6/200512/6/20051/11/2006 DONE
Second Notice has not been responded to.
Second Notice BLD10/31/200510/31/200512/6/2005 DONE
First Notice has not been responded to.
First Notice 10/20/200510/31/2005 DONE
Permanent Occupancy 10/20/200510/20/2005 DONE
Details
Permanent occupancy UNPAID FEE  10/20/2005 DONE
Perm. Occ. Cert. # 10747 issued 10-20-05 to Downey Chiropractic.
Temporary occupancy  9/9/2005 DONE
Temp. Occ. Cert. # 5270 issued 9-9-05 to Downey Chiropractic.
BLD-Final9/7/20059/8/20059/8/2005PPART
DetailsJim Sly
###-####
OK for Temp Occ. C/N.....OK for Perm Occ when Electr signs off for Perm Occ. Obtain Perm Occ status within 90 days of this notice.
FIRE-Final Inspection9/7/20059/8/20059/8/2005AFAIL
DetailsForrest France
###-#### - terry Need to provide signage above both main entry/exit doors, provide visual indicators of the lock condition at both main entry/exit doors, provide and install fire extinguisher with current tag as discussed.
FIRE-Final Inspection9/8/20059/8/20059/8/2005PPASS
DetailsForrest France
Life safety passed inspection.
BLD-Final9/1/20059/7/20059/7/2005PNR
DetailsTom Arcoraci
terry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
FIRE-Final Inspection9/1/20059/7/20059/7/2005ACANC
DetailsForrest France
terry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Note; changing dates
BLD-Framing/Rough-in8/31/20059/1/20059/1/2005APASS
DetailsMike Jordan
ceiling grid inspection///terry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in7/29/20058/1/20058/1/2005APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 7/29/2005 at 2:00:52 PM. Contact: ###-####.
Frame....OK to cover (wall insul OK)
BLD-Framing/Rough-in7/21/20057/22/20057/22/2005ANR
DetailsTom Arcoraci
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Issue PAID IN FULL permit  7/5/2005 DONE
Inspection Record Card- Bld  6/21/2005 DONE
Print Occupancy Form  6/21/2005  
Permit Ready to Issue  6/21/2005  
Telephone call  6/21/2005 DONE
left mess for andrew davis at ###-####0 permit is ready
Routing - PLUMBING6/17/2005 6/20/2005 PASS
Note on developer and 120 limit stops or mxer valve for wash basin.
Routing - PLAN CHECK6/20/2005 6/20/2005 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/20/2005 DONE
Plan assigned to (CJW)5/26/2005 6/20/2005 PASS
6/20/2005 13:34:08 CJW - activity updated through activity BLDA022 from case BLD05-01347.
Routing - PLAN CHECK6/9/2005 6/17/2005 PASS
Sent back to Plumbing.
Plan resubmittals received  6/15/2005  
Received (2) copies of sheet A1.1, A2.1 and A3.1. Also received (2) copies of System Load Report and (1) copy structural calcs. Routed to Carl W.
Routing - FIRE6/3/2005 6/9/2005 PASS
1st review completed  6/9/2005 FAIL
failed plan check and plumbing.
Routing - PLAN CHECK6/1/2005 6/3/2005 FAIL
The IBC plan review report was started on June 2, 2005 and was finished the next day. Revised drawings were required. See the plan review report.
Routing - PLUMBING5/31/2005 6/1/2005 FAIL
Need to clarify plumbing questions with a plan as required for Med t/s
Routing - Erosion and Sediment5/31/2005 5/31/2005 PASS
ESC plan waiver request approved with attached conditions.
Routing - PUBLIC WORKS5/26/2005 5/31/2005 PASS
Plans ACCEPTED BY PLAN CHECK  5/23/2005  
Application received  5/20/2005  
Recd Pcfee & Taken To Pln CK  5/20/2005  
Fee Review-notes5/20/20055/20/2005