Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-01370
StatusFinaled
Name SHUR-LUCK HOMES
Site Address 4374 N BUCKBOARD PL
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 1687sq.ft. two story single family dwelling (745sq.ft. Main floor / 942sq.ft. Upper level) with a 84sq.ft. Covered front porch, and a 473sq.ft. Attached garage per approved plans, all red-lining, and PLAN REVIEW REPORT. THE PERMIT HOLDER is responsible to comply with current wall bracing requirements adopted by the city of Boise. (SRZ)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/29/20063/30/20063/30/2006APASS
DetailsJim Sly
call for access code///pat; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
C/C issued
DOC - Permit Finaled3/30/20063/30/20063/30/2006PPASS
DetailsJim Sly
BLD-Energy code compliance1/12/20061/13/20061/13/2006PPASS
DetailsJim Sly
russell; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in1/6/20061/6/20061/6/2006PPASS
DetailsJim Sly
russell; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing11/8/200511/9/200511/9/2005APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/8/2005 at 5:42:25 PM. Contact: ###-####.
Issue PAID IN FULL permit  10/25/2005  
Telephone call  10/5/2005 DONE
left mess that permit is ready
Permit Ready to Issue  9/21/2005 DONE
Inspection Record Card- Bld  9/21/2005 DONE
Plan assigned to (SRZ)9/19/20059/19/20059/20/2005 PASS
9/20/2005 10:55:11 SRZ - activity updated through activity BLDA022 from case BLD05-01370.
Case Summary (BLD)  9/20/2005  
Case Summary (BLD)  9/20/2005  
PLANS/APPL TAKEN TO FRONT DESK  9/20/2005 DONE
ONE SET RED-LINED.
Routing - PLAN CHECK8/31/2005 9/20/2005 PASS
Plan assigned to (SAM)5/24/20055/24/20059/19/2005 DONE
Routing - PUBLIC WORKS8/31/2005 8/31/2005 PASS
Routing - PLANNING8/31/2005 8/31/2005 PASS
new plans submitted 8/30/05
Plan resubmittals received  8/8/2005  
Received new set of plans taken to Evelyn G . ///DLD
Application received  5/24/2005  
Routing - PLANNING5/27/2005   FAIL
hold - no site plan received and does not meet interior garage dimensions. eeg
Routing - PLANNING8/9/2005   FAIL
8/9/05 building setbacks not met for front and rear yard. Discussing options with applicant.
Routing - PLANNING8/19/2005   FAIL
spoke with applicant - redesign of floor plan to meet setbacks pending. eeg.