Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/22/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 5/8/2008 | 5/8/2008 | 8/11/2008 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 5/7/2008 | 5/8/2008 | 5/8/2008 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/7/2008 at 9:19:02 AM. Contact: ###-####. C/C issued
|
DOC - Permit Finaled | 5/8/2008 | 5/8/2008 | 5/8/2008 | P | PASS |
Jim Sly
|
|
|
|
Code Occupancy Approval | 5/5/2008 | 5/5/2008 | 5/5/2008 | P | PASS |
Carol Montgomery
|
|
|
Meets Compliance. Pass.
|
Code Occupancy Approval | 3/27/2008 | 3/27/2008 | 3/27/2008 | P | CANC |
Carol Montgomery
|
|
|
All landscaping needs to be completed (sprinkler system back filled, sod and bark put in) (plants appear to be here) or bonded for. Bike rack needs to be put in place and gates on trash enclosures need to be installed. (Someone told him all he needed was to have code enf. come out and look at the color of the building.
|
BLD-Final | 3/24/2008 | 3/25/2008 | 3/25/2008 | A | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/24/2008 at 9:49:47 AM. Contact: ###-####.
|
BLD-Conference | 3/25/2008 | 3/25/2008 | 3/25/2008 | A | PEND |
Jim Sly
|
|
|
Waiting for P/W and Zoning finals
|
FIRE-Final Inspection | 3/21/2008 | 3/24/2008 | 3/24/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 2/26/2008 | 2/27/2008 | 2/27/2008 | A | PEND |
Jim Sly
|
|
|
Call Dave at .....###-####...... Dave is working on getting Fire, Public works, and Zoning signed off......
|
FIRE-Final Inspection | 2/18/2008 | 2/19/2008 | 2/19/2008 | A | FAIL |
Troy Cobbley
|
|
|
Provide address facing the street, provide fire lane signage as per one of the three options per the review comments and provide the fire dept. access/compact parking as per the approved plans.
|
BLD-Framing/Rough-in | 2/18/2008 | 2/19/2008 | 2/19/2008 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/18/2008 at 2:07:08 PM. Contact: ###-####.
|
BLD-Conference | 2/14/2008 | 2/15/2008 | 2/15/2008 | A | DONE |
Jim Sly
|
|
|
Call Dave at ###-#### Dave was not aware that Bldg was not finaled. He will work on it.
|
BLD-Aging Inspection | 2/14/2008 | 2/14/2008 | 2/14/2008 | | PEND |
Jim Sly
|
|
|
Need to meet with Dave ###-####....to discuss requirements for final.
|
(F) Reprint permit | | | 11/27/2007 | | |
|
|
|
|
BLD-Framing/Rough-in | 1/30/2006 | 1/31/2006 | 2/1/2006 | A | PART |
Jim Sly
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie shear walls OK
|
BLD-Foundation | 9/22/2005 | 9/22/2005 | 9/22/2005 | P | PASS |
Jim Sly
|
|
|
as late as possible please///john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 9/20/2005 | 9/20/2005 | 9/20/2005 | P | PASS |
Jim Sly
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa 2500 PSI design
|
(F) Reprint permit | | | 8/25/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/24/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/16/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/16/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/16/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/16/2005 | | DONE |
|
|
|
called left message ###-#### permit is ready and fees and need ACHD
|
Routing - PLAN CHECK | 8/9/2005 | | 8/15/2005 | | |
|
|
|
John M.
|
Routing - PUBLIC WORKS | 8/15/2005 | | 8/15/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/15/2005 | | 8/15/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/15/2005 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 5/26/2005 | | 8/15/2005 | | PASS |
|
|
|
8/15/2005 13:55:33 JCM - activity updated through activity BLDA022 from case BLD05-01395.
|
Routing - Erosion and Sediment | 8/8/2005 | | 8/9/2005 | | PASS |
|
|
|
ESC resubmittal is approved with attached conditions.
|
Routing - PLAN CHECK | 7/29/2005 | | 8/8/2005 | | |
|
|
|
|
Plan resubmittals received | | | 8/8/2005 | | |
|
|
|
Received (2) copies of ESC plan and narrative. Routed to John M.
|
Routing - FIRE | 7/21/2005 | | 7/29/2005 | | PASS |
|
|
|
resubmittal acceptable; revised review faxed to architect.
|
Routing - PLAN CHECK | 6/30/2005 | | 7/21/2005 | | |
|
|
|
|
Plan resubmittals received | | | 7/21/2005 | | DONE |
|
|
|
Received Transmittal, & 3 Copys of sheet SD1 Taken to John M
|
1st review completed | | | 6/30/2005 | | FAIL |
|
|
|
failed public works, ESC and fire
|
Routing - FIRE | 6/23/2005 | | 6/30/2005 | | FAIL |
|
|
|
Plan intake corrections not resubmitted. review comments discussed with and faxed to architect.
|
Plan Reviewer's activity | | | 6/23/2005 | | PASS |
|
|
|
Reviewed and approved as submitted. JCM
|
Routing - PLAN CHECK | 6/11/2005 | | 6/23/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 6/8/2005 | | 6/11/2005 | | PASS |
|
|
|
Approve.
|
Routing - PLUMBING | 6/7/2005 | | 6/8/2005 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PUBLIC WORKS | 6/2/2005 | | 6/7/2005 | | FAIL |
|
|
|
Boise City policy requires re-submital of plans if not constructed in a years time from approval. Contact Jim Pardy at ###-####
|
Routing - Erosion and Sediment | 6/7/2005 | | 6/7/2005 | | FAIL |
|
|
|
ESC plan does not meet requirements set forth in BMC 8-17. Informed PD.
|
Routing - PLANNING Land Div | 5/26/2005 | | 6/2/2005 | | PASS |
|
|
|
Parcel if over 5 acres in size. Building #6 is 75 feet from property line.
|
Plans ACCEPTED BY PLAN TECH | | | 5/26/2005 | | |
|
|
|
Routed (3) sets of Civils with drainage calcs and O&M to Brian Murphy at time of submittal per Terry Records.
|
Plan routing begun/NEW & ADDTN | | | 5/26/2005 | | |
|
|
|
|
Application received | | | 5/25/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/25/2005 | | |
|
|
|
|
Third Notice BLD | 9/22/2008 | 9/22/2008 | | | |
|
|
|
Second Notice has not been responded to.
|
Fee Review-notes | 5/25/2005 | 5/25/2005 | | | |
|
|
|
|