BLD-Final | 8/9/2005 | 8/10/2005 | 8/10/2005 | A | PASS |
Dave Hannah
|
|
|
jim thresher; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for perm occ
|
FIRE-Final Inspection | 8/9/2005 | 8/9/2005 | 8/9/2005 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Final | 8/8/2005 | 8/9/2005 | 8/9/2005 | A | NR |
Dave Hannah
|
|
|
jim thresher; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 7/28/2005 | 7/29/2005 | 7/29/2005 | P | PART |
Dave Hannah
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ceiling grid ok after elec oks
|
BLD-Framing/Rough-in | 6/20/2005 | 6/21/2005 | 6/21/2005 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/20/2005 at 4:33:50 PM. Contact: ###-####. check wall bracing at ceiling grid inspection
|
Inspection Record Card- Bld | | | 6/14/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/14/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/14/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 6/14/2005 | | |
|
|
|
|
Telephone call | | | 6/14/2005 | | DONE |
|
|
|
talked to jim thresher at ###-#### that permit is ready
|
Issue PAID IN FULL permit | | | 6/14/2005 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 6/1/2005 | | 6/13/2005 | | PASS |
|
|
|
6/13/2005 15:36:25 CJW - activity updated through activity BLDA022 from case BLD05-01403.
|
Routing - PLAN CHECK | 6/10/2005 | | 6/13/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/13/2005 | | DONE |
|
|
|
|
Routing - FIRE | 6/8/2005 | | 6/10/2005 | | PASS |
|
|
|
approved with conditions and annotations; review comments faxed to architect.
|
1st review completed | | | 6/10/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/1/2005 | | 6/8/2005 | | PASS |
|
|
|
The IBC plan review was started on June 6, 2005 and was finished on June 8, 2005. The drawings were approved with corrections. See the plan review report.
|
Plans ACCEPTED BY PLAN TECH | | | 5/31/2005 | | |
|
|
|
|
Application received | | | 5/25/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/25/2005 | | DONE |
|
|
|
|
Fee Review-notes | 5/25/2005 | 5/25/2005 | | | |
|
|
|
|