Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD05-01422
StatusFinaled
Name CSC HOMES LLC
Site Address 8593 -8595 W EVENING STAR DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2580sq.ft. two story duplex (Unit 1 has a 704sq.ft. Main floor, a 671sq.ft. Upper floor, a 565sq.ft. Attached garage, a 358sq.ft. Covered front porch and a 18sq.ft. Covered rear patio / Unit 2 has a 623sq.ft. Main floor, a 582sq.ft. Upper floor, a 483sq.ft. Attached garage, a 30sq.ft. Covered front porch, and a 84sq.ft. Covered rear patio ) per approved plans, all red-lining, and plan review report. THIS STRUCTURE IS BEING BUILT TO ONLY MEET DUPLEX STANDARDS AND NOT TO BE SOLD AS INDIVIDUAL UNITS. (SRZ)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/26/20067/26/20067/26/2006PPASS
DetailsMike Jordan
anthnony; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. all issues have been resolved.
DOC - Permit Finaled7/26/20067/26/20067/26/2006PPASS
DetailsMike Jordan
BLD-Final7/25/20067/25/20067/25/2006PFAIL
DetailsMike Jordan
anthony; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Repaired handrail does not have proper clearance between handrail and window.
BLD-Final7/20/20067/20/20067/20/2006PFAIL
DetailsMike Jordan
anthony ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Needs continpous handrail, landings required on exterior side of main exit door.
BLD-Final7/19/20067/20/20067/20/2006ACANC
DetailsMike Jordan
not ready per mirela. anthony ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in4/6/20064/7/20064/7/2006APASS
DetailsMike Jordan
anthony; Phone #: ###-#### Internet Inspection Request from: Letitia Mesawasher boxes were framed with 5/8 type X, 5/8 type X installed behind tubs as approved by G. Slane. All joints were caulked.
BLD-Framing/Rough-in4/3/20064/3/20064/3/2006PFAIL
DetailsMike Jordan
anthony; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Needs to provide UL listing for washer box, Type X rock required behind tubs.
BLD-Framing/Rough-in3/27/20063/27/20063/27/2006PFAIL
DetailsMike Jordan
anthony ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Still needs to remove non rated box froim 1 hr wall, Add strap to bearing wall at duct penetration upstairs in bathroom. 5/8 type X required behind shower stall. All other framing issues have been repaired as per new approved detail per G. Slane. ok to insulate. c/n posted.
Case Summary (BLD)  3/15/2006  
BLD-Conference3/6/20063/6/20063/6/2006PFAIL
DetailsMike Jordan
said conference w/George//anthony; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Contact designer to resubmit drawings to plan reveiw for repair of framing members to comply with ASTM E119 as noted on approved plans and as per section R317.1 of the IRC. Provide engineering for repairs on cut chords of I joist and oversized holes within 3ft of I joist.
BLD-Conference3/3/20063/3/20063/3/2006PDONE
DetailsMike Jordan
please call 30 min prior//anthony; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Meet with contractor on site regarding membrane penetrations with framing members into one hr. wall. Will meet with G. Slane and contractor on site for possible solutions.
BLD-Framing/Rough-in2/28/20062/28/20062/28/2006PFAIL
DetailsMike Jordan
Anthony; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. 1.- Remove all nonrated boxes from 1 hr. wall.
2.- Replace 5/8 inch type X sheet rock above celing were plumbers punched in the holes.
3.- Framing members not allowed to penetrate 1hr. wall. c/n posted. do not cover.
BLD-Framing/Rough-in2/24/20062/24/20062/24/2006PNR
DetailsMike Jordan
Anthony; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Needs mech. ri insp.
BLD-Other11/28/200511/28/200511/28/2005PPART
DetailsMike Jordan
anthony Note: party wall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Fire seperation wall.
BLD-Foundation10/17/200510/18/200510/18/2005APASS
DetailsMike Jordan
lito; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Footing10/12/200510/12/200510/12/2005PPASS
DetailsTom Arcoraci
lito; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
Issue PAID IN FULL permit  9/26/2005 DONE
Permit Ready to Issue  8/4/2005 DONE
Inspection Record Card- Bld  8/4/2005 DONE
Telephone call  8/4/2005 DONE
left mess that permit is ready
Plan assigned to (SRZ)8/2/20058/2/20058/3/2005 PASS
8/3/2005 13:13:50 SRZ - activity updated through activity BLDA022 from case BLD05-01422.
Case Summary (BLD)  8/3/2005  
Plan Reviewer's activity  8/3/2005 DONE
PENDING CANTILEVER DETAIL.
Plan Reviewer's activity  8/3/2005 DONE
New Res-check
PLANS/APPL TAKEN TO FRONT DESK  8/3/2005 DONE
ONE SET RED-LINED
Routing - PLAN CHECK7/12/2005 8/3/2005 PASS
Plan assigned to (SAM)5/27/20055/27/20058/2/2005 DONE
Routing - PUBLIC WORKS7/11/2005 7/12/2005 PASS
Routing - PLANNING7/11/2005 7/11/2005 PASS
ok per SRS to review without prior duplex review per sub. approved as noted see site plan and foundation plan. eeg.
Application received  5/27/2005  
Routing - PLANNING5/27/2005   FAIL
received Friday 5/27, reviewed 6/1 after Monday holiday. Duplex lot per plat - verified. Verify review standards - no duplex review approval received for duplex standards. eeg