Permit Information
Permit NumberBLD05-01435
StatusFinaled
Name UNICO PROPERTIES
Site Address 101 S CAPITOL BLVD Unit: 300
Project NameUS BANK-3RD FLR
Customer Number 
ePlanReviewNo
Description
(AHRENS & DEANGELI - US BANK BUILDING - STE 300) This building is fire sprinklered because it is a high-rise. To create a 5,513 square foot office tenant space on the 3rd story (about 14,600 square feet total) of an existing high-rise building by expanding a tenant space into an adjacent area. The "core" has a floor area of about 2,670 square feet. The two "core" restrooms were upgraded to be accessible to the disabled under permit BLD03-02198. Work is to include interior nonbearing walls, suspended ceilings, interior doors, interior windows, and finishes. The work shall comply with the approved drawings, the plan review report, and all applicable codes. Selective nonstructural demolition is also covered under this permit. The fire sprinkler system, fire alarm system, and high-rise life safety systems (and the infrastructure supporting these systems) for the 3rd story are regulated under the provisions of the 2000 IBC. If not already existing, fire-safing shall be installed at the perimeter of the 3rd story between the floor and the spandrel glass. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/2/2013 DONE
Third Notice BLD12/6/200512/6/20053/15/2006 DONE
Second Notice has not been responded to.
Second Notice 9/14/200512/6/2005 DONE
First Notice 8/8/20059/14/2005 DONE
Permanent occupancy UNPAID FEE  8/8/2005 DONE
Perm. Occ. Cert. # 10680 issued 8-8-05 to Ahrens & Deangeli on the 3rd floor of the U.S. Bank Bldg.
BLD-Final7/28/20057/28/20057/28/2005PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/28/2005 at 6:55:48 AM. Contact: ###-####. ok for perm occ
FIRE-Final Inspection7/28/20057/28/20057/28/2005PPASS
DetailsForrest France
Fire extinguisher has been moved to a normal path of travel. Fire life safety finaled.
Permanent Occupancy 7/28/20057/28/2005 DONE
Details
BLD-Framing/Rough-in7/25/20057/25/20057/25/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/25/2005 at 7:25:47 AM. Contact: ###-####. ceiling grid ok
BLD-Framing/Rough-in6/24/20056/27/20056/27/2005APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/24/2005 at 1:26:33 PM. Contact: ###-####.ok to cover int walls
Issue PAID IN FULL permit  6/23/2005 DONE
Inspection Record Card- Bld  6/22/2005  
Print Occupancy Form  6/22/2005 DONE
Permit Ready to Issue  6/22/2005  
Telephone call  6/22/2005 DONE
mr deangeli will pickup permit the owner
Plan assigned to (CJW)6/3/2005 6/21/2005 PASS
6/21/2005 10:09:32 CJW - activity updated through activity BLDA022 from case BLD05-01435.
Routing - FIRE6/15/2005 6/21/2005 PASS
Review faxed to architect.
1st review completed  6/21/2005 PASS
Routing - PLAN CHECK6/21/2005 6/21/2005 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/21/2005 DONE
Routing - PLAN CHECK6/6/2005 6/15/2005 PASS
The IBC plan review was started on June 14, 2005 and was finished the next day. The drawings were approved with corrections. See the plan review report.
Routing - PUBLIC WORKS6/3/2005 6/6/2005 PASS
Application received  5/27/2005  
Recd Pcfee & Taken To Pln CK  5/27/2005  
Fee Review-notes5/27/20055/27/2005