BLD-Final | 1/23/2008 | 1/24/2008 | 1/24/2008 | A | PASS |
Mike Jordan
|
|
|
wayne Phone #: ###-#### - please call 1/2 hr prior to inspection
|
DOC - Permit Finaled | 1/24/2008 | 1/24/2008 | 1/24/2008 | P | PASS |
Mike Jordan
|
|
|
All issues from c/n resolved.
|
CHANGE STATUS TO (ISS) | | | 1/23/2008 | | DONE |
|
|
|
Per Tony finaled by mistake
|
BLD-Final | 1/17/2008 | 1/18/2008 | 1/18/2008 | A | FAIL |
Tony Young
|
|
|
ben slaughter - please call 1/2 hr prior to inspection Phone #: ###-#### c/n posted
|
DOC - Permit Finaled | 1/18/2008 | 1/18/2008 | 1/18/2008 | P | CANC |
Tony Young
|
|
|
(This activity was added in error so we have changed the case status back to Issued.) (This activity was added in error so we have changed the case status back to Issued.)
|
BLD-Final | 1/16/2008 | 1/17/2008 | 1/17/2008 | A | PART |
Tony Young
|
|
|
ben slaughter - please call 1/2 hr prior to inspection Phone #: ###-#### got ok from hillside,, will schedule final for am on 18/jan/2008
|
Override - People Holds | | | 1/17/2008 | | |
|
|
|
|
BLD-Grading Inspection | 1/17/2008 | 1/17/2008 | 9/28/2007 | P | DONE |
Terry Records
|
|
|
Final grading and drainage approved.
|
BLD-Final | 9/25/2007 | 9/26/2007 | 9/26/2007 | A | NR |
Tony Young
|
|
|
camil - please call 1/2 hr prior to inspection Phone #: ###-#### phone conf only,, need trades 1st,, no inspection made
|
BLD-Framing/Rough-in | 5/19/2006 | 5/19/2006 | 5/19/2006 | P | PASS |
Tony Young
|
|
|
anthony; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Sprinkler Rough-in | 5/18/2006 | 5/18/2006 | 5/18/2006 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover
|
BLD-Framing/Rough-in | 5/17/2006 | 5/17/2006 | 5/17/2006 | P | NR |
Tony Young
|
|
|
anthony ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie need sprinklers signed off 100%
|
BLD-Framing/Rough-in | 5/11/2006 | 5/11/2006 | 5/11/2006 | P | PART |
Tony Young
|
|
|
anthony; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to insulate,, need full signoff on sprinklers prior to sheet rock
|
BLD-Wall cover | 4/28/2006 | 4/28/2006 | 5/1/2006 | P | NR |
Tony Young
|
|
|
anthony _ Note: shear panel; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles need letter from eng. oking staples .vs nails
|
BLD-Framing/Rough-in | 4/21/2006 | 4/21/2006 | 4/21/2006 | P | FAIL |
Tony Young
|
|
|
shear panel; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung need to NAIL per plan,, or get ok for staples,, also missing some blocking
|
BLD-Framing/Rough-in | 3/3/2006 | 3/3/2006 | 3/3/2006 | P | NR |
Tony Young
|
|
|
camil; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa need fire sprinklers,, redo shear
|
BLD-Foundation | 9/30/2005 | 9/30/2005 | 9/30/2005 | P | PASS |
Tony Young
|
|
|
foundation wall insp//lito; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Foundation | 9/23/2005 | 9/23/2005 | 9/23/2005 | P | FAIL |
Mike Jordan
|
|
|
lito; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Approved plans call for verts at 32 inches on center. contractor placed them at 72 inches on center. Told contractor to cancell 3:00 pm placement and repair stemwall.
|
BLD-Footing | 9/14/2005 | 9/14/2005 | 9/14/2005 | P | PART |
Tony Young
|
|
|
leito; Phone #: ###-#### Internet Inspection Request from: Barbara Moore wip
|
PubWorks Subgrade Approval | 6/2/2005 | 6/2/2005 | 7/28/2005 | | DONE |
|
|
|
Footing subgrade approved. 7/28/05
A letter from the applicant's geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####.
|
Telephone call | | | 6/29/2005 | | DONE |
|
|
|
talked to CSC, told permit is ready and fees
|
Override - Activity Holds | | | 6/29/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/29/2005 | | DONE |
|
|
|
|
Override - Activity Holds | | | 6/28/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 6/28/2005 | | DONE |
|
|
|
|
Override - Activity Holds | | | 6/28/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/28/2005 | | DONE |
|
|
|
|
Telephone call | | | 6/28/2005 | | DONE |
|
|
|
Left message for Camille that permit is ready & fees///6/28/05 4:00pm BAS
|
Routing - PLAN CHECK | 6/7/2005 | | 6/27/2005 | | PASS |
|
|
|
|
Plan assigned to (SAM) | 6/27/2005 | | 6/27/2005 | | PASS |
|
|
|
6/27/2005 15:17:28 SAM - activity updated through activity BLDA022 from case BLD05-01447.
|
Case Summary (BLD) | | | 6/27/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2005 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/6/2005 | | 6/7/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - FIRE | 6/7/2005 | | 6/7/2005 | | PASS |
|
|
|
This house requires an NFPA 13D automatic fire sprinkler system, modified by the installation of a single row of dry sidewall sprinklers along the wall common to attached garages and the living space. (Quail Ridge, 9 sub.)
|
Routing - PLANNING | 6/2/2005 | | 6/6/2005 | | PASS |
|
|
|
completed Monday 6/6/05
|
Routing - PUBLIC WORKS | | | 6/2/2005 | | PASS |
|
|
|
Approved as Cat 3
|
Routing - PUBLIC WORKS | 6/2/2005 | | 6/2/2005 | | PASS |
|
|
|
|
Application received | | | 5/31/2005 | | |
|
|
|
|