Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD05-01455
StatusFinaled
Name JARED - THE GALLERIA OF JEWELRY
Site Address 247 N MILWAUKEE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(JARED THE GALLERIA OF JEWELRY) This building is fully fire sprinklered. To remodel an existing 7,013 square foot retail sales building (6,015 square foot ground floor and 998 square foot mezzanine) for a new retail jewelry store. Work is to include interior nonbearing walls, exterior windows, exterior insulation and finish system, exterior architectural pilasters and bulkheads with sloped metal roofing, concrete footings, masonry foundations, extended parapets, suspended ceilings, millwork, and interior finishes. The work shall comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. DRH05-00070 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD3/1/20063/1/20067/5/2006 DONE
Second Notice has not been responded to.
Second Notice BLD2/3/20062/3/20063/1/2006 DONE
First Notice has not been responded to.
First Notice 1/23/20062/3/2006 DONE
Third Notice BLD12/28/200512/28/20051/11/2006 DONE
Westwood says final change orders & and cost has not been completed yet so I will send out a 1st notice in a couple weeks
Second Notice BLD12/5/200512/5/200512/28/2005 DONE
First Notice has not been responded to.
First Notice 11/21/200512/5/2005 DONE
Permanent occupancy  11/18/2005 DONE
Perm. Occ. Cert. # 10805 issued 11-18-05 to Jared the Galleria of Jewelry.
BLD-Final11/16/200511/17/200511/17/2005PPASS
DetailsJim Sly
dan --after 10????; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
OK for Perm Occ. ():
FIRE-Final Inspection11/16/200511/17/200511/17/2005PPASS
DetailsTroy Cobbley
Fire life safety finaled
Permanent Occupancy 11/17/200511/17/2005 DONE
Details
FIRE-Final Inspection11/14/200511/14/200511/14/2005PFAIL
DetailsTroy Cobbley
Need to final the fie sprinkler permit. Repair exit discharge light at the main exit and the two emergency lights on the mezzanine. Provide signage as discussed for the compressed gas tanks
BLD-Final11/10/200511/10/200511/10/2005PPART
DetailsJim Sly
dan --; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
OK for Temp Occ........Fire Dept ok'd for Temp until Mon.
BLD-Final11/9/200511/10/200511/10/2005ANR
DetailsJim Sly
dan ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Code Occupancy Approval11/10/200511/10/200511/10/2005PCANC
DetailsWm. Michael Meloy
Code Occupancy Approval11/10/200511/10/200511/10/2005PPASS
DetailsWm. Michael Meloy
Compliance met.
Temporary occupancy  11/10/2005 DONE
Temp. Occ. Cert. # 5306 issued 11-10-05 to Jared the Galleria of Jewelry.
BLD-Final11/4/200511/4/200511/4/2005PCANC
DetailsMike Jordan
dan ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Final11/3/200511/3/200511/3/2005PNR
DetailsJim Sly
dan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in10/17/200510/17/200510/17/2005PPART
DetailsJim Sly
dan NOte: ceiling grid ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Grid OK.
Print Occupancy Form  10/4/2005 DONE
Inspection Record Card- Bld  10/4/2005 DONE
BLD-Conference9/26/20059/27/20059/27/2005ADONE
DetailsJim Sly
dan -; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Met with Dan to talk about Req for finals.
BLD-Framing/Rough-in9/16/20059/16/20059/16/2005PPART
DetailsDave Hannah
ok to cover after elec and fire sprinkler R/Is
BLD-Framing/Rough-in9/9/20059/12/20059/12/2005APASS
DetailsJim Sly
dan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Footing8/17/20058/19/20058/18/2005PPART
DetailsJim Sly
dan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Talked to Dan......Srata will perform special inspections on all concrete pours.
BLD-Footing8/16/20058/16/20058/16/2005PFAIL
DetailsJim Sly
dan ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
C/N Vault floor poured W/O special insp......Do not pour any more concrete W/O special insp, or letter from Eng lowering conc strength to 2500PSI
BLD-Foundation8/15/20058/15/20058/15/2005PPART
DetailsJim Sly
rebar///dan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
Need special insp on concrete....foot 3000....walls 4000........OR Need letter from Engineer otherwise.
Issue PAID IN FULL permit  7/22/2005 DONE
Permit Ready to Issue  7/20/2005  
Inspection Record Card- Bld  7/20/2005 DONE
Print Occupancy Form  7/20/2005 DONE
Telephone call  7/20/2005 DONE
talked to dan mueller at ###-#### is ready & need achd
Plan assigned to (CJW)6/3/2005 7/19/2005 PASS
7/19/2005 12:45:59 CJW - activity updated through activity BLDA022 from case BLD05-01455.
Routing - FIRE7/13/2005 7/19/2005 PASS
Routing - PLAN CHECK7/19/2005 7/19/2005 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/19/2005 DONE
Routing - PLAN CHECK6/29/2005 7/13/2005 PASS
Drawings approved after resubmittal review.
Plan resubmittals received  7/11/2005  
Received (2) copies of sheet T1, A1, A10, A14, A18, A20, LC, E1, E3, S2 and S4. Also received (2) copies of structural calcs. Routed to Carl W.
1st review completed  6/29/2005 FAIL
failed plan check, structural and fire.
Routing - FIRE6/22/2005 6/29/2005 FAIL
review faxed to arhcitect.
Plan Reviewer's activity  6/28/2005 DONE
Prepared interior nonstructural demolition permit BLD05-01747.
Routing - Erosion and Sediment6/22/2005 6/22/2005 PASS
ESC plan approved with attached conditions.
Routing - PLAN CHECK6/14/2005 6/22/2005 FAIL
The IBC plan review was started on June 15, 2005 and was finished on June 22, 2005. Revised drawings were required. See the plan review report.
Plan resubmittals received  6/21/2005  
Received ESC application with (2) sets of plans and narrative. Routed to ESC. Resp. Person on app. is invalid. Spoke with John Zabinski (project manager) with Westwood Const. who will call with correct person.
Routing - PLANNING6/7/2005 6/14/2005 PASS
Approved per DRH05-00070.
Routing - Erosion and Sediment6/6/2005 6/7/2005 FAIL
ESC plan waiver denied. Informed contact on application.
Routing - PUBLIC WORKS6/3/2005 6/6/2005 PASS
Plans ACCEPTED BY PLAN TECH  6/2/2005  
Application received  5/31/2005  
Recd Pcfee & Taken To Pln CK  5/31/2005  
Fee Review-notes5/31/20055/31/2005