Second Notice | | 7/24/2009 | 8/5/2009 | | DONE |
|
|
|
|
First Notice | | 7/20/2009 | 7/24/2009 | | DONE |
|
|
|
|
BLD-Final | 7/15/2009 | 7/20/2009 | 7/20/2009 | A | PASS |
Dave Hannah
|
|
|
Your request to final?
|
FIRE-Final Inspection | 7/15/2009 | 7/20/2009 | 7/20/2009 | A | PASS |
Forrest France
|
|
|
Fire life safety approved for final.
|
Permanent Occupancy UNPAID FEE | | | 7/20/2009 | | DONE |
|
|
|
|
BLD-Aging Inspection | 6/4/2009 | 6/4/2009 | 6/4/2009 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/23/2009 | 3/23/2009 | 3/23/2009 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 11/7/2008 | 11/7/2008 | 11/13/2008 | | PASS |
Dave Hannah
|
|
|
|
Plan Reviewer's activity | | | 9/12/2008 | | DONE |
Sam Zahorka
|
|
|
Attached Temporary Occupancy extension letter. See documents.
|
BLD-Final | 8/12/2008 | 8/13/2008 | 8/14/2008 | A | PART |
Dave Hannah
|
|
|
Barb--Dave....the last activity note was from you that ok for temp on 4-20-07 perm when everyone else goes perm......could you please check on the status of this and let me know? Thanks Phone #: ###-####
|
Office Staff conference/action | | | 8/14/2008 | | DONE |
Barbara Stitt
|
|
|
Per Phone call from Dave Hannah-this permit needs to remain in the temp status as part of the Gem Noble Building///8/14/08 BAS
|
BLD-Conference | 3/14/2008 | 3/14/2008 | 3/14/2008 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/6/2008 | 3/6/2008 | 3/6/2008 | | PASS |
Dave Hannah
|
|
|
|
Temporary occupancy | | | 4/26/2007 | | DONE |
|
|
|
Temp. Occ. Cert. #5572 issued 4-26-07 to Riebe's Shoe Repair.
|
BLD-Final | 4/20/2007 | 4/20/2007 | 4/20/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/19/2007 at 9:48:11 PM. Contact: ###-####. ok for tem occ ok for perm after others go perm
|
BLD-Final | 4/19/2007 | 4/20/2007 | 4/20/2007 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/19/2007 at 9:48:11 PM. Contact: ###-####.
|
FIRE-Final Inspection | 4/19/2007 | 4/20/2007 | 4/20/2007 | A | PART |
Forrest France
|
|
|
Final pending completion and final of the building fire alarm and sprinkler upgrade permits.
|
FIRE-Final Inspection | 4/13/2007 | 4/16/2007 | 4/16/2007 | A | FAIL |
Forrest France
|
|
|
Missing required signage at the main entry/exit, one emergency light is not yet installed, need to verifiy adjacent exit discharge light will cover the back exterior exit way sufficiently, provide 2nd pc. canopies for two FS pendednts and remove plastic travel cap on one head in the storage room.
|
BLD-Final | 4/13/2007 | 4/16/2007 | 4/16/2007 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/13/2007 at 1:27:35 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Apr 16 2007 7:42AM.
|
Print Occupancy Form | | | 4/6/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/6/2007 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 9/28/2006 | 9/29/2006 | 9/29/2006 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/28/2006 at 12:02:53 PM. Contact: ###-####. ok to insulate
|
BLD-Framing/Rough-in | 9/23/2005 | 9/23/2005 | 9/26/2005 | P | PART |
Dave Hannah
|
|
|
Jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to cover ceiling
|
Plan assigned to (CJW) | 6/3/2005 | | 6/30/2005 | | PASS |
|
|
|
6/30/2005 09:55:09 CJW - activity updated through activity BLDA022 from case BLD05-01462.
|
Routing - PLAN CHECK | 6/29/2005 | | 6/30/2005 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/30/2005 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 6/30/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/30/2005 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 6/30/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 6/30/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/30/2005 | | DONE |
|
|
|
|
Telephone call | | | 6/30/2005 | | DONE |
|
|
|
tlk to secretary for Gary Christenesen ###-#### and left vm with Amy hellmund ###-#### that permit and fees are ready to be picked up
|
Override - Parcel Holds | | | 6/30/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/30/2005 | | DONE |
|
|
|
|
Routing - FIRE | 6/23/2005 | | 6/29/2005 | | PASS |
|
|
|
review comments faxed to architect.
|
1st review completed | | | 6/29/2005 | | FAIL |
|
|
|
failed plan check.
|
Plan resubmittals received | | | 6/28/2005 | | |
|
|
|
Received (4) copies of sheet G-00, A101 and A102. Routed to Carl W.
|
Routing - PLAN CHECK | 6/6/2005 | | 6/23/2005 | | FAIL |
|
|
|
The IBC plan review was started on June 22, 2005 and was finished the next day. Revised drawings were required. See the plan review report.
|
Routing - PUBLIC WORKS | 6/3/2005 | | 6/6/2005 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 6/3/2005 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/1/2005 | | |
|
|
|
|
Application received | | | 6/1/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/1/2005 | | |
|
|
|
|
Fee Review-notes | 6/1/2005 | 6/1/2005 | | | |
|
|
|
|