Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD05-01476
StatusFinaled
Name DBSI
Site Address 12426 W EXPLORER DR Unit: #100
Project Name 
Customer Number 
ePlanReviewNo
Description
*(DDRS - ADVANTAGE)*(BRIGHTON BUILDING) To remodel an existing 16,555 sq ft first floor office space for a new office tenant. Work to include, selective demolition of nonbearing interior partitions, construction of approximately 160 lf of new interior partitions to create offce spaces, installation of new lighting in these new office areas with dual-level switching, Miscelaneous related finishes. NOTE: This building is fully fire sprinklered any alterations to the sprinkler system WILL require a separate fire sprinkler permit and shall be installed per NFPA #13 as regulated by the fire department. (rmh)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  1/12/2006 DONE
Left voice message for Kristi regarding this permit, there is no MEC permit required but has a value and big difference in ELE final values///1/12/06 @ 9:25am BAS
Case Summary (BLD)  1/10/2006 DONE
Second Notice BLD9/15/20059/15/200512/6/2005 DONE
First Notice has not been responded to.
First Notice 7/25/20059/15/2005 DONE
Permanent occupancy  7/25/2005 DONE
Perm. Occ. Cert. # 10669 issued 7-25-05 to DDRS - Advantage on the 1st floor of the Brighton Bldg.
FIRE-Final Inspection7/18/20057/18/20057/18/2005PPASS
DetailsTroy Cobbley
Life safety finaled
Permanent Occupancy 7/18/20057/18/2005 DONE
Details
BLD-Final7/15/20057/15/20057/15/2005PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/15/2005 at 7:53:47 AM. Contact: ###-####. Ok for perm occ when fire has passed.
FIRE-Final Inspection7/15/20057/15/20057/15/2005PPART
DetailsTroy Cobbley
A temporary occupancy was given until three emergency lights have been added as discussed. One goes into the breakroom and two in the east open office
FIRE-Final Inspection7/15/20057/15/20057/15/2005AFAIL
DetailsTroy Cobbley
Final fire sprinkler permit, repair exit signs and emergency lights. Additional devices may be required. I need to verify wether door mags will be an issue.
BLD-Framing/Rough-in7/12/20057/13/20057/13/2005APASS
DetailsJim Sly
###-#### - kevin Note: drop ceiling
grid OK.....asked for spacer bars....look at final.
FIRE-Final Inspection7/12/20057/12/20057/12/2005PCANC
DetailsTroy Cobbley
Scheduled by a contractor via Hello! on 7/12/2005 at 8:51:51 AM.
kevin Miller made mistake inspection
BLD-Framing/Rough-in6/21/20056/22/20056/22/2005APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/21/2005 at 9:27:15 PM. Contact: ###-####.
Issue PAID IN FULL permit  6/9/2005 DONE
Inspection Record Card- Bld  6/8/2005 DONE
Permit Ready to Issue  6/8/2005 DONE
Print Occupancy Form  6/8/2005 DONE
Telephone call  6/8/2005 DONE
lft vm with shane hotchkiss ###-#### that permit and fees are ready to be picked up
Plan assigned to (R_H)6/3/20056/3/20056/7/2005 PASS
6/7/2005 09:48:40 RMH - activity updated through activity BLDA022 from case BLD05-01476.
Routing - PLAN CHECK6/3/2005 6/7/2005 PASS
Case Summary (BLD)  6/7/2005 DONE
Routing - FIRE6/7/2005 6/7/2005 PASS
Field Verify by fire department inspector.
PLANS/APPL TAKEN TO FRONT DESK  6/7/2005 DONE
1st review completed  6/7/2005 PASS
Application received  6/3/2005  
Plans ACCEPTED BY PLAN TECH  6/3/2005  
Recd Pcfee & Taken To Pln CK  6/3/2005 DONE
Third Notice BLD12/6/200512/6/2005   
Second Notice has not been responded to.
Fee Review-notes6/3/20056/3/2005