Fee Review-notes | 6/3/2005 | 6/3/2005 | 3/14/2007 | | DONE |
|
|
|
|
Third Notice BLD | 1/8/2007 | 1/8/2007 | 3/1/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Telephone call | | | 2/7/2007 | | DONE |
|
|
|
tlk to bryan of JL hardy concerning the differences of the final proj value - it should be 197,946
|
Second Notice BLD | 9/25/2006 | 9/25/2006 | 1/8/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 8/3/2006 | 8/3/2006 | 9/25/2006 | | DONE |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 8/3/2006 | 8/3/2006 | 8/3/2006 | | CANC |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 8/3/2006 | 8/3/2006 | 8/3/2006 | A | PASS |
Mike Jordan
|
|
|
ok for perm occ.
|
BLD-Aging Inspection | 5/12/2006 | 5/12/2006 | 5/16/2006 | | PASS |
Troy Cobbley
|
|
|
Fire life safety ok to final. Fire alarm permit has been finaled.
|
Permanent Occupancy | | 11/30/2005 | 11/30/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 10/20/2005 | 10/28/2005 | 10/28/2005 | A | FAIL |
Troy Cobbley
|
|
|
Fire alarm was not ready
|
FIRE-Conference | 10/20/2005 | 10/21/2005 | 10/23/2005 | P | NR |
Troy Cobbley
|
|
|
Fire alarm permit needs finaled. Per Ralph with Alarmco the work will be done next week and the inspection called in.
|
Temporary occupancy | | | 9/15/2005 | | DONE |
|
|
|
Temp. Occ. Cert. #5266 issued 9-1-05 to Dollar Tree.
|
Telephone call | | | 9/9/2005 | | DONE |
|
|
|
ON HOLD - I have not received FA plans to connect the duct detector (s) (Corrinne, Alarmco states there is one!). I had talked with her on the 26th of August, she said there were new detectors being installed they would have to monitor. I told her NOT to connect them to the system without the FA permit, she said no problem and they were on top of it, working on the submittals.
|
BLD-Final | 8/29/2005 | 8/29/2005 | 8/29/2005 | P | PART |
Jim Sly
|
|
|
bob-- cell ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK for Temp......OK to final for Perm when Fire finals for Perm. C/N Obtain Perm Occ status within 90 days of this notice.
|
BLD-Final | 8/26/2005 | 8/26/2005 | 8/29/2005 | P | NR |
Jim Sly
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Final Inspection | 8/26/2005 | 8/26/2005 | 8/26/2005 | P | PART |
Forrest France
|
|
|
Temporary occupancy approved with Sam Rogers permission pending the installation of HVAC duct smoke detectors.
|
BLD-Final | 8/25/2005 | 8/26/2005 | 8/26/2005 | A | NR |
Jim Sly
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Need Fire
|
FIRE-Final Inspection | 8/24/2005 | 8/25/2005 | 8/25/2005 | P | FAIL |
Forrest France
|
|
|
Need to repair emergency discharge light at back exit, need to mount the two fire extinguishers provided for the sales floor, need to install remaining ceiling tile and sprinkler escutcheons, provide fire alarm permit and duct smoke detectors.
|
FIRE-Final Inspection | 8/16/2005 | 8/17/2005 | 8/17/2005 | A | FAIL |
Troy Cobbley
|
|
|
Inspection was for insulation being re-attached to the deck since it was previously laying on the sprinkler piping. The insulation over the sales floor has been repaired but over the restrooms and offices there are still problems. Ceiling is ok to be installed but office area/restroom will need to be spot checked at the building final.
|
BLD-Framing/Rough-in | 8/16/2005 | 8/17/2005 | 8/17/2005 | A | PART |
Jim Sly
|
|
|
ceiling grid///tom; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 8/2/2005 | 8/3/2005 | 8/3/2005 | A | PART |
Jim Sly
|
|
|
tom; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa 2 footings at N wall OK......Talked with Eng..... Greg No special insp req.
|
BLD-Framing/Rough-in | 7/25/2005 | 7/26/2005 | 7/26/2005 | A | PART |
Mike Jordan
|
|
|
###-#### Tom \\metal framing insp.
|
Issue PAID IN FULL permit | | | 7/25/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/21/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/21/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/21/2005 | | DONE |
|
|
|
|
Telephone call | | | 7/21/2005 | | DONE |
|
|
|
called told Dorothy permit is ready, fees and need RP
|
Routing - PLAN CHECK | 7/1/2005 | | 7/20/2005 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
Plan assigned to (CJW) | 6/8/2005 | | 7/20/2005 | | PASS |
|
|
|
7/20/2005 11:48:51 CJW - activity updated through activity BLDA022 from case BLD05-01484.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/20/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/15/2005 | | |
|
|
|
Received (3) copies of sheet CS1, D1, A1-A5, S1, S2, MP1-MP4 and E1-E7. Also received (1) set of supporting calcs. Routed to Carl W.
|
1st review completed | | | 7/1/2005 | | FAIL |
|
|
|
Failed plan check.
|
Routing - FIRE | 6/27/2005 | | 7/1/2005 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 6/28/2005 | | DONE |
|
|
|
Interior nonstructural demoliton permit prepared (BLD05-01748).
|
Routing - PLAN CHECK | 6/14/2005 | | 6/27/2005 | | FAIL |
|
|
|
The IBC plan review was started on June 24, 2005 and was finished on June 27, 2005. Revised drawings were required. See the plan review report.
|
Routing - PLANNING | 6/9/2005 | | 6/14/2005 | | PASS |
|
|
|
Approved per Building Permit Plans. Signage not included; requires separate permit.
|
Routing - Erosion and Sediment | 6/8/2005 | | 6/9/2005 | | PASS |
|
|
|
ESC waiver request approved with attached conditions.
|
Routing - PUBLIC WORKS | 6/8/2005 | | 6/8/2005 | | PASS |
|
|
|
|
Application received | | | 6/3/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/3/2005 | | |
|
|
|
|