(DOLLAR TREE) This building is fire sprinklered for building area increase. To remodel an existing 14,772 square foot tenant space for a new retail sales tenant. Work is to include interior nonbearing walls, landings and ramps at 2 exterior doors, a 13.33 foot long opening in an existing 18 foot long concrete tilt-up wall panel, new steel columns to strengthen the altered concrete wall panel, new concrete footings to deal with the redistribution of gravity loads in the altered concrete wall panel, alterations to existing restrooms to make them accessible to the disabled, and interior finishes. The work shall comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/3/20056/3/20053/14/2007 DONE
Third Notice BLD1/8/20071/8/20073/1/2007 DONE
Second Notice has not been responded to.
Telephone call  2/7/2007 DONE
tlk to bryan of JL hardy concerning the differences of the final proj value - it should be 197,946
Second Notice BLD9/25/20069/25/20061/8/2007 DONE
First Notice has not been responded to.
First Notice8/3/20068/3/20069/25/2006 DONE
DetailsMike Jordan
BLD-Aging Inspection8/3/20068/3/20068/3/2006 CANC
DetailsMike Jordan
DOC - Permit Finaled8/3/20068/3/20068/3/2006APASS
DetailsMike Jordan
ok for perm occ.
BLD-Aging Inspection5/12/20065/12/20065/16/2006 PASS
DetailsTroy Cobbley
Fire life safety ok to final. Fire alarm permit has been finaled.
Permanent Occupancy 11/30/200511/30/2005 DONE
Details
FIRE-Final Inspection10/20/200510/28/200510/28/2005AFAIL
DetailsTroy Cobbley
Fire alarm was not ready
FIRE-Conference10/20/200510/21/200510/23/2005PNR
DetailsTroy Cobbley
Fire alarm permit needs finaled. Per Ralph with Alarmco the work will be done next week and the inspection called in.
Temporary occupancy  9/15/2005 DONE
Temp. Occ. Cert. #5266 issued 9-1-05 to Dollar Tree.
Telephone call  9/9/2005 DONE
ON HOLD - I have not received FA plans to connect the duct detector (s) (Corrinne, Alarmco states there is one!). I had talked with her on the 26th of August, she said there were new detectors being installed they would have to monitor. I told her NOT to connect them to the system without the FA permit, she said no problem and they were on top of it, working on the submittals.
BLD-Final8/29/20058/29/20058/29/2005PPART
DetailsJim Sly
bob-- cell ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
OK for Temp......OK to final for Perm when Fire finals for Perm. C/N Obtain Perm Occ status within 90 days of this notice.
BLD-Final8/26/20058/26/20058/29/2005PNR
DetailsJim Sly
bob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
FIRE-Final Inspection8/26/20058/26/20058/26/2005PPART
DetailsForrest France
Temporary occupancy approved with Sam Rogers permission pending the installation of HVAC duct smoke detectors.
BLD-Final8/25/20058/26/20058/26/2005ANR
DetailsJim Sly
bob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
Need Fire
FIRE-Final Inspection8/24/20058/25/20058/25/2005PFAIL
DetailsForrest France
Need to repair emergency discharge light at back exit, need to mount the two fire extinguishers provided for the sales floor, need to install remaining ceiling tile and sprinkler escutcheons, provide fire alarm permit and duct smoke detectors.
FIRE-Final Inspection8/16/20058/17/20058/17/2005AFAIL
DetailsTroy Cobbley
Inspection was for insulation being re-attached to the deck since it was previously laying on the sprinkler piping. The insulation over the sales floor has been repaired but over the restrooms and offices there are still problems. Ceiling is ok to be installed but office area/restroom will need to be spot checked at the building final.
BLD-Framing/Rough-in8/16/20058/17/20058/17/2005APART
DetailsJim Sly
ceiling grid///tom; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Footing8/2/20058/3/20058/3/2005APART
DetailsJim Sly
tom; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
2 footings at N wall OK......Talked with Eng..... Greg No special insp req.
BLD-Framing/Rough-in7/25/20057/26/20057/26/2005APART
DetailsMike Jordan
###-#### Tom \\metal framing insp.
Issue PAID IN FULL permit  7/25/2005 DONE
Inspection Record Card- Bld  7/21/2005 DONE
Print Occupancy Form  7/21/2005 DONE
Permit Ready to Issue  7/21/2005 DONE
Telephone call  7/21/2005 DONE
called told Dorothy permit is ready, fees and need RP
Routing - PLAN CHECK7/1/2005 7/20/2005 PASS
Drawings approved after resubmittal review.
Plan assigned to (CJW)6/8/2005 7/20/2005 PASS
7/20/2005 11:48:51 CJW - activity updated through activity BLDA022 from case BLD05-01484.
PLANS/APPL TAKEN TO FRONT DESK  7/20/2005 DONE
Plan resubmittals received  7/15/2005  
Received (3) copies of sheet CS1, D1, A1-A5, S1, S2, MP1-MP4 and E1-E7. Also received (1) set of supporting calcs. Routed to Carl W.
1st review completed  7/1/2005 FAIL
Failed plan check.
Routing - FIRE6/27/2005 7/1/2005 PASS
Plan Reviewer's activity  6/28/2005 DONE
Interior nonstructural demoliton permit prepared (BLD05-01748).
Routing - PLAN CHECK6/14/2005 6/27/2005 FAIL
The IBC plan review was started on June 24, 2005 and was finished on June 27, 2005. Revised drawings were required. See the plan review report.
Routing - PLANNING6/9/2005 6/14/2005 PASS
Approved per Building Permit Plans. Signage not included; requires separate permit.
Routing - Erosion and Sediment6/8/2005 6/9/2005 PASS
ESC waiver request approved with attached conditions.
Routing - PUBLIC WORKS6/8/2005 6/8/2005 PASS
Application received  6/3/2005  
Recd Pcfee & Taken To Pln CK  6/3/2005