Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD05-01515
StatusFinaled
Name HEWLETT-PACKARD CO
Site Address 11311 W CHINDEN BLVD
Project NameHP #3 CAFETERIA
Customer Number 
ePlanReviewNo
Description
(HEWLETT PACKARD BLDG #3)(CAFETERIA CEILING UPGRADE) To replace approximately 13,318 sq. ft. of 1-hour fire rated gyp board ceiling system with new 1-hour Donn DXL suspended ceiling grid system with 2' x 2' Eclipse Climaplus Firecode ceilng panels suspended between the existing 1-hour coved ceiling soffit pattern. To perform selective ceiling demolition; add reinforcement support for existing coved soffit; install ceiling grid system, relamp electrical fixtures and modify sprinkler system within new ceiling per NFPA 13 as regulated by the fire department. (drs)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/11/2011  
Third Notice BLD3/1/20063/1/20064/4/2006 DONE
Second Notice has not been responded to.
Second Notice BLD2/3/20062/3/20063/1/2006 DONE
First Notice has not been responded to.
First Notice1/10/20061/10/20062/3/2006 DONE
DetailsJim Sly
BLD-Final1/9/20061/9/20061/10/2006PPASS
DetailsJim Sly
darrin; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
C/C issued
FIRE-Final Inspection1/9/20061/9/20061/9/2006PPASS
DetailsTroy Cobbley
Life safety finaled
DOC - Permit Finaled1/10/20061/9/20061/9/2006PPASS
DetailsJim Sly
BLD-Framing/Rough-in12/12/200512/13/200512/13/2005APASS
DetailsJim Sly
ceiling grid and framing insp//darren; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in11/23/200511/23/200511/23/2005PPART
DetailsJim Sly
darin Note: also ceiling grid; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Ceiling next to last row of ceiling sections to the East OK
BLD-Framing/Rough-in11/2/200511/3/200511/3/2005APART
DetailsJim Sly
darren; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
Frame OK at gridl 21-22-23
BLD-Framing/Rough-in8/25/20058/26/20058/26/2005APART
DetailsJim Sly
also a ceiling grid inspection please////darren; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Ceiling section C-4 to C-5 North side OK
BLD-Framing/Rough-in8/1/20058/2/20058/2/2005APART
DetailsJim Sly
darwin Note: also ceiling grid; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Quads 9 thru 16 as noted on plans OK.
Override - Parcel Holds1/1/19001/1/19008/1/2005  
BLD-Framing/Rough-in7/6/20057/7/20057/7/2005PPART
DetailsJim Sly
dave; Phone #: ###-#### Internet Inspection Request from: Barbara Moore West 1/4th of Cafeteria OK . Asked Contr to furnish listing for ceiling/grid, Verification that HVAC openings in ceiling are dampered, 1hr rated and operable. Need to "tent" speakers....double layer rock.
Inspection Record Card- Bld  6/28/2005 DONE
Permit Ready to Issue  6/28/2005  
Telephone call  6/28/2005 DONE
tlk to jay shatton ###-#### that permit and fees are ready to be picked up
Issue PAID IN FULL permit  6/28/2005 DONE
Plan assigned to (DRS)6/13/2005 6/27/2005 PASS
6/27/2005 15:30:14 DRS - activity updated through activity BLDA022 from case BLD05-01515.
Routing - FIRE6/20/2005 6/27/2005 PASS
review comments faxed to architect.
1st review completed  6/27/2005 PASS
Routing - PLAN CHECK6/27/2005 6/27/2005 PASS
To permit desk.
PLANS/APPL TAKEN TO FRONT DESK  6/27/2005 PASS
Telephone call  6/20/2005 DONE
Called HC Company to see what the electrical value was for. Dan Hayes said it was for re-lighting, no new fixture's in new suspended ceiling.
Routing - PLAN CHECK6/13/2005 6/20/2005 PEND
No resubmittals required. Routing to fire code analyst for review.
Plans ACCEPTED BY PLAN TECH  6/8/2005  
Application received  6/6/2005  
Recd Pcfee & Taken To Pln CK  6/6/2005 DONE
Fee Review-notes6/6/20056/6/2005