(F) Reprint permit | | | 12/11/2007 | | |
|
|
|
|
BLD-Framing/Rough-in | 11/1/2005 | 11/2/2005 | 11/2/2005 | A | PASS |
Mike Jordan
|
|
|
joan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 9/19/2005 | 9/20/2005 | 9/20/2005 | A | PASS |
Mike Jordan
|
|
|
garage//joan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Noted that straps needed at top plates.
|
BLD-Footing | 9/12/2005 | 9/13/2005 | 9/14/2005 | P | PART |
Dave Hannah
|
|
|
joan ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to pour ftgs for front porch
|
BLD-Conference | 9/12/2005 | 9/13/2005 | 9/14/2005 | P | DONE |
Dave Hannah
|
|
|
joan ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Footing | 9/9/2005 | 9/12/2005 | 9/12/2005 | P | CANC |
Jim Sly
|
|
|
joan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Inspection cancelled from web by: Marsha Smylie
|
BLD-Conference | 9/9/2005 | 9/12/2005 | 9/12/2005 | P | CANC |
Jim Sly
|
|
|
joan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Inspection cancelled from web by: Marsha Smylie
|
BLD-Foundation | 8/31/2005 | 9/1/2005 | 9/1/2005 | A | FAIL |
Mike Jordan
|
|
|
joan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Existing electrical must be removed out of footing. Footing not wide enough. thermal break will also be required.
|
Case Summary (BLD) | | | 9/1/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/1/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/1/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/1/2005 | | DONE |
|
|
|
|
BLD-Foundation | 8/30/2005 | 8/31/2005 | 8/31/2005 | P | NR |
Mike Jordan
|
|
|
joan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Homeowner needs to modify permit for additional work.
|
BLD-Conference | 8/22/2005 | 8/23/2005 | 8/23/2005 | A | PART |
Jim Sly
|
|
|
after 9??joan ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Conf with Joan and Framer. Talked about new roof structure over existing house (not on appr plan) Advised to take orig plan to Plan Check dept, along with revisions, and pay additional fees. Stressed importance of Eng for beams....point loads etc. Questioned (after I left jobsite) does Garage match original plan? Did not look at original plan, but noticed that garage had all new roof trusses. Check out.
|
BLD-Conference | 8/11/2005 | 8/12/2005 | 8/12/2005 | A | DONE |
Mike Jordan
|
|
|
robert weightman; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Concrete | 7/19/2005 | 7/20/2005 | 7/20/2005 | A | PASS |
Mike Jordan
|
|
|
JOAN NOTE: NOON PLEASE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 7/18/2005 | 7/19/2005 | 7/19/2005 | A | PASS |
Mike Jordan
|
|
|
joan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Conference | 7/15/2005 | 7/18/2005 | 7/18/2005 | A | CANC |
Mike Jordan
|
|
|
joan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
Application received | | | 6/7/2005 | | |
|
|
|
|
Plan assigned to (PEP) | 6/7/2005 | | 6/7/2005 | | PASS |
|
|
|
6/7/2005 14:52:23 PEP - activity updated through activity BLDA022 from case BLD05-01527.
|
Case Summary (BLD) | | | 6/7/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/7/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/7/2005 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/7/2005 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 6/7/2005 | | DONE |
|
|
|
|