Case Summary (BLD) | | | 9/24/2012 | | DONE |
|
|
|
|
BLD-Final | 5/10/2006 | 5/10/2006 | 5/10/2006 | P | CANC |
Mike Jordan
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Final | 5/9/2006 | 5/10/2006 | 5/10/2006 | A | PASS |
Mike Jordan
|
|
|
randy Note: please call for access for garage; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles.
|
DOC - Permit Finaled | 5/10/2006 | 5/10/2006 | 5/10/2006 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 2/7/2006 | 2/8/2006 | 2/8/2006 | A | PASS |
Tony Young
|
|
|
Randy; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Conference | 2/3/2006 | 2/6/2006 | 2/6/2006 | A | DONE |
Mike Jordan
|
|
|
Randy; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Met with contractor and truss engineer on site with proper truss package.
|
BLD-Framing/Rough-in | 2/3/2006 | 2/3/2006 | 2/3/2006 | P | NR |
Mike Jordan
|
|
|
Randy; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Framing/Rough-in | 1/17/2006 | 1/18/2006 | 1/18/2006 | A | FAIL |
Mike Jordan
|
|
|
RANDY; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Still nedds to provide truss engineering and install lateral bracing at overbuild areas. ok to insulate.
|
BLD-Framing/Rough-in | 1/11/2006 | 1/12/2006 | 1/11/2006 | A | CANC |
Mike Jordan
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Inspection cancelled from web by: Barbara Moore
|
BLD-Framing/Rough-in | 1/11/2006 | 1/11/2006 | 1/11/2006 | P | CANC |
Mike Jordan
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 1/4/2006 | 1/5/2006 | 1/5/2006 | P | FAIL |
Mike Jordan
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Needs to provide complete set of truss enginering. Add lateral bracing at over build areas, complete nailing of simpson hangars. c/n posted.
|
BLD-Footing | 8/22/2005 | 8/23/2005 | 8/23/2005 | A | PART |
Tom Arcoraci
|
|
|
late am as possible///scott; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa wip pins located ok
|
BLD-Footing | 8/18/2005 | 8/19/2005 | 8/19/2005 | A | CANC |
Tom Arcoraci
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa//cancelled per Mark 8/18/05 4:42pm
|
BLD-Footing | 8/17/2005 | 8/18/2005 | 8/18/2005 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/17/2005 at 4:11:45 PM.
|
Issue PAID IN FULL permit | | | 8/16/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/12/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/12/2005 | | DONE |
|
|
|
|
Telephone call | | | 7/12/2005 | | DONE |
|
|
|
lft vm with crestwood cons ###-#### that permit and fees are ready to be picked up
|
Plan assigned to (SRZ) | 7/5/2005 | 7/5/2005 | 7/11/2005 | | PASS |
|
|
|
7/11/2005 15:18:43 SRZ - activity updated through activity BLDA022 from case BLD05-01532.
|
Case Summary (BLD) | | | 7/11/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/11/2005 | | DONE |
|
|
|
ONE SET RED-LINED
|
Routing - PLAN CHECK | 6/14/2005 | | 7/11/2005 | | PASS |
|
|
|
|
Plan assigned to (SAM) | 6/8/2005 | 6/8/2005 | 7/5/2005 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 7/5/2005 | | PASS |
|
|
|
Pending Tall Wall Engineering at front Entry, Cross section sheet (Wall Section) and floor joist calculation over family room. (SRZ)
|
Routing - PUBLIC WORKS | 6/13/2005 | | 6/14/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 6/8/2005 | | 6/13/2005 | | PASS |
|
|
|
reviewed Monday 6/13, approved site plan as noted. eeg.
|
Application received | | | 6/8/2005 | | |
|
|
|
|