Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-01536
StatusFinaled
Name COREY BARTON HOMES
Site Address 3518 E HAND CART LN
Project Name 
Customer Number 
ePlanReviewNo
Description
To build a new 2068s.f. 2-story 4-bedroom single family dwelling with 910s.f. on the main level, 1158s.f. on the upper level that includes a 315s.f. bonus room over the 681s.f. attached 3-car garage. "THE PERMIT HOLDER IS RESPONSIBLE TO COMPLY WITH CURRENT WALL BRACING REQUIREMENTS AS ADOPTED BY BOISE CITY" R-1C setbacks ok per eeg. All per the approved plans as marked, REScheck and plan review notes. PC# 565 pep
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/6/200510/6/200510/6/2005PPASS
DetailsJim Storey
todd; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
DOC - Permit Finaled10/6/200510/6/200510/6/2005PPASS
DetailsJim Storey
BLD-Framing/Rough-in9/7/20059/7/20059/7/2005APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/7/2005 at 5:46:07 AM. Contact: ###-####.
BLD-Framing/Rough-in9/2/20059/2/20059/2/2005PPASS
DetailsJim Storey
TODD; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in9/1/20059/1/20059/1/2005PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/1/2005 at 6:03:09 AM.
BLD-Footing8/11/20058/12/20058/12/2005APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/11/2005 at 4:37:03 PM. Contact: ###-####.
Issue PAID IN FULL permit  8/3/2005 DONE
Telephone call  7/21/2005 DONE
e-mailed that permit is ready
Permit Ready to Issue  7/20/2005  
Inspection Record Card- Bld  7/20/2005 DONE
Plan assigned to (SAM)6/8/20056/8/20057/19/2005 PASS
7/19/2005 10:55:08 PEP - activity updated through activity BLDA022 from case BLD05-01536.
Routing - PLAN CHECK7/5/2005 7/19/2005 PASS
Plan assigned to (PEP)7/19/2005 7/19/2005 PASS
7/19/2005 10:55:08 PEP - activity updated through activity BLDA022 from case BLD05-01536.
Case Summary (BLD)  7/19/2005  
PLANS/APPL TAKEN TO FRONT DESK  7/19/2005 DONE
Routing - PUBLIC WORKS7/1/2005 7/5/2005 PASS
Routing - PLANNING6/30/2005 6/30/2005 PASS
driveway must clear vision triangle - 40' from intersection of pavement. Shift footprint as required but not beyond minimum setback. Site plan approved as noted. eeg.
Application received  6/8/2005  
Routing - PLANNING6/8/2005   FAIL
reviewed Monday 6/13/05 - driveway needs to occur 50' from pavement intersection of street. Able to shift footprint to 5' setback if approved by applicant - left message. eeg