Third Notice BLD | 3/1/2006 | 3/1/2006 | 11/9/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Telephone call | | | 4/10/2007 | | DONE |
|
|
|
Call to Jordan _Wilcomb, lft msg for Russ to call back re cert of FV
|
Second Notice BLD | 2/3/2006 | 2/3/2006 | 3/1/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 1/17/2006 | 2/3/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 1/17/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 10870 issued 1-17-06 to Dr. Brett Comstock.
|
BLD-Final | 12/30/2005 | 12/30/2005 | 12/30/2005 | P | PASS |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for perm occ
|
Permanent Occupancy | | 12/30/2005 | 12/30/2005 | | DONE |
|
|
|
|
BLD-Final | 12/23/2005 | 12/23/2005 | 12/23/2005 | P | PASS |
Forrest France
|
|
|
c/n items are complete, okay for final
|
BLD-Final | 10/24/2005 | 10/25/2005 | 10/25/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/24/2005 at 11:25:42 AM. Contact: ###-####. ok for temp occ needs plumb and elec to go final need to install all signage and walk project one more time
|
FIRE-Final Inspection | 10/24/2005 | 10/24/2005 | 10/25/2005 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
Temporary occupancy | | | 10/25/2005 | | DONE |
|
|
|
Temp. Occ. Cert. #5293 issued 10-25-05 to Dr. Brett Comstock.
|
FIRE-Final Inspection | 10/21/2005 | 10/24/2005 | 10/24/2005 | A | FAIL |
Troy Cobbley
|
|
|
Fire alarm permit needs finaling. Life safety is ok to final when this is done.
|
BLD-Conference | 10/3/2005 | 10/4/2005 | 10/5/2005 | A | DONE |
Dave Hannah
|
|
|
on ceilings on 3rd floor-- dave-- call 1st before insp chris ###-####; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 8/15/2005 | 8/16/2005 | 8/17/2005 | A | PART |
Dave Hannah
|
|
|
mike ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to one side still need to look at plumbing pens
|
Issue PAID IN FULL permit | | | 7/18/2005 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 6/28/2005 | 6/28/2005 | 7/15/2005 | | PASS |
|
|
|
7/15/2005 09:01:53 MLO - activity updated through activity BLDA022 from case BLD05-01543.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/15/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/15/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/15/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/15/2005 | | DONE |
|
|
|
|
Telephone call | | | 7/15/2005 | | DONE |
|
|
|
Left voice message for cornell that permit is ready & fees///7/15/05 4:05pm BAS
|
Routing - FIRE | 7/11/2005 | | 7/14/2005 | | PASS |
|
|
|
resubmittal acceptable. Revised review comments faxed to architect.
|
Routing - PLAN CHECK | 7/11/2005 | | 7/11/2005 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 7/8/2005 | | |
|
|
|
|
Plan resubmittals received | | | 7/8/2005 | | DONE |
|
|
|
Received 1Transmittal, 1 Letter,1 Hardware set sheet,1 Sargent & 3 Copys of sheets A-1,L-1,P-1,P-3 Taken to Mike O.
|
1st review completed | | | 7/6/2005 | | FAIL |
|
|
|
failed plan check and fire
|
Routing - PLAN CHECK | 7/6/2005 | | 7/6/2005 | | PEND |
|
|
|
|
Routing - FIRE | 6/29/2005 | | 7/6/2005 | | FAIL |
|
|
|
review faxed to architect
|
Routing - PLAN CHECK | 6/28/2005 | | 6/29/2005 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals requested | | | 6/29/2005 | | DONE |
|
|
|
IBC corrections
|
Routing - PLAN CHECK | 6/20/2005 | | 6/28/2005 | | |
|
|
|
assigned to MOTTO
|
Plan assigned to (CJW) | 6/13/2005 | | 6/28/2005 | | DONE |
|
|
|
Reassigned to Mike O.
|
Routing - PLUMBING | 6/15/2005 | | 6/20/2005 | | PASS |
|
|
|
max. horizontal 1 1/2" vent length is 20'. space above the ceiling is a plenum, no plastic piping.
|
Routing - PUBLIC WORKS | 6/13/2005 | | 6/15/2005 | | PASS |
|
|
|
|
Application received | | | 6/8/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/8/2005 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/8/2005 | | |
|
|
|
|
Fee Review-notes | 6/8/2005 | 6/8/2005 | | | |
|
|
|
|