BLD-Final | 1/30/2008 | 1/31/2008 | 1/31/2008 | A | PASS |
Dave Hannah
|
|
|
Troy ###-####
|
DOC - Permit Finaled | 1/31/2008 | 1/31/2008 | 1/31/2008 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Grading Inspection | 1/30/2008 | 1/30/2008 | 1/30/2008 | P | DONE |
Terry Records
|
|
|
Final grading and drainge approved
|
BLD-Final | 12/13/2007 | 12/14/2007 | 12/14/2007 | A | FAIL |
Dave Hannah
|
|
|
troy - please call 1 hr prior to inspection Phone #: ###-####needs hillside final from terry
|
BLD-Grading Inspection | 8/16/2007 | 8/16/2007 | 8/16/2007 | P | DEFR |
Dave Hannah
|
|
|
call 1hr. prior to going\Troy; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung had controctor get a hold of terry records
|
BLD-Energy code compliance | 5/1/2007 | 5/1/2007 | 5/1/2007 | P | PASS |
Dave Hannah
|
|
|
troy - pls call 1 hour prior; Phone #: ###-#### ok to cover
|
BLD-Energy code compliance | 4/30/2007 | 5/1/2007 | 5/1/2007 | A | CANC |
Dave Hannah
|
|
|
troy - pls call 1 hour prior; Phone #: ###-####
|
BLD-Energy code compliance | 4/30/2007 | 4/30/2007 | 4/30/2007 | P | FAIL |
Dave Hannah
|
|
|
troy - pls call 1 hour prior; Phone #: ###-#### Internet Inspection Request from: Victoria Beall not ready
|
BLD-Framing/Rough-in | 4/25/2007 | 4/26/2007 | 4/26/2007 | A | PASS |
Dave Hannah
|
|
|
troy - shear - please call 1 hr prior to inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ext and int shear pass framing also ok walked project with super ok to insulate
|
BLD-Framing/Rough-in | 4/12/2007 | 4/12/2007 | 4/12/2007 | P | FAIL |
Dave Hannah
|
|
|
troy - call 1 hour prior to inspection; Phone #: ###-#### Internet Inspection Request from: Victoria Beall shear needs restapled and holddowns not installed no framing needs sealpackage
|
BLD-Footing | 6/8/2006 | 6/9/2006 | 6/9/2006 | P | PART |
Dave Hannah
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to pour int ftgs
|
BLD-Framing/Rough-in | 11/14/2005 | 11/14/2005 | 11/14/2005 | P | NR |
Dave Hannah
|
|
|
stem wall inspection please///matt; Phone #: ###-####0 Internet Inspection Request from: Barbara Moore
|
BLD-Foundation | 11/14/2005 | 11/14/2005 | 11/14/2005 | P | PASS |
Dave Hannah
|
|
|
stem wall inspection please///matt; Phone #: ###-####0 Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 11/7/2005 | 11/8/2005 | 11/8/2005 | A | PASS |
Dave Hannah
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
PubWorks Subgrade Approval | 11/8/2005 | 11/8/2005 | 11/8/2005 | | PART |
|
|
|
Subgrade for the upper level footings has been approved by the geotechnical engineer. However, unacceptable material had to be overexcavated and this will be filled with concrete rather than be replaced with structural fill.
|
BLD-Footing | 11/7/2005 | 11/7/2005 | 11/7/2005 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/7/2005 at 6:35:04 AM. Contact: ###-####. needs geo tect sign off
|
BLD-Footing | 11/4/2005 | 11/7/2005 | 11/7/2005 | A | CANC |
Jim Storey
|
|
|
ed ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Foundation | 9/27/2005 | 9/28/2005 | 9/28/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/27/2005 at 8:51:22 AM. Contact: ###-####. base ment walls ok to pour
|
BLD-Footing | 9/27/2005 | 9/27/2005 | 9/27/2005 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/27/2005 at 8:50:36 AM. Contact: ###-####. basement ftgs ok to pour
|
PubWorks Subgrade Approval | 9/20/2005 | 9/20/2005 | 9/20/2005 | | PART |
|
|
|
subgrade for basement footing has been approved by the geotechnical engineer.
|
BLD-Foundation | 9/14/2005 | 9/15/2005 | 9/15/2005 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/14/2005 at 7:05:33 AM. Contact: ###-####.
|
BLD-Footing | 9/13/2005 | 9/14/2005 | 9/14/2005 | A | FAIL |
Dave Hannah
|
|
|
jason; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa needs terry recodes sign off
|
Issue PAID IN FULL permit | | | 8/12/2005 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 6/9/2005 | 7/19/2005 | 8/5/2005 | | PASS |
|
|
|
8/5/2005 08:02:24 SAM - activity updated through activity BLDA022 from case BLD05-01559.
|
Routing - PLAN CHECK | 6/28/2005 | | 8/5/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/5/2005 | | DONE |
|
|
|
|
Override - Activity Holds | | | 8/5/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 8/5/2005 | | |
|
|
|
|
Override - Activity Holds | | | 8/5/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/5/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/5/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/5/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Case Summary (BLD) | | | 8/4/2005 | | |
|
|
|
|
Plan resubmittals received | | | 7/27/2005 | | |
|
|
|
Received (2) copies of sheet A-4, A-5 and A-7. Also received (2) copies of beam calcs. Routed to Steve M.
|
Plan Reviewer's activity | | | 7/21/2005 | | DONE |
|
|
|
7/21/05 14:15 I called and talked to Scott with Prestige. He will get me the information I asked for. I need beam sizes, foundation sections marked and engineers stamp. Plans are on hold.
|
Routing - PLANNING | 6/15/2005 | | 6/28/2005 | | PASS |
|
|
|
(Passed review of CZC05-113.) Forwarded to me by front desk planners. Completed blg. rvw, though the accessory blg. I rvd. is not included in these plans.
|
Routing - Erosion and Sediment | 6/28/2005 | | 6/28/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - FIRE | 6/28/2005 | | 6/28/2005 | | PASS |
|
|
|
No fire sprinklers required (Northridge #3)
|
Routing - PUBLIC WORKS GRADING | 6/9/2005 | | 6/15/2005 | | PASS |
|
|
|
Approved as Category 3
|
Routing - PUBLIC WORKS | 6/15/2005 | | 6/15/2005 | | PASS |
|
|
|
|
Application received | | | 6/9/2005 | | |
|
|
|
|