Permit Information
Permit NumberBLD05-01564
StatusFinaled
Name WEST BOISE FAMILY YMCA
Site Address 5959 N DISCOVERY PL
Project NameWEST BOISE FAMILY YMCA
Customer Number 
ePlanReviewNo
Description
(WEST BOISE FAMILY YMCA - SECOND STORY ADDITION) This building is fire sprinklered for building area increase. Interior nonstructural demolition is covered under permit BLD05-02313. To construct a 2,800 square 2nd story addition within an existing recreational facility. After the addition, the 2nd story will have a floor area of about 21,300 square feet and this building will have a total floor area of about 99,300 square feet. The actual volume of this building remains the same. Work is to include concrete footings, steel columns, steel beams, concrete floor, suspended ceilings, aluminum storefront system, and guards. The work shall comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. No zoning review required per Scott Spjute, Zoning & Development Mgr. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD7/7/20067/7/20068/8/2006 DONE
First Notice has not been responded to.
Telephone call  8/8/2006 DONE
Left phone message for Brian with Paige Mechanical that I need to verify value difference///8/8/06 @ 2:22pm BAS
First Notice 6/19/20067/7/2006 DONE
First Notice5/30/20065/30/20067/7/2006 DONE
DetailsJim Sly
Permanent occupancy  6/19/2006 DONE
Perm. Occ. Cert. # 11083 issued 6-19-06 to the Boise Family YMCA (addn.)
FIRE-Final Inspection6/14/20066/14/20066/14/2006 PASS
DetailsTroy Cobbley
Life safety finaled
CHANGE STATUS TO (ISS)  6/14/2006 DONE
BLD-Final5/30/20065/30/20065/30/2006PPASS
DetailsJim Sly
Anna, : ); Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
DOC - Permit Finaled5/30/20065/30/20065/30/2006PPASS
DetailsJim Sly
Permanent Occupancy 5/30/20065/30/2006 DONE
Details
BLD-Final12/15/200512/15/200512/15/2005PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/15/2005 at 9:47:10 AM. Contact: ###-####.
OK for Temp Occ. OK to Perm when Fire Perms. ():
FIRE-Final Inspection12/15/200512/15/200512/15/2005PPART
DetailsTroy Cobbley
A temporary occupancy was given with Dave Hannimen's permission until the fire alarm permit is finaled. The exit sign on the second floor at the top of the west stairs needs repaired and the emergency light on the first floor east exit needs repaired.
Temporary occupancy  12/15/2005 DONE
Temp. Occ. Cert. # 5342 issued 12-15-05 to the Wesst Boise Family YMCA.
BLD-Conference12/12/200512/13/200512/13/2005APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/12/2005 at 12:30:09 PM. Contact: ###-####.
Reviewed letter from Architect justifying and approving 12ga wire at 7' 6" supporting cold rolled steel carrying 2nd floor ceiling.
BLD-Framing/Rough-in12/8/200512/9/200512/9/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/8/2005 at 12:44:16 PM. Contact: ###-####.
BLD-Framing/Rough-in12/7/200512/7/200512/7/2005PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/7/2005 at 9:14:48 AM. Contact: ###-####.
need to complete Firestopping at walls above F R ceiling 2nd Flr.
BLD-Framing/Rough-in11/28/200511/28/200511/28/2005PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/28/2005 at 8:34:57 AM. Contact: ###-####.
1st layer (shaft bd) at 1hr wall 2nd floor near ceiling OK OK to install 2nd layer ....(5/8 rock)
BLD-Framing/Rough-in11/22/200511/23/200511/23/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/22/2005 at 3:27:52 PM. Contact: ###-####.
Insp of 1st layer shaft wall 2nd flr.....Need to firestop and re-inspect.
BLD-Framing/Rough-in11/10/200511/14/200511/14/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/10/2005 at 12:53:58 PM. Contact: ###-####.
Need UL design from Arch for N. wall 2nd floor.
BLD-Framing/Rough-in11/2/200511/3/200511/3/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/2/2005 at 3:43:31 PM. Contact: ###-####.
BLD-Conference11/2/200511/2/200511/2/2005PDONE
DetailsJim Sly
per your request Internet Inspection Request from: Letitia Mesa
Talked to Dan about Stamped letters and details fro Architect for any changes made on the approved plan.
BLD-Framing/Rough-in10/27/200510/28/200510/28/2005PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/27/2005 at 10:11:48 AM. Contact: ###-####.
Framing around all beams 1st floor OK
BLD-Framing/Rough-in10/17/200510/18/200510/18/2005PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/17/2005 at 1:38:57 PM. Contact: ###-####.
Framing around small beams to allow for 2 5/8 rock. OK
BLD-Concrete10/11/200510/12/200510/12/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/11/2005 at 11:36:20 AM. Contact: ###-####.
Dan talked with Engineer.....No special insp req at concrete floor deck.
Plan resubmittals received  9/28/2005  
Received (1) copy of sheet A1 and A8, product spec for Blaze Shield II, copy of 1997 UL directory for product application and copy of UL design from manufacturer's website. Routed to Carl W.
BLD-Conference9/22/20059/22/20059/22/2005PPART
DetailsJim Sly
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Need some one to approve modified listed tested assembly for protection of columns..... referred Architect to Plan check and George Slane.
BLD-Footing8/31/20058/31/20058/31/2005PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/31/2005 at 9:28:15 AM. Contact: ###-####. Talked to Dan..... 3000 psi conc Req. special insp.....Or letter from Eng of record to reduce design strength to 2500
Permit Ready to Issue  8/26/2005 DONE
Inspection Record Card- Bld  8/26/2005 DONE
Print Occupancy Form  8/26/2005 DONE
Telephone call  8/26/2005 DONE
talked to bob howard ###-#### that permit is ready
Issue PAID IN FULL permit  8/26/2005 DONE
Routing - FIRE8/16/2005 8/25/2005 PASS
resubmittal acceptable. Revised review faxed to architect.
Routing - PLAN CHECK8/25/2005 8/25/2005 PASS
Drawings approved after structural resubmittal reviews were completed.
PLANS/APPL TAKEN TO FRONT DESK  8/25/2005 DONE
Plan assigned to (CJW)6/14/2005 8/25/2005 PASS
8/25/2005 15:55:58 CJW - activity updated through activity BLDA022 from case BLD05-01564.
Routing Off Site - STRUCTURAL8/22/2005 8/24/2005 PASS
Called PDQ for pick up

(8-24-05) Drawings approved by Consultant Structural Engineer.
Plan resubmittals received  8/19/2005  
Received (2) copies of combined footing analysis as well as revised details. Routed to Carl W.
Routing - PLAN CHECK7/19/2005 8/16/2005  
Drawings on hold until resubitted drawings are received. (8-16-05) Resubmittal review completed. Results from the structural plan review are pending. Drawings sent to the Fire Department.
Telephone call  8/16/2005 DONE
Called the Architect's representative (Bob Howard). Told him that we were missing the structural analysis of the roof for the new HVAC unit. Told him that drawings would be routed back to Fire and that the resubmitted drawings had been routed to the consultant structural engineer.
Plan resubmittals received  8/16/2005  
Received (2) copies of structural calcs for Roof Analysis. Routed to Carl W.
Plan resubmittals received  8/10/2005  
Received Transmittal ,1 United Water Sheet,2 Structural Calcs, 2 Letters & 3 Copys of sheets A0.00,A0.01,A2.01,A3.11,A3.21,A3.22,A6.01,A9.01,E2.0L,S0.1,S1.01,S2.01,S2.02,S2.03 Taken to Carl W.
Routing - PLAN CHECK7/13/2005 7/19/2005 FAIL
The IBC plan review report was started July 1, 2005. The review was suspended on July 6, 2005 because the expertise of a Consultant Engineer was required. Drawings were sent to the consultant on July 6, 2005. His review was completed on July 15, 2005. Revised drawings and calculations were required. The first IBC plan review was completed on July 19, 2005.
Routing Off Site - STRUCTURAL7/6/2005 7/15/2005 FAIL
Only (2) sets were originally submitted by the applicant. The "Issue" copy is being routed to CH2MHill. We will request an extra copy of the resubmittal in order for us to have both an "Office" and an "Issue" copy.
Plan resubmittals received  7/14/2005  
Received (1) additional full set of plans. Routed to Carl W.
1st review completed  7/13/2005 FAIL
Failed Plan Check and Fire.
Routing - FIRE7/6/2005 7/13/2005 FAIL
Faxed comments to the architect.
Routing - PLAN CHECK6/15/2005 7/6/2005 FAIL
The preliminary IBC plan review was started on July 1, 2005 and was finished on July 6, 2005. Routing was continued while waiting for the review by the Consultant Structural Engineer. See the preliminary plan review report.
Routing - Erosion and Sediment6/14/2005 6/15/2005 PASS
ESC waiver request approved with attached conditions.
Routing - PLANNING6/15/2005 6/15/2005 PASS
Scott Spjute.
Routing - PUBLIC WORKS6/14/2005 6/14/2005 PASS
Application received  6/10/2005  
Recd Pcfee & Taken To Pln CK  6/10/2005  
Plans ACCEPTED BY PLAN TECH  6/10/2005  
Fee Review-notes6/10/20056/10/2005