BLD-Final | 5/8/2006 | 5/8/2006 | 5/9/2006 | P | DONE |
Dave Hannah
|
|
|
call for access; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD-Final | 5/9/2006 | 5/9/2006 | 5/9/2006 | P | PASS |
Dave Hannah
|
|
|
dean; Phone #: ###-#### Note; please call 1/2 hr prior Internet Inspection Request from: Cathy Chiles
|
DOC - Permit Finaled | 5/9/2006 | 5/9/2006 | 5/9/2006 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 5/5/2006 | 5/5/2006 | 5/5/2006 | P | FAIL |
Dave Hannah
|
|
|
keith; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles still needs terrys sign off
|
BLD-Final | 5/4/2006 | 5/4/2006 | 5/5/2006 | P | FAIL |
Dave Hannah
|
|
|
keith; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles still waiting for terrys sign off no inspection done
|
BLD-Grading Inspection | 5/5/2006 | 5/5/2006 | 5/5/2006 | | DONE |
|
|
|
Final grading and drainage complete and approved
|
BLD-Final | 5/3/2006 | 5/4/2006 | 5/4/2006 | A | NR |
Dave Hannah
|
|
|
keith; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs terry recordes sign off
|
BLD-Framing/Rough-in | 1/20/2006 | 1/20/2006 | 1/20/2006 | P | PASS |
Dave Hannah
|
|
|
dean; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Energy code compliance | 1/20/2006 | 1/20/2006 | 1/20/2006 | P | PASS |
Dave Hannah
|
|
|
dean; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 1/18/2006 | 1/19/2006 | 1/19/2006 | A | PASS |
Dave Hannah
|
|
|
dean Note: please call 1/2 hr prior; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 1/17/2006 | 1/17/2006 | 1/17/2006 | P | FAIL |
Dave Hannah
|
|
|
dean; Phone #: ###-#### Internet Inspection Request from: Barbara Moore needs truss engineering and fix for shear stapes
|
BLD-Framing/Rough-in | 12/27/2005 | 12/28/2005 | 12/28/2005 | A | FAIL |
Dave Hannah
|
|
|
SHEAR NAILING\###-#### needs to finish nialing panels per plan and needs engineer to come up with fix for strapes under windows
|
BLD-Footing | 10/26/2005 | 10/27/2005 | 10/27/2005 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/26/2005 at 5:13:43 PM. Contact: ###-####.
|
PubWorks Subgrade Approval | 10/27/2005 | 10/27/2005 | 10/27/2005 | | DONE |
|
|
|
Footing subgrades for the eastern portion of the residence, including the garage, have been approved by the geotechnical engineer.
|
BLD-Other | 10/12/2005 | 10/12/2005 | 10/13/2005 | P | PART |
Dave Hannah
|
|
|
micha - Note: rebar stem wall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles north west walls ok to pour
|
BLD-Footing | 9/30/2005 | 10/3/2005 | 10/3/2005 | A | PART |
Dave Hannah
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore garage and nw corner of house and deck fotgs
|
BLD-Footing | 9/23/2005 | 9/26/2005 | 9/26/2005 | A | PART |
Mike Jordan
|
|
|
micah; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Inspected garage footing only. Nothing else complete. did note sign off from Terry Records.
|
PubWorks Subgrade Approval | 9/23/2005 | 9/23/2005 | 9/23/2005 | | DONE |
|
|
|
Footing subgrade for upper level footings aproved by the geotech
|
BLD-Footing | 9/21/2005 | 9/22/2005 | 9/22/2005 | A | CANC |
Tony Young
|
|
|
mica; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa//called and left voicemessage for Dave Hannah to see if could get insp 9/21 pm,,,, still need soils report
|
BLD-Footing | 9/20/2005 | 9/21/2005 | 9/21/2005 | A | NR |
Tom Arcoraci
|
|
|
mica; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa needs t records ok for footings of garage
|
BLD-Footing | 9/20/2005 | 9/20/2005 | 9/20/2005 | P | PART |
Mike Jordan
|
|
|
###-#### - micha - Note: please before 2:30 pm
|
BLD-Footing | 8/25/2005 | 8/26/2005 | 8/26/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/25/2005 at 11:52:43 AM. Contact: ###-####. ok to pour lower section
|
PubWorks Subgrade Approval | 8/22/2005 | 8/22/2005 | 8/22/2005 | | PART |
|
|
|
Footing subgrade for daylight basement area approved by geotech.
|
Issue PAID IN FULL permit | | | 8/12/2005 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 6/10/2005 | 8/8/2005 | 8/9/2005 | | PASS |
|
|
|
8/9/2005 08:19:49 SAM - activity updated through activity BLDA022 from case BLD05-01565.
|
Routing - PLAN CHECK | 7/14/2005 | | 8/9/2005 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 8/9/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/9/2005 | | DONE |
|
|
|
|
Override - Activity Holds | | | 8/9/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 8/9/2005 | | DONE |
|
|
|
|
Override - Activity Holds | | | 8/9/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/9/2005 | | |
|
|
|
|
Print Occupancy Form | | | 8/9/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/9/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/9/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Routing - FIRE | 7/12/2005 | | 7/14/2005 | | PASS |
|
|
|
No fire sprinkler requirements for this subdivision.
|
Routing - Erosion and Sediment | 7/11/2005 | | 7/12/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING | 6/17/2005 | | 7/11/2005 | | PASS |
|
|
|
resolved fireplace / chimney question and window wells, called applicant 7/11/05. eeg.
|
Routing - PUBLIC WORKS GRADING | 6/10/2005 | | 6/17/2005 | | PASS |
|
|
|
Approved as Category 3
|
Routing - PUBLIC WORKS | 6/17/2005 | | 6/17/2005 | | PASS |
|
|
|
|
Application received | | | 6/10/2005 | | |
|
|
|
|