BLD-Final | 3/3/2006 | 3/3/2006 | 3/3/2006 | P | PASS |
Mike Jordan
|
|
|
brandon; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
DOC - Permit Finaled | 3/3/2006 | 3/3/2006 | 3/3/2006 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 3/1/2006 | 3/2/2006 | 3/2/2006 | P | NR |
Mike Jordan
|
|
|
brandon; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Still needs mech. final. Not yet complete when on site. Also noted personal property in house. Contractor or homeowner will be required to be on site at time of inspection.
|
BLD-Final | 3/1/2006 | 3/1/2006 | 3/1/2006 | P | NR |
Mike Jordan
|
|
|
brandon; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Need mech final prior to bldg final.
|
BLD-Conference | 2/6/2006 | 2/7/2006 | 2/7/2006 | A | PASS |
Tom Arcoraci
|
|
|
harry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa may need eng to determine if deflection of guard rail exceeds max allowed
|
BLD-Framing/Rough-in | 2/2/2006 | 2/2/2006 | 2/2/2006 | P | PASS |
Jim Storey
|
|
|
for detached shop--brandon ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 12/16/2005 | 12/19/2005 | 12/19/2005 | A | PASS |
Jim Sly
|
|
|
BRANDON; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 11/23/2005 | 11/23/2005 | 11/23/2005 | P | PART |
Jim Sly
|
|
|
brandon; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa OK to cover all but garage overhead door header.
|
BLD-Framing/Rough-in | 11/22/2005 | 11/23/2005 | 11/23/2005 | A | FAIL |
Mike Jordan
|
|
|
brandon; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. see posted c/n.
|
BLD-Energy code compliance | 11/22/2005 | 11/23/2005 | 11/23/2005 | A | CANC |
Mike Jordan
|
|
|
brandon; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 11/22/2005 | 11/22/2005 | 11/22/2005 | P | FAIL |
Mike Jordan
|
|
|
###-#### brandon reed. Provide truss engineering.
|
BLD-Framing/Rough-in | 11/21/2005 | 11/21/2005 | 11/21/2005 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Weston Kons. elec. and mech. r.i. insp. failed.
|
BLD-Framing/Rough-in | 11/17/2005 | 11/21/2005 | 11/21/2005 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Weston Kons Inspection cancelled from web by: Weston Kons
|
BLD-Footing | 8/16/2005 | 8/17/2005 | 8/17/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/16/2005 at 5:57:36 PM. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 8/15/2005 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 8/3/2005 | 8/3/2005 | 8/11/2005 | | PASS |
|
|
|
8/11/2005 08:27:29 SRZ - activity updated through activity BLDA022 from case BLD05-01568.
|
Routing - PLAN CHECK | 7/12/2005 | | 8/11/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/11/2005 | | DONE |
|
|
|
ONE SET RED-LINED
|
Inspection Record Card- Bld | | | 8/11/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/11/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/11/2005 | | DONE |
|
|
|
called told Hillary permit is ready and fees
|
Plan assigned to (SAM) | 6/10/2005 | 6/10/2005 | 8/3/2005 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 8/3/2005 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 8/3/2005 | | DONE |
|
|
|
PENDING TALL WALL ENGINEERING FOR THE DETACHED SHOP TALL WALL, AND TRUSS COMPANY INFO. (SRZ)
I received Truss info from Tom Manning w/ Building Components on 8/05/05. (SRZ)
|
Case Summary (BLD) | | | 8/3/2005 | | |
|
|
|
|
Routing - PUBLIC WORKS | 7/12/2005 | | 7/12/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 7/8/2005 | | 7/11/2005 | | PASS |
|
|
|
received revised plans, reviewed Monday 7/11/05. eeg.
|
Plan resubmittals received | | | 7/5/2005 | | |
|
|
|
Received (2) complete sets of plans along with 8.5 x 11 site plan showing relocation of structure on lot. Routed to Evelyn G.
|
Application received | | | 6/10/2005 | | |
|
|
|
|
Routing - PLANNING | 6/13/2005 | | | | FAIL |
|
|
|
hold - driveway to close to intersection, verify accessory shop under 1000 sf. eeg. 6/24 spoke with designer at counter to do over options. eeg.
|