Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-01570
StatusFinaled
Name C W CONSTRUCTION
Site Address 316 S JACKSON
Project Name 
Customer Number 
ePlanReviewNo
Description
To build a new 1229s.f. 2-story single family dwelling with a 430s.f. 2-car garage and 861s.f. of living space on the main level and 861s.f. of living space on the upper level. "The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City." There is a 60s.f. un-covered balcony at the rear and a 70s.f. front entry stair/stoop at the front. R-2 ok per Evelyn Grime and David Abo per ROS05-00009. All per the approved plans as marked REScheck and plan review notes. PC# 666 pep
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/29/20063/30/20063/30/2006APASS
DetailsJim Storey
Brian; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
DOC - Permit Finaled3/30/20063/30/20063/30/2006PPASS
DetailsJim Storey
BLD-Final3/27/20063/27/20063/27/2006PFAIL
DetailsTom Arcoraci
Brian -- call 1st for garage code access; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong cn posted
BLD-Energy code compliance11/28/200511/28/200511/28/2005PPASS
DetailsJim Sly
brian; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in11/21/200511/22/200511/22/2005APASS
DetailsMike Jordan
lon; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Footing9/12/20059/12/20059/12/2005PPASS
DetailsTom Arcoraci
j jones; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Inspection Record Card- Bld  8/30/2005 DONE
Permit Ready to Issue  8/30/2005  
Issue PAID IN FULL permit  8/30/2005 DONE
Plan assigned to (SAM)6/10/20056/10/20058/29/2005 PASS
8/29/2005 16:25:40 PEP - activity updated through activity BLDA022 from case BLD05-01570.
Plan assigned to (PEP)8/25/2005 8/29/2005 PASS
8/29/2005 16:25:40 PEP - activity updated through activity BLDA022 from case BLD05-01570.
Case Summary (BLD)  8/29/2005  
PLANS/APPL TAKEN TO FRONT DESK  8/29/2005 DONE
Routing - PUBLIC WORKS8/8/2005 8/8/2005 PASS
Routing - PLANNING Land Div6/13/2005 8/5/2005 PASS
Routing - PLANNING8/5/2005 8/5/2005 PASS
received recorded parcel sheet and revised site plan to meet setbacks / open space as required. eeg.
Application received  6/10/2005  
Routing - PLANNING6/13/2005   FAIL
6/13/05 verify property lot split
Routing - PLAN CHECK8/8/2005