Permit Information
Permit NumberBLD05-01577
StatusFinaled
Name RON RAMZA INVESTMENT LLC
Site Address 4125 S GEKELER LN
Project NameGarage Town Ph I, Bldgs 1,2&3
Customer Number 
ePlanReviewNo
Description
Self Storage Buildings * Buildings, #1, #2 & #3 for phase I. To construct three noncombustible self storage buildings for use as private storage units and garages for the storage of motor homes, travel trailers, boats and private vehicles. Building #1 is 16,944 sq.ft. and is separate by a three hour fire barrier wall at grid line 12 to reduce fire area below 12,000 sq.ft. Building, 2 is 9648 sq.ft. and is separated from building 3 with a three hour fire barrier wall to reduce fire area below 12,000 sq.ft. Building 3 is 9,648 sq.ft. Building #1 contains a 576 sq.ft office space with restroom and storage area. All construction per the approved plans and attached comment list. REFER TO BLD 05-01031 for the grading permit. MJP DRH 05-0008
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD5/25/20065/25/20066/14/2006 DONE
First Notice has not been responded to.
First Notice 5/15/20065/25/2006 DONE
Print Occupancy Form  5/15/2006  
Permanent occupancy  5/15/2006 DONE
Perm. Occ. Cert. # 11022 issued 5-15-06 to Garage Town.
BLD-Final5/9/20065/9/20065/9/2006PPASS
DetailsJim Storey
shane ; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
Permanent Occupancy 5/9/20065/9/2006 DONE
Details
BLD-Final3/30/20063/31/20063/31/2006PPART
DetailsJim Sly
Shane -- pending fire life safety insp 3-31 AM; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
OK for Temp occ for Blg #1 only. C/N ... Obtain perm occ status within 90 days of this notice. Need all (if any) req final approvals from Special insp agency or Engineer. Need Perm On Plumbing.
FIRE-Final Inspection3/30/20063/31/20063/30/2006APASS
DetailsTroy Cobbley
Life safety finaled
FIRE-Final Inspection3/23/20063/24/20063/24/2006AFAIL
DetailsForrest France
The entrance gates are not installed at this time for verification of required width, functionality, hardware, etc, need to provide an additional building address facing Gekeler street.
BLD-Framing/Rough-in3/20/20063/20/20063/20/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/20/2006 at 9:44:15 AM. Contact: ###-####.
BLD-Framing/Rough-in2/10/20062/13/20062/14/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/10/2006 at 3:10:26 PM. Contact: ###-####.
BLD-Framing/Rough-in2/6/20062/7/20062/7/2006APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/6/2006 at 3:10:36 PM bldg 1. 3 hr ok on ele penatrations need to verify girts and perlin fire stopping at sidewalls and roof. ok to firestop from backside at girts. arch. to supply ul listing for bldg. 2# west end that will work with struc. design.
BLD-Framing/Rough-in1/18/20061/19/20061/19/2006APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/18/2006 at 8:54:15 AM. Contact: ###-####.all but 3 hr fire wall ok need to remove ele pannel form wall and frame to the exterior walls ans roof / putty pads and reinsp required on this wall..
BLD-Aging Inspection1/12/20061/12/20061/12/2006 NR
DetailsJim Storey
no requist for insp.
BLD-Framing/Rough-in11/10/200511/10/200511/10/2005PPART
DetailsJim Storey
freeze wall & rebar -chuck ; Phone #: ###-#### Internet Inspection Request from: Marsha Smyliecovered by si
BLD-Footing11/2/200511/2/200511/2/2005PPASS
DetailsJim Storey
matt - ###-####
BLD-Foundation10/27/200510/31/200510/31/2005APASS
DetailsJim Storey
chuck; Phone #: ###-#### Internet Inspection Request from: Cathy Chilesbldg #2 ok
BLD-Foundation10/19/200510/20/200510/20/2005PPART
DetailsTom Arcoraci
john Note: wall after 12:00; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles partial bld 1 and 3
BLD-Foundation10/18/200510/19/200510/19/2005APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/18/2005 at 2:41:09 PM. bldg.2# center pad ft and walls with peirs ok
BLD-Foundation10/13/200510/14/200510/14/2005APASS
DetailsMike Jordan
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Frost wall on grid D at bldg #1.
BLD-Footing10/13/200510/14/200510/14/2005APART
DetailsMike Jordan
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Interior column pad footings at bldg #1.
BLD-Foundation10/7/200510/10/200510/10/2005APART
DetailsMike Jordan
foundation wall-- john; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. bldg. 1 frost wall at grid A from grids 8 to 16. Column pad footings on grid D (8 total) Column pad footings at bldgs. 2 & 3 at end walls.
BLD-Wall cover9/29/20059/30/20059/30/2005PPASS
DetailsJim Storey
john Note: wall aslo; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing9/29/20059/30/20059/30/2005PPASS
DetailsJim Storey
john Note: wall aslo; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing9/21/20059/22/20059/22/2005APASS
DetailsJim Storey
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing9/16/20059/19/20059/19/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/16/2005 at 10:32:25 AM.
Case Summary (BLD)  9/16/2005  
BLD-Footing9/14/20059/14/20059/14/2005PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/14/2005 at 9:14:43 AM. wip
(F) Reprint permit  9/12/2005  
BLD-Foundation9/9/20059/9/20059/9/2005PPART
DetailsJim Storey
south end 1/3 ok rebar pending si ans sope letter.
Plan assigned to (M_P)6/13/2005 9/9/2005 PASS
9/9/2005 10:41:07 M_P - activity updated through activity BLDA022 from case BLD05-01577.
Routing - PLAN CHECK9/8/2005 9/9/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/9/2005 DONE
Print Pending Permit.LaserJet4  9/9/2005 DONE
Case Summary (BLD)  9/9/2005 DONE
Permit Ready to Issue  9/9/2005  
Inspection Record Card- Bld  9/9/2005  
Print Occupancy Form  9/9/2005  
Issue PAID IN FULL permit  9/9/2005 DONE
Routing - FIRE9/8/2005 9/8/2005 PASS
Plans still not properly revised but approved per "red" annotations of building plan reviewer and attached IFC review comments which have been faxed to the architect.
Routing - PLAN CHECK9/1/2005 9/8/2005 PEND
Waiting for others to approve prior to issuing permit.
Plan resubmittals received  9/6/2005  
Received (3) copies of sheet S-2, S-5, S-7, S-8 and S-9 (2 full size sets and 1 small). Routed to Mike P.
Plan resubmittals received  9/6/2005 DONE
Received 2 Copys of sheet A2.1 Taken to Mike P.
Plan resubmittals received  9/2/2005 DONE
Received over head door information.
Routing - PLAN CHECK8/29/2005 9/1/2005 FAIL
Called architect and Conger Management Group requesting additional information about fire assembly assembly numbers and details, missing plan sheets, cut sheets for overhead door and man doors.
Plan resubmittals received  8/30/2005  
Received (3) copies of sheet T1.0 and A0.1. Routed to Mike P.
Plan resubmittals received  8/30/2005  
Received (4) copies of sheet S-6. Routed to Mike P.
Routing - FIRE8/18/2005 8/29/2005 FAIL
Faxed comments to architect.
Plan resubmittals received  8/24/2005 DONE
Received Transmittal & 2 Copys of sheet A5.0 Taken to Mike P.
Plan resubmittals received  8/19/2005 DONE
Received 1 Transmittal Letter,& 3 Copys of sheets T1.0,A5.0 Taken to Mike P.
Routing - PLAN CHECK8/10/2005 8/18/2005 FAIL
Waitng for a call from architect need additional information prior to approving.
Plan resubmittals received  8/10/2005 DONE
Received Transmittal Letter , & 3 Copys of sheets S-2,S-5,S-6,S-7,S-8,S-9 Per Mike Phillips resubmittals taken to Sara S.
Routing - PLANNING8/4/2005 8/10/2005 PASS
Sarah Schafer

Applicant submitted the required documents today to meet the conditions of approval for DRH05-8. Approved per DRH05-8.
Routing - PLUMBING8/4/2005 8/4/2005 PASS
connect hydrant by office to the hose bib line instead of the r.v. dump line. min. 7.06 sq. in. of venting required. provide drain for the 1" r.p. max 120 deg. hot water to the public lavs, tempering valve or limit stops in faucett. thermol expantion protection required.
Routing - PLAN CHECK7/7/2005 8/4/2005  
Route to plumbing.
Plan resubmittals received  7/29/2005  
Received (2) copies of sheet 1-6, T1.0, A1.0, A2.0, A2.1, E-1, S-1, S1-A, S-1, S-3, S-4, S-1, S-3, S-4, S-1, S-3 and S-4. Also received (2) sets of structural calcs for buildings 1-3. Routed to Mike P.
Plan Reviewer's activity  7/20/2005  
Sent letter to architect not allowing the elimination of a restroom.
1st review completed  7/7/2005 FAIL
failed planning, plumbing, plan check and fire.
Routing - FIRE6/30/2005 7/7/2005 FAIL
review faxed to architect.
Routing - PLAN CHECK6/24/2005 6/30/2005 FAIL
Plan review completed, sent correction report to owner, engineer and contractor requesting additionalinformation be submitted for further review prior to issuing permit.
Routing - PLANNING6/21/2005 6/24/2005 FAIL
Tempra DRH05-00008

Project failed. Staff still needs a phasing plan, revised landscape plan, and revised elevations for Building #1's east elevation facing Gekler.
Routing - PLUMBING6/20/2005 6/21/2005 FAIL
provide a plan showing the locations of the backflow preventors for the office water service and the R.V. dump station. The R.V. dump station will require an R.P. with drainage to an approved indirect waste receptor. design R.V. dump station per attached appendix E, partK. provide plumbing plans showing the above listed items.
Routing - Erosion and Sediment6/20/2005 6/20/2005 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS6/17/2005 6/20/2005 PASS
Routing - PLANNING Land Div6/13/2005 6/17/2005 PASS
Legal parcel in Ada County prior to annexation on 12/30/04.
Plan routing begun/NEW & ADDTN  6/13/2005  
Plans ACCEPTED BY PLAN TECH  6/10/2005  
Application received  6/10/2005  
Recd Pcfee & Taken To Pln CK  6/10/2005 DONE
Third Notice BLD6/14/20066/14/2006   
Second Notice has not been responded to.
Fee Review-notes6/10/20056/10/2005