Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-01604
StatusFinaled
Name ALPINE REAL ESTATE LLP
Site Address 12550 W EXPLORER DR Unit: 200
Project NameALPINE BLDG-2ND FLR
Customer Number 
ePlanReviewNo
Description
(ALPINE REAL ESTATE LLP)(ALPINE BLDG-STE 200) To construct a 6,322 sq.ft. office tenant located on the second floor, in a new shell building per approved plans. The shell & core was permitted under Bld04-02346. Work to include, construction of new interior partitions, installation of suspended ceiling system and related lighting, connect to existing HVAC system and install new ducting and registers, Miscelaneous related interior finishes counters and cabinets. This building is fully fire sprinklered any alterations to the sprinkler system shall be per NFPA #13 as regulated by the fire department. (Rmh)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  4/5/2007  
call to scott rhymes to call back about fv, combined on two certificates of fv.
Third Notice BLD8/18/20068/18/20063/1/2007 DONE
Second Notice has not been responded to.
Second Notice BLD8/2/20068/2/20068/18/2006 DONE
First Notice has not been responded to.
First Notice 7/20/20068/2/2006 DONE
Permanent occupancy  7/18/2006 DONE
Perm. Occ. Cert. # 11136 issued 7-18-06 to Alpine Real Estate, LLP.
Second Notice BLD5/25/20065/25/20066/14/2006 DONE
First Notice has not been responded to.
First Notice5/10/20065/10/20065/25/2006 DONE
DetailsJim Sly
BLD-Final5/10/20065/10/20065/10/2006PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 5/10/2006 at 8:14:37 AM. Contact: ###-####.
C/C issued
DOC - Permit Finaled5/10/20065/10/20065/10/2006PPASS
DetailsJim Sly
Permanent Occupancy 5/10/20065/10/2006 DONE
Details
Permanent Occupancy 5/10/20065/10/2006 DONE
Details
Code Occupancy Approval  5/10/2006  
FIRE-Final Inspection1/12/20061/13/20061/13/2006APASS
DetailsTroy Cobbley
life safety finaled
BLD-Final12/30/20051/3/20061/3/2006APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/30/2005 at 1:10:02 PM. Contact: ###-####.
OK for Temp Occ..........OK for Perm Occ when Fire Perms.
FIRE-Final Inspection12/30/200512/30/200512/30/2005PPART
DetailsTroy Cobbley
A temporary occupancy was given with Dave Hanneman's permission. Items needing addressing are syncing of the horns, mount map at facp, reverify signals (zone 10), and get the resubmitted plans approved.
FIRE-Final Inspection12/29/200512/29/200512/29/2005PFAIL
DetailsTroy Cobbley
Plug sprinkler heads mounted horizontally in the T.I. space. Reinstall the ball drip at the FDC. Certify the backflow preventor. Relocate the bell to the FDC. Provide above ground hydro test papers. Resubmit fire alarm plans showing the flow switch and tamper switch. Test all of the a/v's. Test all of the elevator functions/recall. Test the access controlled egress doors. Provide map at the FACP. Provide printout of the fire alarm signals. Provide minimum 8.3 AH batteries for the FACP. Life safety is ok to final when all of this is done.
BLD-Other12/2/200512/2/200512/2/2005PPASS
DetailsJim Sly
mike Note: ceiling grid; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Grid ok
BLD-Framing/Rough-in10/11/200510/11/200510/11/2005PPASS
DetailsMike Jordan
mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
Issue PAID IN FULL permit  8/11/2005  
Print Occupancy Form  7/13/2005 DONE
Inspection Record Card- Bld  7/13/2005 DONE
Telephone call  7/13/2005 DONE
called left voicemail for wes permit is ready and fees
Permit Ready to Issue  7/13/2005 DONE
Routing - PLAN CHECK7/11/2005 7/12/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/12/2005 DONE
Plan assigned to (R_H)6/15/2005 7/12/2005 PASS
7/12/2005 11:09:52 RMH - activity updated through activity BLDA022 from case BLD05-01604.
Routing - FIRE7/6/2005 7/11/2005 PASS
1st review completed  7/11/2005 PASS
Routing - PLAN CHECK6/16/2005 7/6/2005 PEND
No corrections required by the building department review, Routed plans to the fire department on 7/06/05.
Case Summary (BLD)  7/6/2005 DONE
Routing - PUBLIC WORKS6/15/2005 6/16/2005 PASS
Plans ACCEPTED BY PLAN TECH  6/15/2005  
Recd Pcfee & Taken To Pln CK  6/14/2005  
Application received  6/14/2005  
Third Notice BLD6/14/20066/14/2006   
Second Notice has not been responded to.
Fee Review-notes6/14/20056/14/2005