Description
(DIRECT TV - 1ST STORY) This building is fire sprinklered for unlimited building area (as defined by the 1994 UBC). To remodel two areas (4,017 square feet and 1,213 square feet) within an existing 151,365 square foot, 2 story building. Work is to include interior nonbearing walls, interior doors, and an interior 20 minute door in a 1-hr corridor wall. New work shall comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system shall be maintained in compliance with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD12/30/200512/30/20051/4/2006 DONE
First Notice has not been responded to.
First Notice 12/16/200512/30/2005 DONE
BLD-Final12/15/200512/16/200512/16/2005APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/15/2005 at 12:33:02 PM. Contact: ###-####.
C/C issued
DOC - Permit Finaled12/16/200512/16/200512/16/2005PPASS
DetailsJim Sly
FIRE-Final Inspection11/30/200512/2/200512/2/2005APASS
DetailsForrest France
Fire life safety is satisfactory.
FIRE-Final Inspection9/28/20059/28/20059/28/2005PFAIL
DetailsTroy Cobbley
Provide approved door hardware on the conference room door and provide additional sprinkler coverage at the same door. See approved plans for exact location.
BLD-Conference9/16/20059/19/20059/19/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/16/2005 at 5:44:09 PM. Contact: ###-####.
Met with Joel.....He may need plan modification for changes to plan.
Issue PAID IN FULL permit  8/1/2005 DONE
Plan assigned to (CJW)6/17/2005 7/20/2005 PASS
7/20/2005 08:14:48 CJW - activity updated through activity BLDA022 from case BLD05-01623.
Routing - FIRE7/14/2005 7/20/2005 PASS
1st review completed  7/20/2005 PASS
Routing - PLAN CHECK7/20/2005 7/20/2005 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/20/2005 DONE
Inspection Record Card- Bld  7/20/2005 DONE
Permit Ready to Issue  7/20/2005 DONE
Telephone call  7/20/2005 DONE
lft vm with john day ###-#### that permit and fees are ready to be picked up
Routing - PLAN CHECK6/17/2005 7/14/2005 PASS
The IBC plan review was started on July 13, 2005 and was finished the next day. See the plan review report for project information. The drawings were approved.
Application received  6/16/2005  
Recd Pcfee & Taken To Pln CK  6/16/2005  
Plans ACCEPTED BY PLAN TECH  6/16/2005  
Fee Review-notes6/16/20056/16/2005