Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD05-01661
StatusFinaled
Name SAGE CONSTRUCTION
Site Address 10870 W FAIRVIEW AVE
Project NameFAIRVIEW BUSINESS PARK
Customer Number 
ePlanReviewNo
Description
Fairview Business Park - (Retail Shell Building #A) - To construct a new 6,000 square foot, one story, masonry and wood framed retail shell building and related site improvements. This is a shell permit only and no occupancy is allowed under this permit. Separate tenant improvement permit will be required to finish this building for occupancy. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD1/8/20071/8/20073/1/2007 DONE
Second Notice has not been responded to.
Second Notice BLD9/25/20069/25/20061/8/2007 DONE
First Notice has not been responded to.
First Notice7/25/20067/25/20069/25/2006 DONE
DetailsJim Sly
BLD-Final7/25/20067/25/20067/25/2006PPASS
DetailsJim Sly
tim opp - call 1/2 hr prior to meet there; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
C/C issued
DOC - Permit Finaled7/25/20067/25/20067/25/2006PPASS
DetailsJim Sly
Code Occupancy Approval7/24/20067/24/20067/24/2006APASS
DetailsCarol Montgomery
Meets compliance with DRH05-00097 - Signed Final (7-21-2006)
FIRE-Final Inspection7/20/20067/20/20067/20/2006PPASS
DetailsTroy Cobbley
Life safety finaled
FIRE-Conference6/21/20066/22/20066/22/2006PDONE
DetailsTroy Cobbley
I went over the life safety comments with the contractor
BLD-Framing/Rough-in11/9/200511/10/200511/10/2005ACANC
DetailsJim Sly
tim ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in11/7/200511/8/200511/8/2005PPART
DetailsMike Jordan
tim opp; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Steelstuds at storefront on bldg A.
BLD-Framing/Rough-in11/7/200511/7/200511/7/2005PPART
DetailsJim Sly
tim Note: steelhead framing; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Other10/28/200511/1/200511/1/2005PCANC
DetailsJim Sly
joe Note: underground r/i; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in10/28/200510/31/200510/31/2005PPART
DetailsMike Jordan
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Bldg. A trusses and roog sheeting. Contractor to get RFI from engineer for deletion of hangars on blocking and straps at east end of roof.
BLD-Other10/19/200510/20/200510/20/2005PDEFR
DetailsMike Jordan
kim Note: structural masonery walls; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Contractor is receiving special insp.
BLD-Other10/19/200510/19/200510/19/2005PPART
DetailsMike Jordan
kim Note: structural masonery walls; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Other10/12/200510/14/200510/14/2005PDEFR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/12/2005 at 6:45:21 PM. Contact: ###-####. Masonry insp. Contractor is getting special insp.
BLD-Other10/12/200510/13/200510/13/2005PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/12/2005 at 6:44:21 PM. Contact: ###-####. Masonry inspection. Reinforcement above lintels has been repaired and verified by special inspector.
BLD-Other10/11/200510/12/200510/12/2005PFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/11/2005 at 11:51:37 AM. Inadequate reinforcement over lintels on north wall. Not per approved plans. Special inspector to verify repair.
BLD-Foundation9/9/20059/9/20059/9/2005PPASS
DetailsJim Sly
larry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing9/2/20059/6/20059/6/2005PPASS
DetailsMike Jordan
larry black ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. (next door to D.I.) footing ok. no special inspection required for conc. Will be required for masonry and welding.
(F) Reprint permit  8/26/2005  
Issue PAID IN FULL permit  8/25/2005  
Inspection Record Card- Bld  8/24/2005 DONE
Permit Ready to Issue  8/24/2005 DONE
Routing - PLANNING8/23/2005 8/23/2005 PASS
Approved.
Routing - PLAN CHECK8/23/2005 8/23/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/23/2005 DONE
Plan assigned to (JCM)6/21/2005 8/23/2005 PASS
8/23/2005 10:08:05 JCM - activity updated through activity BLDA022 from case BLD05-01661.
Routing - PLAN CHECK7/20/2005 8/18/2005  
Routing - PUBLIC WORKS8/18/2005 8/18/2005 PASS
Plan Reviewer's activity  8/2/2005 PASS
Reviewed and approved final structural resubmittal. JCM
Plan resubmittals received  7/29/2005  
Received (2) copies of sheet S-0. Routed to John M.
Plan resubmittals requested  7/25/2005 DONE
Faxed the architect a copy of the comment list from the consulting structural engineer requesting additonal revisions. JCM
Routing Off Site - STRUCTURAL7/21/2005 7/22/2005 FAIL
Received comment list from consulting structural engineer requesting additional revisions. JCM
Plan resubmittals received  7/21/2005 DONE
Received 3 Structural reviews & 3 Copys of sheet S-0 Taken to John M.
Routing - FIRE7/14/2005 7/20/2005 PASS
1st review completed  7/20/2005 FAIL
Failed planning, public works and structural
Plan resubmittals requested  7/15/2005 DONE
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL6/29/2005 7/15/2005 FAIL
Routed to Engineer. Received comment list from consulting structural engineer requesting revisions. JCM
Routing - PLANNING7/11/2005 7/14/2005 FAIL
Landscape plan that complies with Design Review needs to be resubmitted; note condition 1c.
Routing - PLAN CHECK7/14/2005 7/14/2005 PASS
Reviewed and approved resubmittals. JCM
Plan resubmittals received  7/14/2005  
Received (2) copies of sheet A0 and A1. Routed to John M.
Routing - PLUMBING7/8/2005 7/11/2005 PASS
per plans and 2003 upc.
Routing - PUBLIC WORKS7/1/2005 7/8/2005 FAIL
Failed by James Pardy - contact at ###-####
Sanitary sewer is intended to be public, therefor separate sewer plans need to be submitted to public works for approval.
Routing - Erosion and Sediment7/8/2005 7/8/2005 PASS
ESC plan approved with attached conditions. Reference ESC05-01052 as master plan for Fairview Business Park project.
Plan resubmittals requested  7/6/2005 DONE
Mailed the architect a copy of the plan review comment list requesting revisions. JCM
Routing - PLANNING Land Div6/29/2005 7/1/2005 PASS
Approved as Parcel B on ROS 5844.
Plans ACCEPTED BY PLAN TECH  6/29/2005  
Plan routing begun/NEW & ADDTN  6/29/2005  
Recd Pcfee & Taken To Pln CK  6/21/2005 DONE
Application received  6/21/2005  
Fee Review-notes6/21/20056/21/2005