Second Notice BLD | 7/7/2006 | 7/7/2006 | 8/18/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/31/2006 | 7/7/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 5/31/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 11058 issued 5-31-06 to Insurance Network America.
|
Code Occupancy Approval | 5/26/2006 | 5/26/2006 | 5/26/2006 | P | PASS |
Wm. Michael Meloy
|
|
|
Compliance met.
|
Permanent Occupancy | | 5/26/2006 | 5/26/2006 | | DONE |
|
|
|
|
BLD-Aging Inspection | 5/16/2006 | 5/16/2006 | 5/16/2006 | | PASS |
Jim Storey
|
|
|
insp all done .
|
FIRE-Final Inspection | 3/13/2006 | 3/13/2006 | 3/13/2006 | P | PASS |
Forrest France
|
|
|
The project related alarm and sprinkler have been approved, fire life safety finaled.
|
Telephone call | | | 3/6/2006 | | DONE |
|
|
|
I called Ben Davis, Dave Evans Const. reminding him the 2/16 agreement for the TOC on this permit was based on having the sprinkler and alarm work finaled within 7 days, or no later than 3/1. The sprinkler work was just finaled on 3/3 and we haven't heard form the FA contractor. He will followup and get the FA inspection scheduled today.
|
BLD-Final | 2/17/2006 | 2/17/2006 | 2/17/2006 | P | PART |
Jim Storey
|
|
|
temp ok pending fire approvals and door moved to meet accessable aproch clearances.
|
BLD-Final | 2/16/2006 | 2/17/2006 | 2/17/2006 | A | NR |
Jim Storey
|
|
|
|
Temporary occupancy | | | 2/17/2006 | | |
|
|
|
Temp. Occ. Cert. # 5373 issued 2-17-06 to Insurance Network America.
|
BLD-Final | 2/16/2006 | 2/16/2006 | 2/16/2006 | P | NR |
Jim Storey
|
|
|
Ben; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
FIRE-Final Inspection | 2/15/2006 | 2/16/2006 | 2/16/2006 | | PART |
Forrest France
|
|
|
Fire life safety is acceptable pending resolution of item # 1 on the building fire code review notes for provision of one hour construction at the riser room or PIV installation. NOTE: if a PIV is installed, the valve must be electrically supervised for which an alarm permit is required.
2/17/06 - Approved by D. Hanneman for TOC based on AS and FA permit modifications having been submitted today for the Wall PIV modification and monitoring and written assurance from AS and FA contractors that work will be completed within 7 days. SLR
|
BLD-Conference | 2/13/2006 | 2/13/2006 | 2/14/2006 | P | PASS |
Jim Storey
|
|
|
ben; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
FIRE-Final Inspection | 2/8/2006 | 2/8/2006 | 2/8/2006 | P | FAIL |
Troy Cobbley
|
|
|
Need fire life safety review comments. Fire dept access signage is an issue as well as one additional emergency light is required in the fire sprinkler riser room. The fire sprinkler permits need finaling as well. The big issue with it is the riser room was required to be one hour rated and it is not. No inspection was done on the fire sprinkler system.
|
BLD-Aging Inspection | 1/24/2006 | 1/24/2006 | 1/24/2006 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Framing/Rough-in | 11/21/2005 | 11/22/2005 | 11/22/2005 | A | PART |
Jim Storey
|
|
|
ben; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa bld ok for cover pending fire approval.
|
FIRE-Conference | 11/3/2005 | 11/3/2005 | 11/3/2005 | P | DONE |
Forrest France
|
|
|
On site discussion with Ben regarding insulation issues as they affect fire sprinklers in the attic and dormer areas.
|
BLD-Framing/Rough-in | 10/25/2005 | 10/25/2005 | 10/25/2005 | P | NR |
Jim Storey
|
|
|
ben Note: please call 1/2 hr prior to inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 10/11/2005 | 10/11/2005 | 10/12/2005 | P | PART |
Jim Storey
|
|
|
ben; Phone #: ###-#### Internet Inspection Request from: Barbara Moore walls ok to insulate only.
|
BLD-Framing/Rough-in | 9/23/2005 | 9/23/2005 | 9/23/2005 | P | PASS |
Jim Storey
|
|
|
fire rated soffit//ben; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 9/19/2005 | 9/19/2005 | 9/19/2005 | P | PART |
Jim Storey
|
|
|
fire rated soffet insp --ben ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie re do light boxes.
|
BLD-Other | 8/30/2005 | 8/31/2005 | 8/31/2005 | A | PASS |
Jim Storey
|
|
|
ben Note: spec in hole down; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles added more hds at north wal ok
|
BLD-Framing/Rough-in | 8/26/2005 | 8/29/2005 | 8/29/2005 | A | PASS |
Jim Storey
|
|
|
shear nail inspection please///corner of federal way & overland////ben; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need fix for noth end straps that missed layout ok to cover.
|
BLD-Concrete | 8/8/2005 | 8/8/2005 | 8/8/2005 | P | PASS |
Jim Storey
|
|
|
ben davis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Foundation | 7/22/2005 | 7/22/2005 | 7/22/2005 | P | PASS |
Jim Storey
|
|
|
dave ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Footing | 7/21/2005 | 7/21/2005 | 7/21/2005 | P | CANC |
Jim Storey
|
|
|
|
BLD-Footing | 7/21/2005 | 7/21/2005 | 7/21/2005 | P | PASS |
Jim Storey
|
|
|
dave ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Footing | 7/20/2005 | 7/21/2005 | 7/21/2005 | A | CANC |
Jim Storey
|
|
|
Late am please////dave; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
(F) Reprint permit | | | 7/14/2005 | | |
|
|
|
|
OVERRIDE | | | 7/13/2005 | | |
|
|
|
|
OVERRIDE | | | 7/13/2005 | | |
|
|
|
|
OVERRIDE | | | 7/13/2005 | | |
|
|
|
|
OVERRIDE | | | 7/13/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/13/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/13/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/13/2005 | | DONE |
|
|
|
|
Telephone call | | | 7/13/2005 | | DONE |
|
|
|
tlk to travis dale evans construction - ###-#### that permit and fees are ready to be picked up
|
Inspection Record Card- Bld | | | 7/13/2005 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/13/2005 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 6/21/2005 | | 7/11/2005 | | PASS |
|
|
|
7/11/2005 16:23:01 JCM - activity updated through activity BLDA022 from case BLD05-01669.
|
Routing - PLANNING Land Div | 7/8/2005 | | 7/11/2005 | | PASS |
|
|
|
Approved. Eighteen Undivided Subdivision recorded.
|
Routing - PUBLIC WORKS | 7/11/2005 | | 7/11/2005 | | PASS |
|
|
|
Plans routed back for a new address.
|
Routing - PLAN CHECK | 7/11/2005 | | 7/11/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/11/2005 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/5/2005 | | 7/8/2005 | | |
|
|
|
|
Routing - FIRE | 6/28/2005 | | 7/5/2005 | | PASS |
|
|
|
review faxed to architect
|
1st review completed | | | 7/5/2005 | | FAIL |
|
|
|
failed planning land div.
|
Routing - PLANNING | 6/24/2005 | | 6/28/2005 | | PASS |
|
|
|
Approved per DRH04-00128. Applicant is to be submitting revised drawings to DR staff to update DR file in accordance with the submitted building plans.
|
Routing - PLAN CHECK | 6/28/2005 | | 6/28/2005 | | PASS |
|
|
|
This building was previously reviewed and approved under BLD04-02230. JCM
|
Routing - PLUMBING | 6/23/2005 | | 6/24/2005 | | PASS |
|
|
|
water service on civil plans shall be increased to 1 1/2".
|
Routing - PUBLIC WORKS | 6/22/2005 | | 6/23/2005 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 6/23/2005 | | 6/23/2005 | | PASS |
|
|
|
ESC approved with attached conditions.
|
Plans ACCEPTED BY PLAN TECH | | | 6/22/2005 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 6/22/2005 | | |
|
|
|
|
Routing - PLANNING Land Div | 6/22/2005 | | 6/22/2005 | | FAIL |
|
|
|
Do not issue building permit until Final Plat of Eighteen Undivided Subdivision is recorded. (Lot 8, Block 1)
|
Application received | | | 6/21/2005 | | |
|
|
|
|
Override - Parcel Holds | | | 6/21/2005 | | |
|
|
|
|
Third Notice BLD | 8/18/2006 | 8/18/2006 | | | |
|
|
|
Second Notice has not been responded to.
|
Fee Review-notes | 6/21/2005 | 6/21/2005 | | | |
|
|
|
|