Case Summary (BLD) | | | 2/22/2008 | | DONE |
|
|
|
|
Office Staff conference/action | | | 3/16/2007 | | DONE |
|
|
|
refund requesed by city. Did not grant one, because of 500.00 plan mod. waived.
|
Fee Review-notes | 6/23/2005 | 6/23/2005 | 3/9/2007 | | DONE |
|
|
|
|
First Notice | 2/12/2007 | 2/12/2007 | 3/1/2007 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 2/9/2007 | 2/12/2007 | 2/12/2007 | A | PASS |
Jim Sly
|
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Victoria Beall Final OK........C/C issued.
|
DOC - Permit Finaled | 2/12/2007 | 2/12/2007 | 2/12/2007 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 2/8/2007 | 2/8/2007 | 2/8/2007 | P | CANC |
Jim Sly
|
|
|
|
BLD-Final | 2/7/2007 | 2/8/2007 | 2/8/2007 | A | CANC |
Jim Sly
|
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Final | 2/8/2007 | 2/8/2007 | 2/8/2007 | P | CANC |
Jim Sly
|
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
CHANGE STATUS TO (ISS) | | | 2/7/2007 | | DONE |
|
|
|
reissue never was finaled
|
BLD-Final | 11/21/2006 | 11/21/2006 | 11/21/2006 | P | NR |
Jim Sly
|
|
|
Pat, late afternoon if possible = ); Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt Verify if P/W wants to final.
|
FIRE-Final Inspection | 11/21/2006 | 11/21/2006 | 11/21/2006 | P | PASS |
Troy Cobbley
|
|
|
life safety already finaled on the 16th
|
FIRE-Final Inspection | 11/16/2006 | 11/16/2006 | 11/16/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
BLD-Final | 10/31/2006 | 11/3/2006 | 11/2/2006 | P | CANC |
Jim Sly
|
|
|
pat - ###-#### Inspection cancelled from web by: Cathy Weisshaupt
|
FIRE-Final Inspection | 10/31/2006 | 11/3/2006 | 11/2/2006 | P | CANC |
Troy Cobbley
|
|
|
pat - ###-#### Inspection cancelled from web by: Cathy Weisshaupt
|
(F) Reprint permit | | | 11/2/2006 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 10/31/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 10/31/2006 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/31/2006 | | |
|
|
|
|
Telephone call | | | 10/31/2006 | | DONE |
|
|
|
lft vm to lawrence bennett ###-#### that modification permit is ready to be picked up
|
CHANGE STATUS TO (ISS) | | | 10/31/2006 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 10/31/2006 | | |
|
|
|
|
Plan assigned to (M_P) | 10/17/2006 | 10/17/2006 | 10/30/2006 | | PASS |
|
|
|
10/30/2006 11:29:55 M_P - activity updated through activity BLDA022 from case BLD05-01690.
|
Routing - PLAN CHECK | 10/30/2006 | | 10/30/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/30/2006 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 10/30/2006 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 10/30/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/30/2006 | | DONE |
|
|
|
|
Routing - FIRE | 10/26/2006 | | 10/30/2006 | | PASS |
|
|
|
Attached updated review comments to plans.
|
Routing - PLAN CHECK | 10/20/2006 | | 10/26/2006 | | PEND |
|
|
|
PLAN MODIFICATION
Mike Phillips
|
Case Summary (BLD) | | | 10/26/2006 | | |
|
|
|
|
Routing - Erosion and Sediment | 10/19/2006 | | 10/20/2006 | | PASS |
|
|
|
No plan modification required or submitted.
|
Routing - PLANNING | 10/18/2006 | | 10/19/2006 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 10/18/2006 | | 10/18/2006 | | PASS |
|
|
|
|
Plan Modification Accepted | | | 10/17/2006 | | |
|
|
|
Plan Modification accepted for the redesign of road on one sheet of one. No fees charged per Marlene S
|
FIRE-Final Inspection | 10/2/2006 | 10/3/2006 | 10/4/2006 | A | FAIL |
Troy Cobbley
|
|
|
The plans need to be resubmitted since the fire dept. access roadway has changed significantly. All other items appear ok.
|
BLD-Final | 9/28/2006 | 9/29/2006 | 9/29/2006 | A | NR |
Jim Sly
|
|
|
pat; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Framing/Rough-in | 8/1/2006 | 8/2/2006 | 8/2/2006 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/1/2006 at 3:36:56 PM. CMU walls Special insp req
|
BLD-Other | 5/31/2006 | 6/1/2006 | 6/1/2006 | P | PASS |
Jim Sly
|
|
|
tab Note: elevate roof slab; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Last pour.........OK pending special inspection.......reports and approvals, and approval by Structural Engineer of record.
|
BLD-Final | 4/27/2006 | 4/28/2006 | 4/28/2006 | A | PART |
Jim Sly
|
|
|
PAT; Phone #: ###-#### Internet Inspection Request from: Darla Downs Last pour on large tank walls......OK pending special insp by Rick Cummings and MTI tests and approvals.
|
BLD-Concrete | 4/25/2006 | 4/25/2006 | 4/25/2006 | P | PART |
Jim Sly
|
|
|
pat Note: reinforcement ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Utilidor Slabs OK pend MTI special insp tests and approvals.
|
BLD-Foundation | 4/19/2006 | 4/20/2006 | 4/20/2006 | A | PART |
Jim Sly
|
|
|
Pat\\ will pour in the pm on 4-20-06; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung S. E. corner....Wall insp. OK Pending special insp by Rick Cummings and MTI inspection, tests and approvals.
|
BLD-Framing/Rough-in | 4/10/2006 | 4/11/2006 | 4/11/2006 | A | PART |
Jim Sly
|
|
|
Pat -- concrete walls; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong North wall and Remainder of E wall.....OK pending MTI special insp tests and approvals
|
BLD-Framing/Rough-in | 3/24/2006 | 3/27/2006 | 3/27/2006 | A | PART |
Jim Sly
|
|
|
Pat -- concrete wall inspection; pouring at 12:00; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong Tall wall at West Tank Completion of North wall ....and N. W. 1/2 of West wall. Pending special insp, tests and approvals.
|
BLD-Framing/Rough-in | 3/13/2006 | 3/15/2006 | 3/15/2006 | A | PART |
Jim Sly
|
|
|
Pat -- wall concrete placement for filtrate tanks; pouring concrete at noon; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong Center section of South wall includes "T" section measuring 15'x15'x15'. 4000lb psi concrete required. Test results on previously poured sections at 7 day coming in at around 5800psi.
|
BLD-Framing/Rough-in | 3/6/2006 | 3/8/2006 | 3/8/2006 | A | PART |
Jim Sly
|
|
|
Pat -- for filtrate tank first wall pore; pouring at 10 AM; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong partial section of 20' high wall.
|
BLD-Footing | 2/23/2006 | 2/24/2006 | 2/24/2006 | A | PART |
Jim Sly
|
|
|
Pat -- will be pouring at noon; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong Pouring footing at SW and SE section of Bldg..........Special inspection by Rick Cummings and MTI.
|
BLD-Aging Inspection | 2/13/2006 | 2/13/2006 | 2/21/2006 | | DONE |
Jim Sly
|
|
|
WIP
|
Issue PAID IN FULL permit | | | 11/3/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/30/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/30/2005 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/17/2005 | | 9/29/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/29/2005 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 9/29/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/29/2005 | | DONE |
|
|
|
|
Telephone call | | | 9/29/2005 | | DONE |
|
|
|
Spoke with Bill Freeman and the contract for the GC & RP goes out to bid next week so will be at least a month before pick up////9/29/05 5:00pm BAS
|
Plan assigned to (M_P) | 6/23/2005 | | 9/29/2005 | | PASS |
|
|
|
9/29/2005 13:16:09 M_P - activity updated through activity BLDA022 from case BLD05-01690.
|
Routing Off Site - STRUCTURAL | 9/16/2005 | | 9/21/2005 | | PASS |
|
|
|
Called PDQ for pick up
|
Plan resubmittals received | | | 9/14/2005 | | DONE |
|
|
|
Received 3 Structural Calcs, 3 Project Start Up for Special Inspections,3 Miscellaneous Metal Work & 4 Copys of sheets W-MIS-ST-400,W-MIS-ST-404,W-MIS-ST-405,W-FLT-ST-401,W-FLT-ST-403,W-FLT-ST-406 Taken to Mike P.
|
Telephone call | | | 9/6/2005 | | DONE |
|
|
|
The following email was sent in reply to inquiry by Bill Freeman about requirements for temporary FD access roadway. "Roads, at least of an approved temporary nature must be in place prior to storage of combustibles on site or construction using combustible materials. The FD may approve temporary use of unpaved roadways which are constructed of compacted gravel which has sufficient load-bearing capability and will be usable during adverse weather conditions. Contact the Fire Marshal, Dave Hanneman for further details on such a temporary roadway."
|
Routing - FIRE | 8/12/2005 | | 8/17/2005 | | PASS |
|
|
|
resubmittal acceptable. Review comments faxed to architect.
|
Plan resubmittals received | | | 8/12/2005 | | |
|
|
|
revied site plan received
|
Meeting | | | 8/9/2005 | | DONE |
|
|
|
*:15 am met with Bill Freeman reviewed plans which are indiscernable as to fire related features. He will bring back additional plans to supplement to verify FD access roadways(new and existing), hydrants, correct designation of construction which is actually part of this project and that which is future, etc.
|
1st review completed | | | 8/8/2005 | | FAIL |
|
|
|
failed plan check and fire.
|
Routing - FIRE | 7/26/2005 | | 8/8/2005 | | FAIL |
|
|
|
cannot determine FD access or haz mat's exposures. Emailed Bill Freeman to discuss further. Holding plans until I can discuss with Bill.
|
Routing - PLAN CHECK | 6/28/2005 | | 7/26/2005 | | FAIL |
|
|
|
Plan review complete, sent correction report to Bill Freeman requesting additional information be submitted for further review prior to issuing permit.
|
Case Summary (BLD) | | | 7/26/2005 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 6/23/2005 | | 7/13/2005 | | FAIL |
|
|
|
E-mailed comment to Bill Freeman. Additional information requried for further review by our outside engineering firm.
|
Routing - PLANNING | 6/28/2005 | | 6/28/2005 | | PASS |
|
|
|
Subject to compliance w/ CUP modification.
|
Routing - PLUMBING | 6/27/2005 | | 6/28/2005 | | PASS |
|
|
|
permit any potable water or sanitary sewer waste and vent piping.
|
Routing - Erosion and Sediment | 6/24/2005 | | 6/27/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 6/23/2005 | | 6/24/2005 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 6/23/2005 | | 6/23/2005 | | PASS |
|
|
|
Site is over 5 acres in size.
|
Plans ACCEPTED BY PLAN TECH | | | 6/23/2005 | | |
|
|
|
Ok per Mike P. to take in ///dld
|
Plan routing begun/NEW & ADDTN | | | 6/23/2005 | | |
|
|
|
|
Application received | | | 6/23/2005 | | |
|
|
|
|