Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-01698
StatusFinaled
Name VP DEVELOPMENT LLC
Site Address 2812 W LEMHI ST
Project Name 
Customer Number 
ePlanReviewNo
Description
MASTER FILE #05-03-003 "THE PERMIT HOLDER is responsible to comply with current wall bracing requirements as adopted by Boise City." To construct a three bedroom, two and half bathroom 1259 sq. ft. two story single family residence with a attached 235 sq. ft. single car garage with a 48 sq. ft. covered front porch. Per approved plans, engineering and requirement list. (SAM) MASTER FILE #05-03-003
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/6/200512/7/200512/7/2005PPASS
DetailsTom Arcoraci
chuck; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
DOC - Permit Finaled12/7/200512/7/200512/7/2005PPASS
DetailsTom Arcoraci
BLD-Energy code compliance10/4/200510/5/200510/5/2005APASS
DetailsMike Jordan
chuck; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in9/30/20059/30/20059/30/2005PPASS
DetailsTom Arcoraci
chuck; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Foundation8/9/20058/10/20058/10/2005APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/9/2005 at 1:04:59 PM. Contact: ###-####. Stemwall placed on previous day
BLD-Footing8/8/20058/8/20058/8/2005PPART
DetailsTom Arcoraci
chuck story ###-#### wip ok
Issue PAID IN FULL permit  8/8/2005 DONE
Permit Ready to Issue  7/12/2005 DONE
Inspection Record Card- Bld  7/12/2005 DONE
Telephone call  7/12/2005  
tlk to vp devel that permits and fees are ready to be picked up
Plan assigned to (SAM)6/23/20057/11/20057/11/2005 PASS
7/11/2005 11:38:25 SAM - activity updated through activity BLDA022 from case BLD05-01698.
Routing - PLAN CHECK6/29/2005 7/11/2005 PASS
Case Summary (BLD)  7/11/2005  
PLANS/APPL TAKEN TO FRONT DESK  7/11/2005 DONE
Routing - PUBLIC WORKS6/29/2005 6/29/2005 PASS
Application received  6/23/2005  
Routing - PLANNING6/23/2005   PASS
verify lot split