Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD05-01701
StatusFinaled
Name C W CONSTRUCTION
Site Address 1212 W ROSSI ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a new 1342s.f. 2-stoey single family dwelling with 776s.f. on the upper level and 566s.f. of living space and a 214s.f. attached 1-car garage on the main level. "The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City." R-3D ok per Evelyn Grime with approval of ROS05-00022 by David Abo. All per the approved plans as marked REScheck and plan review notes. PC# 668 pep
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/5/20065/8/20065/8/2006APASS
DetailsJim Storey
Internet Inspection Request from: Barbara Moore
DOC - Permit Finaled5/8/20065/8/20065/8/2006PPASS
DetailsJim Storey
BLD-Final5/4/20065/5/20065/5/2006AFAIL
DetailsJim Storey
brian Note: please call for code; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles no access na on phone#
BLD-Energy code compliance12/9/200512/12/200512/12/2005APASS
DetailsJim Storey
lon; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in12/7/200512/8/200512/8/2005PPASS
DetailsDave Hannah
ron; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
(F) Reprint permit  12/8/2005 DONE
BLD-Footing9/27/20059/27/20059/27/2005PPASS
DetailsMike Jordan
darren; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Issue PAID IN FULL permit  8/30/2005 DONE
Permit Ready to Issue  8/29/2005 DONE
Inspection Record Card- Bld  8/29/2005 DONE
Telephone call  8/29/2005 DONE
left mess that permit is ready
Plan assigned to (SAM)6/23/20056/23/20058/26/2005 PASS
8/26/2005 13:43:16 PEP - activity updated through activity BLDA022 from case BLD05-01701.
Plan assigned to (PEP)8/25/2005 8/26/2005 PASS
8/26/2005 13:43:16 PEP - activity updated through activity BLDA022 from case BLD05-01701.
Case Summary (BLD)  8/26/2005  
Case Summary (BLD)  8/26/2005  
PLANS/APPL TAKEN TO FRONT DESK  8/26/2005 DONE
Routing - PUBLIC WORKS8/8/2005 8/8/2005 PASS
Routing - PLANNING Land Div8/8/2005 8/8/2005 PASS
D. Abo verified ros complete.
Routing - PLANNING8/8/2005 8/8/2005 PASS
site plan approved as noted. eeg.
Application received  6/23/2005  
Routing - PLANNING6/23/2005   FAIL
verify ROS complete and existing structures removed.eeg.
Routing - PLAN CHECK8/8/2005