BLD-Final | 5/9/2007 | 5/10/2007 | 5/10/2007 | P | PASS |
Tony Young
|
|
|
Charlie, please call 1st c of o issued
|
DOC - Permit Finaled | 5/10/2007 | 5/10/2007 | 5/10/2007 | P | PASS |
Tony Young
|
|
|
|
Override - People Holds | | | 5/9/2007 | | |
|
|
|
|
BLD-Grading Inspection | 10/26/2006 | 10/26/2006 | 10/26/2006 | | DONE |
|
|
|
Final grading and drainage approved
|
BLD-Final | 8/23/2006 | 8/24/2006 | 8/25/2006 | A | PART |
Dave Hannah
|
|
|
kathryn - occupancy insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley needs terry to sign off and plb to go final I walked house no life safty items ok to start moveing in
|
BLD-Energy code compliance | 2/23/2006 | 2/24/2006 | 2/24/2006 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 2/23/2006 at 4:44:24 PM. Contact: ###-####. pending plumbing pass
|
BLD-Framing/Rough-in | 2/21/2006 | 2/22/2006 | 2/22/2006 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 2/21/2006 at 4:36:17 PM. Contact: ###-####. ok to insulate all.. plumbing is ok for cover except around master bath area
|
BLD-Framing/Rough-in | 2/16/2006 | 2/17/2006 | 2/17/2006 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 2/16/2006 at 4:22:21 PM. Contact: ###-####. 1st and 2nd floor ok to insulate
|
BLD-Framing/Rough-in | 2/14/2006 | 2/15/2006 | 2/15/2006 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 2/14/2006 at 4:46:42 PM. Contact: ###-####. need trades 1st
|
BLD-Framing/Rough-in | 2/9/2006 | 2/10/2006 | 2/10/2006 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 2/9/2006 at 4:15:07 PM. Contact: ###-####. conf. only
|
BLD-Other | 1/11/2006 | 1/12/2006 | 1/12/2006 | A | PASS |
Mike Jordan
|
|
|
exterior shear panels; Phone #: ###-####. Shear walls 3 and 4 were completed.
|
BLD-Other | 1/10/2006 | 1/11/2006 | 1/11/2006 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 1/10/2006 at 3:52:05 PM. Contact: ###-####. need to do per plans,, conf. only
|
BLD-Foundation | 9/8/2005 | 9/8/2005 | 9/9/2005 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 9/8/2005 at 8:34:31 AM. Contact: ###-####.
|
BLD-Footing | 9/7/2005 | 9/7/2005 | 9/7/2005 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 9/7/2005 at 9:02:00 AM. Contact: ###-####. single story and shop?
|
BLD-Foundation | 8/23/2005 | 8/23/2005 | 8/23/2005 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 8/23/2005 at 9:13:55 AM. Contact: ###-####. basement wall,, wip
|
BLD-Footing | 8/11/2005 | 8/12/2005 | 8/12/2005 | A | PART |
Tony Young
|
|
|
ryan ###-####// Internet Inspection Request from: Letitia Mesa basement ftgs, wip
|
PubWorks Subgrade Approval | 6/28/2005 | 6/28/2005 | 8/11/2005 | | PASS |
|
|
|
Footing subgrade approved by the geotechnical engineer. 8/11/05
A letter from the applicant's geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####.
|
Override - Activity Holds | | | 8/9/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 8/9/2005 | | |
|
|
|
|
Override - Activity Holds | | | 8/9/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/9/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/9/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/9/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Override - Activity Holds | | | 8/9/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/9/2005 | | |
|
|
|
|
Plan assigned to (SRZ) | 8/4/2005 | 8/4/2005 | 8/8/2005 | | PASS |
|
|
|
8/8/2005 16:07:42 SRZ - activity updated through activity BLDA022 from case BLD05-01705.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2005 | | DONE |
|
|
|
ONE SET RED-LINED
|
Routing - PLAN CHECK | 7/28/2005 | | 8/8/2005 | | PASS |
|
|
|
Plans given to Marlene to issue grading permit MIS05-00112. Plans then passed on to Steve to do full building review. 7/28/05
|
Plan Reviewer's activity | | | 8/5/2005 | | DONE |
|
|
|
PENDING NEW BASEMENT PLAN WITH UPDATED LAYOUT. I SPOKE WITH THE BUILDER THOMAS SADANO ON 8/04/05.
|
Case Summary (BLD) | | | 8/5/2005 | | |
|
|
|
|
Plan assigned to (SAM) | 6/23/2005 | 6/23/2005 | 8/4/2005 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 8/4/2005 | | DONE |
|
|
|
I spoke with Thomas Sodano the builder on 8/04/05 about needing the beam calculations to complete the plan review. He said he would call his Lumber company and get those to me A.S.A.P.
(SRZ)
|
Routing - Erosion and Sediment | 7/28/2005 | | 7/28/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - Erosion and Sediment | 7/26/2005 | | 7/27/2005 | | FAIL |
|
|
|
ESC plan still does not meet requirements set forth in BMC 8-17. Informed PD.
Routed to Plan Review on 7/27/05.
|
Routing - PLAN CHECK | 7/20/2005 | | 7/27/2005 | | FAIL |
|
|
|
Routed plans for ESC for review on 7/26/05
|
Plan resubmittals received | | | 7/26/2005 | | |
|
|
|
Received resubmittal of ESC plan and narrative (2 sets). Routed to ESC.
|
Routing - Erosion and Sediment | 7/19/2005 | | 7/20/2005 | | FAIL |
|
|
|
ESC does not meet requirments per BMC 8-17.
|
Routing - FIRE | 7/20/2005 | | 7/20/2005 | | PASS |
|
|
|
No sprinklers required in Quail Ridge #5.
|
Routing - PLANNING | 7/19/2005 | | 7/19/2005 | | PASS |
|
|
|
Received second revised site plan plus reduced size from Tom S. Reviewed with Terry R. site plan approved as noted. Inspector to verify building location matches approved plan. eeg.
|
Plan Reviewer's activity | | | 7/14/2005 | | DONE |
|
|
|
Mr. Tom Sadano called and requested an early foundation start but, did not meet the requirements set forth for an early start permit. I explained to him that this project is within a hillside area. (SRZ)
|
Routing - PLANNING | 7/11/2005 | | 7/11/2005 | | |
|
|
|
received updated site plan from applicant. Driveway approved as noted - verify top of slope line with TR
|
Routing - PUBLIC WORKS GRADING | 6/23/2005 | | 6/28/2005 | | PASS |
|
|
|
Approved as Category 3
|
Routing - PUBLIC WORKS | 6/28/2005 | | 6/28/2005 | | PASS |
|
|
|
|
Application received | | | 6/23/2005 | | |
|
|
|
|
Routing - PLANNING | 6/28/2005 | | | | FAIL |
|
|
|
driveway exceeds allowable width in front setback - dual drive shown. Verify top of slope line for setbacks. eeg.
|