Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD05-01705
StatusFinaled
Name CHARLIE MITCHELL
Site Address 4906 N QUAIL SUMMIT WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
HIllside. ESC05-01077 and MIS05-00112 issued prior to this permit to perform excavation. * To construct a 6360sq.ft. two story with finished basement single family dwelling (2175sq.ft. Main level / 2285sq.ft. Second level / 1262sq.ft. finished basement / 638sq.ft. open storage) with a 498sq.ft. Attached single bay garage, a 528sq.ft. double bay garage Attached by a 86sq.ft. Covered concrete breeze way, a 684sq.ft. Covered rear patio and a 83sq.ft. Covered front porch per approved plans, Engineering, all red-lining, and Plan review report. THIS LOT IS WITHIN A HILLSIDE AREA AND IS SUBJECT TO THE HILLSIDE ORDINANCES. A CLASS "A" ROOF SYSTEM AND DEFENSIBLE AREA WILL BE MAINTAINED. (SRZ)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/9/20075/10/20075/10/2007PPASS
DetailsTony Young
Charlie, please call 1st
c of o issued
DOC - Permit Finaled5/10/20075/10/20075/10/2007PPASS
DetailsTony Young
Override - People Holds  5/9/2007  
BLD-Grading Inspection10/26/200610/26/200610/26/2006 DONE
Final grading and drainage approved
BLD-Final8/23/20068/24/20068/25/2006APART
DetailsDave Hannah
kathryn - occupancy insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley needs terry to sign off and plb to go final I walked house no life safty items ok to start moveing in
BLD-Energy code compliance2/23/20062/24/20062/24/2006PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 2/23/2006 at 4:44:24 PM. Contact: ###-####.
pending plumbing pass
BLD-Framing/Rough-in2/21/20062/22/20062/22/2006APART
DetailsTony Young
Scheduled by a contractor via Hello! on 2/21/2006 at 4:36:17 PM. Contact: ###-####.
ok to insulate all.. plumbing is ok for cover except around master bath area
BLD-Framing/Rough-in2/16/20062/17/20062/17/2006PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 2/16/2006 at 4:22:21 PM. Contact: ###-####.
1st and 2nd floor ok to insulate
BLD-Framing/Rough-in2/14/20062/15/20062/15/2006PNR
DetailsTony Young
Scheduled by a contractor via Hello! on 2/14/2006 at 4:46:42 PM. Contact: ###-####.
need trades 1st
BLD-Framing/Rough-in2/9/20062/10/20062/10/2006PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 2/9/2006 at 4:15:07 PM. Contact: ###-####.
conf. only
BLD-Other1/11/20061/12/20061/12/2006APASS
DetailsMike Jordan
exterior shear panels; Phone #: ###-####. Shear walls 3 and 4 were completed.
BLD-Other1/10/20061/11/20061/11/2006PFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 1/10/2006 at 3:52:05 PM. Contact: ###-####.
need to do per plans,, conf. only
BLD-Foundation9/8/20059/8/20059/9/2005PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 9/8/2005 at 8:34:31 AM. Contact: ###-####.
BLD-Footing9/7/20059/7/20059/7/2005PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 9/7/2005 at 9:02:00 AM. Contact: ###-####.
single story and shop?
BLD-Foundation8/23/20058/23/20058/23/2005PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 8/23/2005 at 9:13:55 AM. Contact: ###-####.
basement wall,, wip
BLD-Footing8/11/20058/12/20058/12/2005APART
DetailsTony Young
ryan ###-####// Internet Inspection Request from: Letitia Mesa
basement ftgs, wip
PubWorks Subgrade Approval6/28/20056/28/20058/11/2005 PASS
Footing subgrade approved by the geotechnical engineer. 8/11/05

A letter from the applicant's geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####.
Override - Activity Holds  8/9/2005  
Permit Ready to Issue  8/9/2005  
Override - Activity Holds  8/9/2005  
Inspection Record Card- Bld  8/9/2005 DONE
Print Occupancy Form  8/9/2005 DONE
Telephone call  8/9/2005 DONE
left mess that permit is ready
Override - Activity Holds  8/9/2005  
Issue PAID IN FULL permit  8/9/2005  
Plan assigned to (SRZ)8/4/20058/4/20058/8/2005 PASS
8/8/2005 16:07:42 SRZ - activity updated through activity BLDA022 from case BLD05-01705.
PLANS/APPL TAKEN TO FRONT DESK  8/8/2005 DONE
ONE SET RED-LINED
Routing - PLAN CHECK7/28/2005 8/8/2005 PASS
Plans given to Marlene to issue grading permit MIS05-00112. Plans then passed on to Steve to do full building review. 7/28/05
Plan Reviewer's activity  8/5/2005 DONE
PENDING NEW BASEMENT PLAN WITH UPDATED LAYOUT. I SPOKE WITH THE BUILDER THOMAS SADANO ON 8/04/05.
Case Summary (BLD)  8/5/2005  
Plan assigned to (SAM)6/23/20056/23/20058/4/2005 DONE
Plan Reviewer's activity  8/4/2005 DONE
I spoke with Thomas Sodano the builder on 8/04/05 about needing the beam calculations to complete the plan review. He said he would call his Lumber company and get those to me A.S.A.P.
(SRZ)
Routing - Erosion and Sediment7/28/2005 7/28/2005 PASS
ESC plan approved with attached conditions.
Routing - Erosion and Sediment7/26/2005 7/27/2005 FAIL
ESC plan still does not meet requirements set forth in BMC 8-17. Informed PD.

Routed to Plan Review on 7/27/05.
Routing - PLAN CHECK7/20/2005 7/27/2005 FAIL
Routed plans for ESC for review on 7/26/05
Plan resubmittals received  7/26/2005  
Received resubmittal of ESC plan and narrative (2 sets). Routed to ESC.
Routing - Erosion and Sediment7/19/2005 7/20/2005 FAIL
ESC does not meet requirments per BMC 8-17.
Routing - FIRE7/20/2005 7/20/2005 PASS
No sprinklers required in Quail Ridge #5.
Routing - PLANNING7/19/2005 7/19/2005 PASS
Received second revised site plan plus reduced size from Tom S. Reviewed with Terry R. site plan approved as noted. Inspector to verify building location matches approved plan. eeg.
Plan Reviewer's activity  7/14/2005 DONE
Mr. Tom Sadano called and requested an early foundation start but, did not meet the requirements set forth for an early start permit. I explained to him that this project is within a hillside area. (SRZ)
Routing - PLANNING7/11/2005 7/11/2005  
received updated site plan from applicant. Driveway approved as noted - verify top of slope line with TR
Routing - PUBLIC WORKS GRADING6/23/2005 6/28/2005 PASS
Approved as Category 3
Routing - PUBLIC WORKS6/28/2005 6/28/2005 PASS
Application received  6/23/2005  
Routing - PLANNING6/28/2005   FAIL
driveway exceeds allowable width in front setback - dual drive shown. Verify top of slope line for setbacks. eeg.